Practise Project Management Professional PMP scenario questions practice questions — original exam-style scenarios with answer choices, explanations, and analysis of common mistakes.
Focused practice
Practice scenario questions questions
Scored sessions drawing only from this domain — pick a length below.
Start 20-question practice test →What this domain covers
What to know about scenario questions
scenario questions questions test whether you can apply the concept in context, not just recognise a definition.
How the topic appears in realistic exam-style scenarios.
Which detail in the question changes the correct answer.
How to eliminate plausible but wrong options.
How to connect the question back to the wider exam objective.
Watch out for
Common scenario questions exam traps
- ▸Answering from memory before reading the full scenario.
- ▸Missing a constraint such as cost, availability, security, scope or command context.
- ▸Choosing a broad answer when the question asks for the most specific fix.
- ▸Ignoring why the wrong options are tempting.
Question index
All scenario questions questions (800)
Click any question to see the full explanation, or start a practice session above.
During project execution, a key executive stakeholder bypasses you and gives direct instructions to the development team, causing confusion about priorities. What should you do FIRST?
Medium2You are managing a hybrid project to develop a new mobile app. During the daily stand-up, two senior developers get into a heated argument about the technical approach for integrating a third-party API. The disagreement is causing tension and delaying progress. What should you do FIRST?
Medium3You are leading a distributed Scrum team. The product owner consistently interrupts the development team during sprints with new requirements, causing scope creep and reduced velocity. The team is frustrated. What should you do?
Hard4During a daily standup, a developer mentions a technical issue that will likely delay a user story by three days. What is the BEST action for the Scrum Master to take?
Easy5Your project is in the execution phase when an executive stakeholder bypasses you and gives direct orders to the team to add a new feature. This feature is not in the scope. Which TWO actions should you take?
Medium6Your agile team's velocity has dropped for the past three sprints. During the retrospective, team members mention they are overburdened with work from other departments. The project manager is not the team's direct manager. What should you do FIRST?
Medium7You are leading a hybrid project team consisting of both colocated and remote members. During a daily stand-up, two senior developers have a heated argument about the technical approach for a critical feature. The argument disrupts the meeting and creates tension. What should you do first?
Medium8An executive stakeholder bypasses you and directly gives instructions to the development team to add a new report. The team starts working on it. What should you do?
Medium9You are managing a software development project using a hybrid approach. The project has a fixed price contract with a strict deadline. Midway through, the customer requests a significant change that would increase the scope by 20%. You have already used all management reserve. What should you do FIRST?
Medium10You are managing a software development project using a hybrid approach. In the middle of a sprint, you discover that a team member has been working on a feature that was de-scoped in the last sprint review. The team member claims the product owner informally agreed to add it back. What should you do FIRST?
Medium11You are managing a software upgrade project. During a team meeting, two senior developers get into a heated argument over the best technical approach for a critical component. The disagreement is delaying progress. As the project manager, what should you do FIRST?
Medium12In a hybrid project, the development team is self-organizing but a senior developer consistently misses sprint commitments. The product owner is frustrated. What should the project manager do first?
Medium13Your construction project is 40% complete. The Earned Value Analysis shows CPI = 0.85 and SPI = 0.90. The project budget is $5M. A key vendor just informed you they cannot deliver a critical component on time, causing a 3-week delay. The component is on the critical path. What is the BEST action?
Hard14Your project is running 15% over budget at the midpoint. The sponsor asks you to reduce costs by cutting the testing phase from three weeks to one week. What should you do FIRST?
Medium15You are the project manager for a large infrastructure upgrade project. The project involves deploying new servers across multiple data centers. During the execution phase, you receive a report that one of the critical servers has failed a security compliance test. The security team states that the server must be reconfigured and retested, which will take two days. However, this server is on the critical path and any delay will push the project completion date. Your sponsor is pressing you to meet the original deadline. The project has a contingency reserve for schedule risks. What is the best course of action?
Hard16You are the project manager for a marketing campaign. During the planning phase, you identify a risk that a key graphic designer may leave the company. You decide to cross-train another team member as a backup. This is an example of which risk response?
Easy17A project manager is leading a cross-functional team that includes members from marketing, engineering, and finance. The team is struggling with collaboration because each department has different priorities and jargon. What should the project manager do to improve team cohesion?
Medium18You are managing a construction project. The sponsor has requested that you skip the testing phase to save time and meet an aggressive deadline. What should you do FIRST?
Medium19During the closure phase of a project, the customer is satisfied with the deliverables but refuses to sign the formal acceptance document, citing minor issues that were not part of the original scope. What should the project manager do FIRST?
Medium20A team member has been consistently underperforming, missing deadlines, and delivering low-quality work. You have had informal conversations but no improvement. What should you do NEXT?
Hard21A project manager is building a new team from scratch. To maximize team performance, which THREE actions should the project manager take during the forming stage?
Hard22During a project, you discover that a team member is being excluded from social interactions by others because of cultural differences. The team member has not complained, but you sense low morale. What should you do?
Medium23You are the project manager on a large infrastructure project. During execution, a new government regulation is announced that will affect your project's compliance requirements. The change is mandatory and must be implemented within 60 days, or the project will be shut down. What should you do first?
Hard24A project team is in the storming stage of development. The project manager wants to help the team move to the norming stage. Which action would BEST support this transition?
Easy25You are managing a software development project using a hybrid approach. Two senior developers have a recurring conflict about coding standards, which is causing delays in code reviews and affecting team morale. What should you do FIRST?
Medium26You are the project manager for a software development project using an agile methodology. The team is co-located and has been working together for three months. Recently, you notice that during daily stand-up meetings, the product owner often interrupts the team members to ask detailed technical questions, causing the meetings to run over the 15-minute timebox. Additionally, the team seems hesitant to share progress openly, and some members have started arriving late to the stand-up. The sprint backlog shows that velocity has dropped by 20% in the last two sprints. The product owner insists that the stand-up is the only time they have to get technical updates. What should the project manager do FIRST?
Easy27You are a project manager for a construction project that is experiencing delays due to unexpected soil conditions. The risk was identified and a contingency plan exists. Which TWO actions should you take?
Medium28You are managing a project to build a new office building. During excavation, the team discovers an unexpected archaeological site. This is a risk that was identified in the risk register with a low probability and high impact. The mitigation plan was to contact local authorities. What should you do FIRST?
Medium29A project manager is leading a hybrid project. During a sprint review, the product owner requests a significant scope change that would increase the product's value. The change does not affect the project's critical path. What should the PM do?
Medium30You are managing a project using a hybrid approach. During a sprint, the development team discovers a critical security vulnerability that was not identified during risk planning. The fix will require significant rework and will cause the sprint goal to be missed. What should the project manager do FIRST?
Hard31A project manager is using earned value management. At month 6 of a 12-month project, the EV is $50,000, PV is $60,000, and AC is $55,000. What is the cost performance index (CPI)?
Hard32Your project is being executed, and a risk event occurs that was identified and planned for. Which THREE actions should you take?
Hard33Your agile project has a stable velocity of 30 story points per sprint. In the last three sprints, velocity dropped to 25, 22, and 20. The team cites increased complexity in user stories. What should you do first as the Scrum Master?
Medium34During a retrospective, the team identifies that the root cause of low morale is the project manager's micromanagement style. The team wants more autonomy. What should the PM do?
Hard35A project manager is working on a portfolio of projects. One project has a business case that is no longer aligned with the organization's strategic goals due to a shift in market conditions. What should the project manager do?
Medium36In a Scrum project, the development team consistently fails to meet the sprint goal. The product owner is frustrated, and the team is demotivated. During the retrospective, the team identifies that the sprint backlog is too ambitious. What is the BEST action for the Scrum Master?
Medium37You are the project manager for a software development project using a hybrid approach. During the sprint review, the product owner is satisfied with the deliverables, but one key stakeholder requests a significant change that would add a new feature. The team has already started planning the next sprint. What should you do FIRST?
Medium38You are the project manager for a large infrastructure project. The project's CPI is 0.85 and SPI is 0.9. The team is working hard, but the project manager suspects that the cost performance is due to inaccurate estimates rather than inefficiency. The project sponsor is concerned about the budget overrun and asks you to cut costs by reducing quality inspections. What should you do?
Hard39Your project team includes members from diverse cultural backgrounds. You notice that some team members are reluctant to share their ideas in group settings due to cultural norms. What is the best approach to foster inclusion?
Easy40A project team is transitioning from a predictive to an agile approach. One team member is resistant to change and insists on detailed upfront planning. What is the best way for the project manager to address this resistance?
Easy41A project manager is closing a project that was delivered on time and within budget. The customer has accepted the final deliverable. Which THREE activities should the project manager complete during project closure?
Medium42Your project is developing a new mobile app using Scrum. The team has consistently delivered 30 story points per sprint for the last three sprints. Suddenly, velocity drops to 20 story points in the current sprint. The team members report that they are spending extra time fixing defects from previous sprints. What should you do FIRST?
Medium43Your agile project has experienced a drop in sprint velocity for three consecutive sprints. The team cites increasing technical debt and unclear requirements. As the project manager, what is the most effective first step?
Medium44You are managing a project to develop a new mobile application. During a risk review meeting, the team identifies that a key third-party API may be deprecated before the project completes, which could cause significant rework. The probability is assessed as medium, and the impact is high. The team has identified alternative APIs. What is the BEST risk response strategy?
Medium45A new regulatory requirement has been announced that will affect your pharmaceutical project's deliverables. The requirement will take effect before your project's planned completion date. What should the project manager do FIRST?
Medium46Your project team is co-located, but you notice that collaboration has decreased recently. Team members are working in silos, and communication is minimal. You suspect the team is not functioning as a high-performing team. What should you do first?
Medium47A project is running over budget due to underestimation of effort. The project manager wants to bring costs under control. Which THREE actions are MOST appropriate?
Hard48You are managing a project using a predictive approach. A key vendor informs you that they will be unable to deliver a critical component on time, which will impact the critical path. What should you do FIRST?
Medium49A project team is in the performing stage of development. The project manager is leaving for a two-week vacation. What is the best way to ensure the team remains productive?
Easy50As a project manager in a hybrid project, you notice that the team's sprint velocity has dropped for three consecutive sprints. The team is demotivated, and stakeholders are becoming concerned about the delivery date. Which TWO actions should you take to address this situation?
Medium51You are managing a large, complex project with multiple vendors. A critical vendor is consistently late on deliveries, impacting the project's critical path. The vendor contract includes penalties for delays. Which TWO actions should the project manager take FIRST?
Hard52A project manager is building a new project team. Several team members have never worked together before. The project manager wants to accelerate team development and improve collaboration. Which approach is most effective?
Medium53Your hybrid project team consists of five local members and three remote members in different time zones. Recently, the remote team members have been missing daily stand-up meetings, and their task completion rate has dropped. When you ask, they say they feel disconnected and their input is often overlooked during the meetings. What should the project manager do FIRST?
Hard54Sequence the steps for managing stakeholder engagement.
Medium55You are managing a software development project using a hybrid approach. During a sprint review, the product owner requests a new feature that was not in the backlog. The team estimates it will take 5 days to implement. What is the BEST action to take?
Medium56Your agile team is consistently completing 30 story points per sprint. In the next sprint planning, the product owner wants to commit to 40 points. The team feels this is too ambitious. Which THREE actions should you take?
Easy57Your project is running 15% over budget at the midpoint. The variance is due to unforeseen technical challenges. You have identified a potential solution that would reduce costs but might affect scope. What should you do FIRST?
Hard58During project execution, a team member reports that a deliverable may not meet the quality standards due to a shortcut taken earlier. What should the project manager do?
Easy59Your project is 50% complete and 15% over budget. Earned value analysis shows CPI = 0.85 and SPI = 0.95. The team is demoralized due to recent layoffs in the company. An executive suggests reducing the project scope to cut costs. What should you do FIRST?
Hard60Your project is using a predictive approach. The schedule baseline shows that the project should be 50% complete by now, but only 40% of the work is done. The critical path has been impacted. Several team members are idle because of a dependency conflict. What is the BEST scheduling technique to address this?
Hard61During a sprint retrospective, the team expresses frustration about unclear requirements from the product owner. The project manager wants to improve the situation. Which action aligns with the Agile principle of self-organizing teams?
Hard62Your project is running 15% over budget at the midpoint. The project sponsor asks you to reduce costs by cutting the quality assurance phase. As a servant leader, what is the BEST response?
Medium63Your project is in execution phase, and a key vendor informs you that they will be unable to deliver a critical component on time due to a supply chain disruption. This risk was identified in the risk register and a contingency plan was developed. The project timeline is tight, and any delay will impact the critical path. What should you do FIRST?
Hard64You are managing a hybrid project that uses both predictive and agile approaches. The team has been delivering consistently, but recently the customer requested a critical feature that was not in the original scope. The feature is high value but will require rework of a completed component. What should the project manager do first?
Medium65You are managing a project to develop a mobile app. During the testing phase, a critical defect is found that could cause data loss. The team estimates it will take one week to fix, but the project is already two weeks behind schedule. What is the BEST course of action?
Medium66A project manager is managing a hybrid project with both fixed-price and agile components. The sponsor asks the project manager to skip the testing phase for the agile portion to save time, assuring that the team is highly skilled and can deliver quality code without testing. What should the project manager do?
Hard67Your project is using a Kanban approach. The team's lead time has increased over the last two weeks, and work items are piling up in the 'In Progress' column. What is the BEST action for the project manager to take?
Easy68Match each tool or technique to its application in project management.
Medium69During a project, a risk event that was identified in the risk register occurs. The risk response plan had a mitigation strategy, but it is not fully effective. What should you do first?
Medium70You are leading a software development project using a hybrid approach. During a sprint review, two senior developers have a heated argument about the technical implementation of a feature. The disagreement is causing tension among the team. What should you do FIRST?
Medium71During a project's execution phase, the sponsor asks you to skip the user acceptance testing (UAT) phase to expedite delivery, stating that the client is eager to use the system. What should you do?
Medium72You are managing a software upgrade project using a hybrid approach. During execution, the team discovers a critical security vulnerability that was not identified during risk planning. The vulnerability requires immediate patching to avoid a potential data breach. Which TWO actions should you take NEXT?
Medium73You are leading a virtual team across three time zones. During a video conference, you notice that one team member from a remote location has not spoken for the entire meeting. In previous meetings, this team member has also been quiet. What should you do to ensure effective collaboration?
Easy74You are managing a project in a highly regulated industry. An audit reveals that your project is not fully compliant with a new data privacy regulation. The regulation requires specific data handling procedures that your team has not implemented. What should you do first?
Medium75You are the project manager for a 9-month product launch. At the midpoint review, the earned value analysis shows: EV = $450,000, PV = $500,000, AC = $550,000. The project is underperforming. The sponsor asks for a recovery plan. Which metric should you use to estimate the new total cost at completion assuming no change in cost performance?
Hard76During a project, a new regulation is introduced that will affect the project's deliverables. The regulation is mandatory and will require changes to the scope. What should the project manager do first?
Medium77Your agile team has been using Scrum for six months, but the product owner is not consistently available for sprint planning and reviews. The team is frustrated and the last two sprints did not meet the definition of done. Which THREE actions should you take to address this?
Hard78Your project team includes members from diverse cultural backgrounds. During a meeting, you notice that some team members are not contributing ideas, while others dominate the discussion. What should you do to foster inclusive participation?
Easy79Your project is running 15% over budget at the midpoint. Earned value analysis shows CPI = 0.87 and SPI = 1.02. The project is ahead of schedule but over budget. Which THREE actions should you take?
Medium80During a daily standup, a developer mentions that a critical integration task will take longer than expected because of a technical dependency on another team. The project is on a tight schedule. Which THREE actions should you take?
Easy81A project manager observes that a team member is consistently missing deadlines and producing low-quality work. The project manager suspects it is due to personal issues but the team member is reluctant to discuss. What is the best course of action?
Hard82You are the project manager for a software development project using Scrum. During the daily standup, two senior developers engage in a heated argument about the technical approach for a user story. The argument is consuming valuable time and escalating. What should you do FIRST?
Medium83A project team member from a different culture consistently remains silent during daily stand-ups and rarely contributes ideas. Other team members are frustrated because they feel the person is not engaged. What should the project manager do FIRST?
Easy84During a project's execution phase, a key stakeholder requests a change that would add a new feature. The project manager estimates the impact: 2 additional weeks to schedule and $15,000 to budget. The project currently has 0 schedule reserve and $5,000 contingency reserve. What should the project manager do first?
Medium85You are managing a large-scale project with multiple vendors. One vendor is consistently late in delivering critical components, jeopardizing the project schedule. The vendor blames the delays on your team's incomplete specifications. What should you do first?
Hard86You are managing a marketing campaign project using an agile approach. During the daily standup, a developer mentions they have started working on a feature that was not agreed upon in sprint planning. The product owner is not aware of this work. What should you do as the Scrum Master?
Medium87During a project status meeting, a sponsor mentions that they have been directly assigning tasks to a team member without going through you. The team member is now confused about priorities. What should you do FIRST?
Medium88You are the project manager for a large infrastructure project. Midway through, a new regulatory requirement is introduced that mandates additional environmental testing, which could delay the project by one month and increase costs by 5%. The change control board (CCB) is scheduled to meet in two weeks. What should you do FIRST?
Hard89You are managing a pharmaceutical research project using a hybrid approach. Midway through, a new regulatory requirement is announced that will affect your project's deliverables. The compliance deadline is before your planned project completion. What should you do first?
Hard90Your project is in the execution phase. A team member reports that a supplier delivered a batch of raw materials that do not meet the quality specifications. The supplier insists the materials are acceptable and offers a discount. The project sponsor wants to accept the discount to save costs. What should the project manager do?
Hard91An executive stakeholder has been directly contacting your team members and assigning them work that is not in the sprint backlog. The team is feeling pressured and confused about priorities. What should the project manager do?
Hard92In a Scrum team, the product owner frequently changes priorities within a sprint, causing the team to abandon work mid-task. The team is becoming demotivated. What should the scrum master do?
Hard93A team member consistently misses deadlines, causing delays in dependent tasks. During a one-on-one meeting, the team member admits to feeling overwhelmed and unsure how to prioritize work. What should the project manager do FIRST?
Easy94During a sprint planning meeting, the product owner proposes a user story that the team believes is too vague and lacks clear acceptance criteria. The product owner insists it must be included in the sprint to meet a stakeholder deadline. What should the scrum master do?
Hard95Your project is running 15% over budget at the midpoint. The earned value (EV) is $500,000, actual cost (AC) is $575,000, and planned value (PV) is $550,000. The project sponsor is concerned and asks for an estimate at completion (EAC). Assuming the cost performance index (CPI) will continue as is, what is the EAC?
Medium96You are managing a large project with multiple vendors. One vendor has delivered a critical component two weeks late, jeopardizing the project schedule. The vendor claims that the delay was caused by unclear specifications from your team. Your team insists the specifications were clear. What should you do FIRST?
Hard97Your project is halfway through its schedule. Earned value analysis shows: EV = $120,000, PV = $150,000, AC = $140,000. What is the best interpretation of the project's performance?
Medium98During a sprint review, the product owner rejects a user story because it does not meet the acceptance criteria. The developer who worked on it becomes defensive and argues that the implementation is technically superior to what was requested. What should the project manager do?
Medium99A project manager is leading a hybrid project. The team is co-located but the project manager observes that some team members are reluctant to share opposing views during discussions, leading to groupthink. Which TWO actions should the project manager take to foster a culture of constructive debate?
Medium100Your project is a traditional waterfall project. You are creating the work breakdown structure (WBS) for a new software development project. The team is having difficulty decomposing a complex deliverable. What is the BEST action to take?
Medium101You are leading a globally distributed agile team. During the daily stand-up, you notice that the team member in India consistently speaks little compared to others, while the US-based members dominate the conversation. What should you do to foster inclusion?
Easy102During a hybrid project, an executive stakeholder bypasses you and directly instructs a team member to add a new feature. The team member is now confused about priorities. What should you do first?
Hard103During a project status meeting, a key stakeholder expresses dissatisfaction with the quality of deliverables. The team believes they have met all acceptance criteria. What should the project manager do?
Easy104A project manager is planning stakeholder engagement for a complex project with many interested parties. Which THREE techniques are MOST effective for analyzing stakeholders?
Medium105Your project is using a predictive approach. A key vendor notifies you that they will be unable to deliver a critical component for another four weeks. This component is on the critical path, and you have no schedule reserve left. You have identified that a different vendor can deliver in two weeks at a 20% higher cost. What should you do FIRST?
Hard106A project manager is reviewing the earned value report. The SPI is 0.85 and the CPI is 0.90. The project is behind schedule and over budget. Several team members are working overtime to catch up. What should the PM do FIRST?
Medium107Match each project document to its description.
Medium108During a project retrospective, the team identifies that low morale is affecting productivity. As a servant leader, which THREE actions should the project manager take to address this?
Medium109Your project is running 15% over budget at the midpoint. The team is motivated, but the sponsor is concerned. What should you do first?
Medium110Your predictive project is halfway through execution. A team member has been consistently missing deadlines, and their work quality is declining. You suspect personal issues but are unsure. The project is at risk of schedule delays. What should you do FIRST?
Hard111Two senior developers on your Scrum team have a disagreement about the technical approach for a user story. The disagreement is causing delays in sprint execution. As the Scrum Master, what should you do FIRST?
Easy112During a project, an executive stakeholder bypasses you and directly assigns work to your team members. This has caused confusion and rework. What is the best action for you to take?
Medium113During a sprint retrospective, the team identifies that unclear requirements from the product owner are causing rework. The team suggests improvements. Which THREE actions should the project manager (Scrum Master) take?
Medium114Your project's Earned Value (EV) is $45,000, Planned Value (PV) is $50,000, and Actual Cost (AC) is $55,000. The project is at the midpoint. What is the most accurate assessment of the project's status?
Medium115A project manager is leading a construction project. The critical path has a total float of zero. A key supplier notifies you that a critical component will be delayed by two weeks, which will push the project beyond its deadline. The risk was identified and a mitigation plan exists. What should the PM do NEXT?
Hard116A project manager is leading a cross-functional team where two key members have conflicting priorities. One member insists on following a strict process, while the other wants to expedite delivery. The project manager needs to resolve the conflict to keep the project on track. Which approach is most effective?
Medium117In a Scrum project, the product owner asks the team to add a new user story during the sprint. The team is currently working on committed stories. What should the Scrum Master do?
Easy118A key stakeholder on your project has been sending emails directly to team members, bypassing you as the project manager. This has caused confusion, as team members are receiving conflicting instructions. What should you do FIRST?
Medium119An executive stakeholder bypasses the project manager and directly assigns work to a team member. The team member is now overloaded and missing sprint commitments. What should the project manager do first?
Hard120You are the PM for a highway construction project. A key vendor informs you that they cannot deliver the steel beams on time due to a factory fire. This risk was identified in the risk register with a mitigation plan to have a backup supplier. However, the backup supplier's price is 20% higher. Which TWO actions should you take?
Medium121A team member consistently misses deadlines, causing delays in the project. The project manager has had informal conversations with the team member, but the issue persists. What is the BEST next step?
Medium122During a construction project, you discover that a subcontractor has delivered materials that do not meet the quality specifications outlined in the contract. The project is already behind schedule, and replacing the materials will cause further delays. You have a good relationship with the subcontractor, who offers a discount on future work if you accept the materials as-is. What should you do FIRST?
Hard123You are the project manager for a marketing campaign launch. The project has a tight deadline. During a status meeting, a team member announces that they have completed a task two days early. However, you notice that the quality of the deliverable is below the acceptance criteria. What should you do?
Medium124A key vendor informs you that they will be unable to deliver a critical component on time due to a production issue. This component is on the critical path. What should the project manager do FIRST?
Medium125Your project's earned value analysis shows CPI = 0.85 and SPI = 0.90. The project is behind schedule and over budget. Several stakeholders are concerned about the viability of the project. What is the BEST course of action?
Medium126Your project is experiencing scope creep due to informal requests from stakeholders. The project manager wants to establish better control. Which TWO actions should the project manager take?
Medium127You are managing a software development project using a hybrid approach. During a sprint review, the customer expresses dissatisfaction with a recently delivered feature and requests a significant redesign. This change will impact the critical path and increase costs. What should you do FIRST?
Medium128A key vendor informs you that they cannot deliver a critical component on time, which will delay the project. You need to decide on next steps. Which THREE actions are most appropriate?
Hard129During a sprint retrospective, a team member complains that the daily standups are too long and unproductive. Several others agree. What is the BEST action for the Scrum Master to take?
Medium130In a Scrum project, the development team is consistently missing sprint commitments. The daily standup reveals that they are blocked by unclear acceptance criteria. What should the scrum master do?
Medium131Order the steps for closing a project or phase.
Medium132In a Scrum project, the product owner wants to add a new high-priority story to the current sprint, but the sprint is already full. The team is concerned about overcommitment. What should the Scrum Master do?
Medium133During a sprint review, the product owner rejects a completed user story because it does not meet their expectations, even though it meets the acceptance criteria defined in the sprint planning. The team is frustrated. What should you do?
Hard134Your project is in the planning phase, and you are developing the team charter. Which THREE elements should be included in the team charter to promote high performance?
Hard135Your agile project has seen sprint velocity drop for the past three sprints. The team attributes it to increasing technical debt. As the project manager, what should you do FIRST?
Hard136Your project is halfway through its planned 18-month schedule. The sponsor has asked you to skip the final testing phase to meet a regulatory deadline, citing that the team is experienced and testing is unnecessary. What should you do FIRST?
Medium137Your project team is distributed across four countries with significant time zone differences. Communication has been challenging, leading to misunderstandings and delays. Which THREE actions would most effectively improve collaboration?
Hard138During a project audit, it is discovered that the quality management plan has not been followed, leading to defects. The project manager needs to address this issue. Which THREE actions should the project manager take?
Hard139In a SAFe environment, a project manager (release train engineer) notices that multiple teams are working on features that do not align with the strategic themes defined by the portfolio. What should the project manager do first?
Medium140A new government regulation has been enacted that affects your project's deliverables. The regulation requires additional compliance checks that were not in the original scope. What should you do first?
Medium141Your agile project is in its third sprint. The product owner has been pressuring the team to deliver more features each sprint to meet stakeholder expectations. Sprint velocity has dropped for two consecutive sprints, and the team seems demotivated. As the project manager, what should you do?
Hard142You are managing a project to implement a new customer relationship management (CRM) system. During a status meeting, the IT director (a key stakeholder) announces that the team must use a different database platform than planned, citing corporate policy. This change will require significant rework. What should you do FIRST?
Medium143Your project team is distributed across three time zones. A team member from the India office has been consistently delivering tasks late, impacting the critical path. When you discuss this, they mention feeling isolated and unmotivated due to lack of interaction with the rest of the team. What is the BEST action to take?
Easy144Your construction project is 60% complete. Due to a material shortage, the critical path extended by 10 days. You have float on some non-critical tasks. The sponsor is concerned about the project finishing on time. What should you do FIRST?
Hard145You are managing a project that is running 15% over budget at the midpoint. The variance is due to higher-than-expected material costs. The sponsor is concerned about cost overruns. What should you do FIRST?
Medium146You are managing a project using a hybrid approach. A team member has been underperforming for several weeks. You have had informal conversations and provided coaching, but there has been no improvement. What should you do next?
Medium147A project team has low trust and poor collaboration. The project manager wants to build a high-performing team. Which of the following is the MOST effective first step?
Medium148A key vendor notifies you that they cannot deliver a critical component on time due to raw material shortages. This component is on the critical path and has no float. The vendor suggests using a substitute material that meets specifications but costs 20% more. What should the project manager do FIRST?
Hard149Your project is using a hybrid approach. An executive stakeholder has been bypassing you and giving direct instructions to the development team. The team is confused about priorities. What should the project manager do first?
Hard150A project manager is leading a globally distributed team. Two team members from different time zones have conflicting work styles, leading to missed deadlines and tension. What is the best first step for the project manager to resolve this?
Medium151You are managing a project using a hybrid approach. The project has a fixed-price contract with a customer. Midway through, the customer requests a significant scope change that would increase the contract value. The change request is approved by the CCB. What must the project manager do NEXT?
Hard152You are managing a project using a predictive approach. A key team member has expressed that they feel micromanaged by you and wants more autonomy. The team member's performance is satisfactory. How should you respond?
Hard153During a project, a new regulation is introduced that affects your project's compliance requirements. The team will need to complete additional documentation and training. What is the FIRST thing you should do?
Medium154Your agile team has been consistently delivering high-quality increments. However, the product owner has been absent from the last two sprint reviews, and stakeholders are losing interest. What should you do as the scrum master?
Medium155A new team member joins a high-performing agile team. The existing team members are concerned that the new member's pace is slower. What should the project manager do to integrate the new member effectively?
Easy156Your agile project has been experiencing declining velocity over the last three sprints. During the retrospective, the team identifies that they are spending too much time on unplanned work and technical debt. The product owner wants to maintain the current scope. Which THREE actions should the project manager take? (Choose three.)
Hard157A project manager is managing a construction project that is currently 15% over budget at the midpoint. The sponsor asks the PM to reduce quality testing to save costs. What should the PM do first?
Hard158During a sprint retrospective, the team expresses frustration that they are frequently interrupted by unplanned support requests from the operations department. The product owner agrees this is impacting velocity. What should the project manager do FIRST?
Medium159During project execution, the project manager notices that two team members are in frequent conflict, which is affecting the team's overall performance. The project manager wants to resolve the conflict effectively. Which THREE actions align with PMI's recommended approach?
Medium160You are managing a global project with team members in three time zones. A key team member from the India office has been consistently missing deadlines, impacting the project's critical path. In a one-on-one meeting, you discover she is struggling with the work-from-home setup and lack of collaboration tools. What should you do FIRST?
Hard161During a project retrospective, the team identifies that a major risk was not properly mitigated because the contingency plan was not executed on time. The risk event caused a two-week delay. What should the project manager do FIRST?
Medium162A team member has been consistently late completing tasks. When you discuss this, they mention personal issues affecting their work. What should you do FIRST?
Easy163An executive stakeholder bypasses you and gives direct instructions to a team member to add a new feature immediately. The team member is confused and asks you what to do. What should you do FIRST?
Hard164You are managing a software upgrade project. The team has identified a critical defect that requires immediate fixing, but the fix will delay the next release by one week. The product owner wants to release on time with the defect. Which THREE factors should you consider when advising the product owner?
Medium165You are managing a project to develop a mobile app. The sponsor asks you to skip user acceptance testing (UAT) to meet an aggressive launch date. The team is concerned about quality risks. What should you do?
Medium166Your agile project team has been consistently delivering high-quality work, but sprint velocity has dropped over the last three sprints. The team reports feeling overworked and demotivated. What should you do FIRST?
Easy167Your project is running 15% over budget at the midpoint. The sponsor asks you to cut costs by reducing the testing phase. What should you do?
Medium168During project execution, the quality assurance team finds that a deliverable does not meet the specified requirements. What should the project manager do FIRST?
Easy169A project team is composed of members from diverse cultural backgrounds. The PM notices that some team members are not voicing their opinions in meetings due to cultural norms. What is the BEST approach to foster inclusion?
Medium170You are managing a project that is 15% over budget at the midpoint. The earned value (EV) is $100,000, actual cost (AC) is $115,000, and planned value (PV) is $110,000. What is the most likely reason for the cost variance?
Medium171You are closing a project that has delivered all scope successfully. Which THREE activities are essential to complete during the project closure phase?
Easy172Your project team is struggling with low morale due to a heavy workload and unclear priorities. As a project manager, which TWO actions would BEST help improve team motivation? (Choose two)
Medium173During a project, two senior developers have a conflict regarding the technical approach. As project manager, which TWO actions should you take?
Easy174Your project has multiple stakeholders with conflicting interests. The project sponsor wants to prioritize speed, while the quality assurance manager insists on thorough testing. The product owner wants to add more features. Which THREE techniques can help manage these conflicting stakeholder expectations?
Hard175Your project team is experiencing a conflict between two members that is affecting the entire team's productivity. As the project manager, which TWO actions should you take to resolve the situation?
Medium176Match each project management artifact to its typical content.
Medium177Your project is in the execution phase and you discover that a key vendor will not deliver a critical component on time due to production issues. This risk was identified and documented in the risk register with a response plan to mitigate by having a backup vendor. However, the backup vendor requires a contract amendment that will take two weeks to approve. What should you do FIRST?
Medium178You are managing a software development project using a hybrid approach. During a sprint review, two senior developers get into a heated argument about the technical design of a feature. The argument is causing tension and delaying the review. What should you do first?
Medium179You are forming a new project team with members from different departments. To ensure a shared understanding of team values and expectations, what should you do FIRST?
Easy180A project manager is leading a team in a country with a high power distance culture. The team members are reluctant to speak up in meetings or challenge the project manager's ideas. How should the project manager foster an inclusive environment?
Medium181During a project, the sponsor asks you to skip the testing phase to save time and meet the deadline. What should you do FIRST?
Easy182During a complex construction project, a key vendor notifies you that they cannot deliver a critical component for another 4 weeks. This component is on the critical path and has no float. You have identified this risk in the risk register with a planned response of 'mitigate' by having a backup vendor. However, the backup vendor also cannot deliver on time. What should you do first?
Hard183During a project, the sponsor asks you to skip the user acceptance testing (UAT) phase to save two weeks and meet an accelerated deadline. What should you do?
Medium184A project manager is planning a hybrid project. The team is new to agile and there is resistance to adopting agile ceremonies. Which TWO actions should the PM take to address this?
Medium185A project manager is leading a Scrum team. The product owner frequently changes priorities mid-sprint, causing the team to lose focus and miss sprint goals. The team is frustrated. What should the project manager do?
Hard186In a project closure phase, you are preparing the lessons learned report. The project performed well, but some stakeholders were dissatisfied with the communication frequency. What should you do?
Medium187Your agile team is distributed across four countries. During the daily stand-up, some team members are not speaking, and others dominate the conversation. The project manager wants to improve collaboration. What is the BEST approach?
Hard188During a project, a key team member resigns unexpectedly. The project manager needs to fill the role quickly. What is the first action the project manager should take?
Medium189You are the project manager for a large infrastructure project. The sponsor has requested that the team skip the quality assurance review for the next deliverable to save two weeks and meet an aggressive deadline. The deliverable is critical to the next phase. What should you do?
Medium190During a daily standup, a team member mentions that a task is taking longer than expected and will likely miss the deadline. The task is on the critical path. What should the project manager do FIRST?
Easy191A project manager is defining the benefits management plan. Which TWO of the following are key components of a benefits management plan?
Medium192Your project is using a critical chain method. You have identified that the project buffer is being consumed faster than planned due to delays in several tasks. What should you do?
Medium193During a sprint review, the product owner is dissatisfied with the increment and wants to revert to a previous version of a feature. The development team believes the current version meets the acceptance criteria. As Scrum Master, what should you do FIRST?
Hard194Your project team is co-located, but you have noticed a lack of collaboration and trust among members. Which TWO actions would BEST help build a high-performing team? (Choose two)
Medium195A new team member joins your project and is struggling to understand the technical domain and the team's culture. Their productivity is low, and they seem hesitant to ask questions. As project manager, what is the BEST way to support this team member?
Easy196During a sprint retrospective, the team identifies that communication breakdowns are causing delays. They propose a new collaboration tool. The project manager supports the idea but it requires additional budget. What should the PM do FIRST?
Medium197In an agile software project, the sprint velocity has dropped from 30 story points to 18 over the last two sprints. The team members report that they are spending too much time on unplanned technical debt. The product owner is pushing for more features. What should the project manager do FIRST?
Hard198You are the project manager for a multinational corporation that is launching a new software product. The organization's strategic goal is to increase market share in emerging markets by 15% within the next two years. The project has completed the planning phase, and you are about to start execution. During a stakeholder meeting, the product owner insists on adding a feature that is popular in developed markets but has not been validated for emerging markets. The product owner argues that this feature will differentiate the product, but the development team estimates it will add three months to the schedule and increase costs by 20%. The sponsor is concerned about the budget and timeline. You have reviewed the business case, which does not mention this feature. What should you do?
Medium199You are managing a construction project that is behind schedule. The project has non-critical activities with significant float. A key supplier has informed you that a critical component will be delayed by two weeks, impacting the critical path. You have already used up all schedule contingency. What should you do NEXT?
Hard200A project manager is closing a phase of a large project. What is the most important activity to perform during phase closure?
Easy201You are the project manager for a hybrid software development project. During a sprint review, a key stakeholder requests a new feature that was not in the original scope. The product owner believes it adds significant value. The team estimates it will take two additional sprints. What should you do first?
Medium202Your construction project is in the execution phase. A key vendor informs you that a critical material will be delayed by 3 weeks due to a strike at their factory. This delay will push the project beyond the required completion date. The risk was identified and documented in the risk register with a planned response. What should you do FIRST?
Medium203Your project team has been working remotely for the past six months. You notice that collaboration has decreased, and team members seem isolated. What is the BEST action to improve team cohesion?
Medium204Which THREE of the following are key inputs to the Develop Schedule process?
Hard205A project manager notices that one team member has been consistently missing deadlines, and their work quality is declining. The team member is otherwise talented and has been with the company for years. What should the project manager do FIRST?
Easy206A team member has been consistently missing deadlines, causing delays in dependent tasks. During a one-on-one meeting, you discover they are struggling with a new technology. What is the best course of action?
Easy207A new regulatory requirement has been discovered that will affect your project's deliverables. The requirement is mandatory and must be implemented before the project can close. Your team has the skills to implement it, but it will add two months to the schedule. The sponsor is pushing for the original deadline. What should you do FIRST?
Hard208During a project, the team identifies a risk that could cause a major delay. The probability is high and the impact is high. The project manager decides to hire an external expert to manage the risk. Which risk response strategy is being used?
Hard209You are managing a project using a hybrid approach. The team has a mix of senior and junior members. A senior developer is consistently dominating pair programming sessions, leaving the junior developer passive. The junior's performance is declining. What is the BEST action?
Hard210You are managing a hybrid project with a critical deliverable due in two weeks. Two senior developers on your team have a strong disagreement over the technical approach. They have stopped speaking to each other, and the team's progress has stalled. What should you do FIRST?
Medium211Your agile team's velocity has dropped over the last three sprints. During the retrospective, the team cites increasing technical debt and lack of automated testing. Which TWO actions should you take to address this?
Medium212During a sprint, you observe that a team member is consistently underperforming, missing tasks, and producing low-quality work. They have been a reliable performer in the past. What should you do FIRST?
Hard213You are managing a portfolio of projects. One project has a high probability of missing its deadline, which will impact the organization's strategic goals. What should you do first?
Easy214You are the project manager for a large infrastructure project. Two key stakeholders have conflicting requirements that cannot both be satisfied within the current budget. Which TWO actions should you take to resolve this conflict?
Medium215You are the project manager for a hybrid project. Midway through, you discover that a key stakeholder has been giving direct instructions to the development team, causing confusion and rework. What should you do first?
Medium216Your project is using Scrum. During the daily standup, a team member mentions that a key vendor will be unable to deliver a critical component on time, which will delay the next sprint. What is the best action to take?
Easy217You are managing a project using a hybrid approach. During the execution phase, one of your key team members, a senior engineer, resigns unexpectedly. This engineer was responsible for critical path tasks. What is the FIRST thing you should do?
Medium218Your project is using a predictive approach, and you have just completed the work breakdown structure (WBS). What is the NEXT step in project planning?
Easy219A project team member has been underperforming for several weeks. You have had informal conversations with them, but performance has not improved. What should you do next?
Easy220Your project is being audited for compliance with a new data protection regulation. The audit reveals several non-compliance issues. Which TWO actions should you take FIRST?
Medium221You are the project manager for a large infrastructure project. During a routine check, you discover that the project's SPI is 0.85 and the CPI is 0.90. The project sponsor is concerned about the schedule delay and asks you to compress the schedule without increasing costs. Which technique is BEST suited for this situation?
Hard222A project manager is developing the project schedule and wants to determine the critical path. The activity network diagram shows multiple paths. Which technique should the project manager use?
Medium223Your project is a software implementation using a hybrid approach. The team has been facing scope creep due to informal change requests from stakeholders. Which TWO actions should you take to address this issue?
Medium224A project manager is managing a hybrid project. The team is two weeks into a four-week iteration when the product owner asks to reprioritize the backlog to include a critical regulatory requirement that was just announced. The change will impact the current iteration goal. What should the PM do FIRST?
Hard225During a risk review meeting, a risk that was identified and registered occurs. The risk response plan is implemented, but it does not fully mitigate the impact, and the project is now behind schedule. What should the project manager do NEXT?
Medium226You are managing a distributed team across three time zones. A team member from the Asia office reports that they feel excluded from decision-making because key meetings are held during their late evening hours. What should you do first?
Easy227You are leading a virtual team across three time zones. A team member from the offshore location has been consistently missing deadlines, causing delays. When you inquire, the member says they are overloaded with work from another project. What is the best course of action?
Easy228A team member reports that a task is 50% complete but has consumed 70% of the budget. Which metric indicates that the project is over budget?
Easy229Your project is 40% complete and the earned value metrics show: PV = $500,000, EV = $450,000, AC = $520,000. What is the most accurate interpretation of the project's performance?
Medium230A project is running 15% over budget at the midpoint. The sponsor is concerned and asks the PM to reduce costs by cutting team training and team-building activities. What should the PM do?
Medium231In a Scrum team, the product owner frequently changes priorities during the sprint, causing the team to lose focus. The team has raised this concern in the retrospective. What should the scrum master do?
Medium232In an agile project, the sprint velocity has been dropping for three consecutive sprints. The team is demotivated and blaming each other during retrospectives. What should you do as the project manager?
Medium233During a project kickoff, the project manager discovers that the project's business case has not been updated to reflect a recent change in organizational strategy. What should the PM do?
Medium234You are the project manager for a large infrastructure project to upgrade a legacy network system across 50 remote sites. The project is in its second month, and the team consists of 12 members: 6 network engineers, 3 site coordinators, 2 QA testers, and 1 procurement specialist. The team is co-located at the headquarters except for the site coordinators who are at various locations. Recently, you have noticed that the weekly status meetings are dominated by the network engineers, and the QA testers rarely speak. The site coordinators have missed the last two meetings due to 'scheduling conflicts.' Deliverables from QA are consistently late, and there have been three incidents where network configurations were deployed without QA approval, causing outages at two sites. When you asked the lead network engineer about it, he said, 'QA is too slow; we had to move fast.' The QA lead is frustrated and feels marginalized. The sponsor has expressed concern about the increasing number of outages. The organizational culture is hierarchical, but the project charter gives you authority to manage the team. What should you do first to address this situation?
Hard235During a sprint retrospective, the team identifies that the daily standups are taking too long and are not productive. Several team members suggest canceling them to save time. As the scrum master, what is the best course of action?
Medium236You are a project manager overseeing a 12-month ERP implementation. During sprint 6 of 20, the product owner informs you that a key stakeholder wants to add a new reporting module that was not in the original scope. The team estimates this would add 3 weeks to the schedule. What should you do FIRST?
Medium237You are managing a marketing campaign project. The sponsor asks you to skip the quality review of the final deliverables to meet the deadline. What should you do?
Easy238A project manager is developing a process improvement plan to reduce waste in a manufacturing project. The team has identified several non-value-added activities. Which technique should the project manager use to systematically analyze and improve the process?
Medium239You manage a global project team with members in three different time zones. Several team members have expressed feeling isolated and disconnected from the project. Communication has become sporadic. What is the BEST way to address this?
Easy240During project closure, the project manager is conducting lessons learned. The team identifies that poor communication with a remote team caused rework. Which THREE actions should the project manager take to ensure continuous improvement?
Hard241A project manager is reviewing the schedule performance index (SPI) and cost performance index (CPI). The current values are SPI = 0.85 and CPI = 1.10. What is the most likely conclusion about the project?
Hard242A project manager is forming a new project team. The team includes members from diverse cultural backgrounds and different functional areas. Which team development model should the project manager use to guide the team through forming, storming, norming, performing, and adjourning?
Medium243Your project team includes members from diverse cultural backgrounds. During a meeting, you notice that some team members are uncomfortable with the direct communication style of others. How should you address this?
Medium244Your project is in the planning phase, and you are developing the risk management plan. Which THREE tools or techniques should you use to identify risks?
Medium245Your project is 60% complete. The CPI is 1.05 and SPI is 0.92. You have received a change request from the customer that would add scope but also increase the budget. The change request is currently under review. What should you do while the change request is being evaluated?
Medium246During a project, a risk you identified in the risk register occurs. Your response plan was to mitigate by purchasing backup equipment. However, you discover the backup equipment is not available due to a supplier issue. What should you do first?
Easy247Your agile team has been experiencing conflicts between two senior developers over technical approaches during sprint planning. The conflicts are causing delays and affecting team morale. As the project manager, what is the BEST course of action?
Medium248During a sprint review, the product owner rejects a completed user story because it does not meet the acceptance criteria. The developer argues that the story is functionally complete and the product owner is being too strict. What should the scrum master do?
Easy249During the execution phase of a construction project, two senior engineers have a heated disagreement over the technical approach for a critical structural component. The conflict is causing delays and affecting team morale. As the project manager, what should you do FIRST?
Medium250A new regulatory requirement has been discovered mid-project. The change will affect the project scope and schedule. Which TWO actions should the project manager take FIRST? (Choose two)
Medium251You are managing a project to upgrade a company's network infrastructure. The project is on schedule, but you discover that the network cables purchased do not meet the required specifications. The procurement team bought a cheaper alternative without your knowledge. What should you do FIRST?
Easy252Your project is using a hybrid approach. A new regulatory requirement has been discovered that will affect the project scope. Which THREE actions should you take?
Hard253Your construction project is 40% complete, and you have just learned that a key supplier will be unable to deliver critical steel beams for another six weeks due to a factory fire. The beams are on the critical path, and the project has zero float. The risk register had identified a potential supplier delay, with a planned response to use an alternative supplier. What should you do NEXT?
Hard254A project team member is consistently late with deliverables, affecting the critical path. The project manager has had informal conversations, but performance hasn't improved. What should the project manager do next?
Medium255You are leading a project to develop a new product. The marketing department requests a last-minute change that would increase the project's scope significantly. The project is on track and within budget. Which TWO actions should the project manager take?
Medium256You are the project manager for a construction project. A key vendor notifies you that they cannot deliver a critical component for another two months, which would delay the critical path. Which TWO actions should you take first?
Hard257A new team member from a different country joins your project. They seem hesitant to speak up during meetings and often defer to others. Which TWO actions would best help them integrate?
Easy258You are the project manager for a large-scale data migration project from on-premises servers to AWS. The project involves migrating 50 terabytes of sensitive customer data. The team has completed the initial assessment and is now in the planning phase. The Chief Information Security Officer (CISO) has mandated that all data must be encrypted in transit and at rest. Additionally, the migration must minimize downtime and ensure data integrity. The project has a tight budget and schedule. During a planning meeting, the lead architect proposes using AWS Snowball Edge devices for the initial bulk transfer, followed by AWS DataSync for ongoing replication. However, the CISO is concerned about encryption key management and audit trails. As the project manager, what should you do first to address the CISO's concerns?
Hard259In your agile project, the team's velocity has been declining over the past three sprints from 30 to 25 to 20 story points. The team members report feeling overworked and demotivated. The daily standup meetings are running long, and the product owner is adding too many stories each sprint. What should the project manager do FIRST?
Medium260A project manager is forming a new team for a complex software development project. The sponsor insists on using a co-located team for better communication. However, the best available resources are located in different countries. What should the project manager do?
Hard261During a sprint review, a stakeholder expresses dissatisfaction with a deliverable's feature, claiming it does not meet their needs. The product owner disagrees, stating the feature was built exactly as specified. What is the BEST next step?
Easy262You are managing a project where a team member consistently misses deadlines, affecting the team's velocity. You have had informal conversations with the team member, but the behavior continues. What is the BEST next step?
Easy263A project manager is closing a project. Several lessons learned were documented throughout the project. What should the PM do with the lessons learned?
Medium264During a sprint retrospective, the team identifies that they are consistently overcommitting during sprint planning, leading to incomplete work. Which action should the project manager take to address this issue?
Easy265At the midpoint of your 18-month project, the earned value analysis shows: EV = $450,000, PV = $500,000, AC = $550,000. What should you be most concerned about?
Medium266You are the project manager for a complex IT infrastructure project. Two senior developers have a conflict regarding the technical approach to a critical component. The conflict is causing delays and affecting team morale. Both approaches are valid but have different resource and schedule implications. What should you do first?
Hard267During a sprint retrospective, several team members express frustration that the daily stand-ups are too long and not focused. As the Scrum Master, what is the BEST action to take?
Easy268During project closure, which THREE documents should be updated or finalized as part of the lessons learned process?
Medium269An executive stakeholder bypasses the project manager and directly instructs a team member to work on a new feature not in the project scope. The team member is confused. What should the project manager do FIRST?
Hard270A key vendor notifies you that they cannot deliver a critical component on time due to a supplier issue. The component is on the critical path. What should the project manager do first?
Hard271You are managing a marketing campaign project. Midway, you discover that the team has been working on additional features requested by the sales director without formal approval. The project is now 10% over budget. Which TWO actions should you take FIRST?
Medium272Your agile team has a high turnover rate. New members are joining frequently, and the team's performance is declining. What should you do as a servant leader?
Medium273A project is halfway through its schedule. The earned value (EV) is $50,000, planned value (PV) is $60,000, and actual cost (AC) is $70,000. The project manager calculates the cost performance index (CPI) and schedule performance index (SPI). Based on these metrics, what is the most likely situation?
Medium274During project execution, a key stakeholder requests a new feature that is not in the scope. The project manager determines that the change will impact the schedule by 3 weeks and increase costs by $50,000. What should the project manager do first?
Hard275Your construction project is in the execution phase. You discover that a critical supplier will be unable to deliver steel beams for another three weeks due to a strike at their factory. This risk was identified and recorded in the risk register with a mitigation plan. What should you do next?
Medium276Your agile team has recently formed and is struggling to agree on work methods and communication norms. Several team members are frustrated with the lack of consistency. What should you do as the project manager?
Easy277Your project is running 15% over budget at the midpoint. The variance is due to higher-than-expected costs for raw materials. The sponsor is concerned and wants to know how you will bring the project back on budget. What is the BEST response?
Hard278Your project is running 15% over budget at the midpoint. Upon review, you find that the cost overrun is due to an underestimation of hardware costs. The sponsor is concerned and asks for a plan to get back on track. What should you do first?
Medium279A team member consistently misses deadlines, causing delays for the rest of the team. When you discuss this with them, they cite personal issues but assure you they will improve. However, the pattern continues. What is the BEST next step?
Easy280During a construction project, a key vendor informs you that a critical component will be delayed by three weeks due to a raw material shortage. The component is on the project's critical path. What should you do FIRST?
Medium281In a Scrum project, the development team consistently fails to complete all committed stories in each sprint. The daily stand-up meetings are running long and often devolve into problem-solving sessions. As the Scrum Master, what should you do?
Easy282A project manager is informed that a new government regulation will affect the project deliverables. The regulation is mandatory and must be implemented before the project can close. What should the project manager do FIRST?
Medium283A project manager is managing a large infrastructure project. The lead engineer has a strong personality and often dismisses ideas from other team members during meetings, causing some to withdraw from participation. What should the project manager do?
Medium284During a project's execution phase, a new regulatory requirement is discovered that will impact the project scope. The requirement is mandatory and must be implemented. What is the first action the project manager should take?
Medium285During project execution, a key stakeholder requests a feature that is not in the scope. The project manager analyzes the request and determines it would add significant business value but also increase risk. What should the project manager do?
Hard286Your team is about to start a new project. To ensure a common understanding of rules and expectations, you want to create a team charter. When should this be developed?
Easy287You are managing a software development project that uses an agile methodology. The team has been working on a critical feature for the past two weeks. During the daily standup, a developer mentions that they discovered a significant technical debt in the codebase that will require refactoring before the feature can be completed. The product owner is not present at the standup. The developer estimates that the refactoring will take an additional three days, which will delay the current sprint's delivery. The sprint ends in five days. The team is already at full capacity. As the project manager, what should you do first?
Medium288You are managing a software development project using a hybrid approach. During sprint planning, the product owner requests adding a new feature that was not in the project scope. The team estimates it will take two additional sprints. What should you do FIRST?
Medium289You are managing a project to develop a new mobile application using an agile approach. During the third sprint, two senior developers have a disagreement about the technical architecture to use for a feature. The disagreement is slowing down progress. Which TWO actions should you take?
Medium290Your agile team has been experiencing declining velocity over the last three sprints. Retrospectives have not identified a clear cause. Several team members mention feeling fatigued and demotivated. As the project manager, what should you do first?
Easy291In a hybrid project, the team is struggling with unclear requirements. The project manager wants to improve the situation. Which THREE actions should the project manager take?
Hard292A project manager is closing a project. Which THREE activities are essential to perform during project closure?
Medium293During a sprint review, stakeholders express dissatisfaction with the functionality delivered. The product owner insists the team met the acceptance criteria defined in the sprint. The team feels demotivated. As the project manager, what should you do first?
Medium294In a Kanban project, the team notices that the work-in-progress (WIP) limit is frequently exceeded, causing bottlenecks. What is the BEST action for the project manager to take?
Easy295You are managing a project where a risk identified in the risk register has occurred. The risk response plan calls for mitigation, but the mitigation action will delay the critical path by 2 weeks. The project has no schedule reserve. What should the project manager do FIRST?
Hard296During a quality audit, it is discovered that a deliverable does not meet the specified quality standards. What should the project manager do first?
Easy297As a project manager in an agile environment, you need to empower the development team to self-organize. Which THREE practices support this goal? (Choose three)
Hard298A project manager is forming a new project team. To build a high-performing team, the project manager wants to establish clear expectations for behavior and communication. What should the project manager do?
Easy299Your project team is experiencing conflict between two senior members who have different opinions on the technical approach. The conflict is starting to affect the entire team's morale. Which THREE actions should you take to resolve the conflict effectively?
Hard300Your agile team's velocity has dropped for three consecutive sprints. The team says they are overwhelmed by the number of user stories and that the definition of 'done' keeps changing. As the Scrum Master (project manager), what should you do FIRST?
Medium301You are the project manager for a large infrastructure project. The sponsor frequently bypasses you and gives direct instructions to the team leads. This has caused confusion and conflicting priorities. What is the BEST action to take?
Hard302Your project uses a hybrid methodology. An executive stakeholder emails the development team directly requesting a new feature without going through the product owner. The team starts working on it. What should you do FIRST?
Hard303Your project is running behind schedule. You need to compress the schedule without significantly increasing cost. Which TWO techniques should you consider?
Medium304A critical vendor informs you that they cannot deliver a key component on time due to a raw material shortage. The component is on the critical path. You have identified this risk in the risk register with a medium probability and high impact. The planned response was to accept the risk. What should you do first?
Hard305You are the project manager for a portfolio of projects. One project is consistently underperforming and missing milestones. The steering committee asks you to recommend whether to continue or cancel the project. What should you do first?
Medium306A project manager discovers that a key vendor will be unable to deliver a critical component on time, which will delay the project. The contract includes penalties for late delivery. What should the project manager do first?
Easy307Your team has been working together for three months and has started to gel. However, you notice that the team is not openly sharing differing opinions during meetings, and decisions are being made too quickly without considering alternatives. What stage of team development is the team likely in, and what should you do?
Easy308A project manager is leading a software development project using Scrum. The product owner frequently changes priorities mid-sprint, causing the team to lose focus. What should the project manager do to address this?
Easy309During a project audit, you discover that the quality assurance (QA) team has not been conducting planned inspections, but the quality control (QC) logs show no major defects. What should you do FIRST?
Medium310Match each knowledge area to its primary focus.
Medium311During a sprint retrospective, several team members express frustration that the project manager often overrides their decisions, contradicting the agile principle of self-organization. The project manager believes the team lacks experience and needs guidance. What should the project manager do?
Hard312Your project is in the execution phase, and a new regulatory requirement has been discovered that will affect the project scope. The change is mandatory and must be implemented within two weeks. What should you do FIRST?
Medium313Your project is running 15% over budget at the midpoint. The team is working hard, but you suspect the original estimates were too optimistic. What is the BEST action to take?
Medium314Arrange the steps for developing a project charter in the correct order.
Medium315A new project manager is assigned to an ongoing project. The team seems demotivated because the previous PM did not recognize their contributions. What can the new PM do to motivate the team?
Easy316In a large-scale project, the project manager notices that sprint velocity has been declining over the last three sprints. The team is demotivated and blaming each other for missed commitments. What should the project manager do first?
Medium317A project manager is leading a virtual team across four time zones. The project has entered the execution phase, and the project manager notices that team members are not collaborating effectively, and communication is becoming fragmented. What should the project manager do first?
Medium318During project execution, a key stakeholder requests that the project manager bypass the formal change control process to expedite a change. The stakeholder argues that the change is minor and will not affect the budget or schedule. What should the project manager do?
Medium319During a project to develop a mobile app, the product owner wants to add a feature that the team believes will increase user engagement but was not in the approved scope. The sprint is already in progress. What should the project manager do?
Easy320Your project is using a hybrid approach. During a sprint review, the customer is unhappy with the progress and requests a major change in direction. This change will require significant rework and affect the project's critical path. Which THREE actions should you take?
Hard321A project manager is leading a global team with diverse cultural backgrounds. Two team members from different cultures have a misunderstanding that is causing tension. The project manager wants to promote inclusivity and resolve the issue. What should the project manager do?
Hard322During project execution, a risk event that was identified and listed in the risk register occurs. The risk response plan includes a mitigation strategy. What should the project manager do FIRST?
Medium323A project manager is developing the business case for a new product. Which of the following is the primary purpose of the business case?
Easy324During a sprint retrospective, the team identifies that the daily standups are taking too long and are not focused. Several team members suggest canceling them to save time. What should the scrum master do?
Medium325You are the project manager for a software development project using a hybrid approach. Two senior developers, Maria and John, have a disagreement about the technical approach for implementing a critical feature. Their conflict is causing delays and affecting team morale. What should you do first?
Medium326You are managing a project that involves a high-risk activity that was identified in the risk register. A risk response plan was created to mitigate the risk. During execution, a risk event occurs that was not fully mitigated. The risk impact is now threatening the project schedule. What should you do FIRST?
Hard327Your agile team has experienced a drop in velocity for the past three sprints. During the retrospective, team members mention that they are spending too much time on unplanned work and context switching. As the project manager, what should you do FIRST?
Medium328Your agile team has been experiencing a decrease in velocity over the last three sprints. During the daily standup, team members seem disengaged and mention they are unsure of the sprint goals. As the scrum master, what should you do FIRST?
Easy329You are managing a software development project using a hybrid approach. During sprint planning, the product owner insists on adding a feature that was not in the approved product backlog. The team estimates it will take 3 additional days. What should you do FIRST?
Medium330Your project is using a hybrid approach with both predictive and agile elements. The team is working on a critical feature that has a high degree of uncertainty. The product owner wants to use a time-boxed sprint to explore the feature. However, the sponsor insists on a detailed upfront plan. What should the project manager do?
Medium331A project manager is leading a global virtual team. A conflict arises between two senior developers from different cultures. One feels the other is not respecting their time zone, while the other accuses the first of micromanaging. What is the best approach to resolve this conflict?
Hard332A project manager notices that two senior developers have conflicting work styles, causing delays. What is the best approach to resolve this?
Easy333Refer to the exhibit. The project team uses Git for version control. The lead developer accidentally committed a bug fix directly to the main branch instead of the feature branch. What is the best course of action to maintain a clean history?
Medium334You are leading a virtual team across multiple time zones. During daily stand-ups, you notice that team members from one region are consistently quiet and not contributing. What should you do FIRST?
Easy335A project manager is leading a distributed team where members are in different time zones and have varying levels of experience. The team is struggling with knowledge sharing and collaboration. Which TWO tools or techniques should the project manager consider to improve the situation? (Choose two.)
Medium336Your IT infrastructure project is being audited for compliance. The auditor finds that several change requests were approved verbally but not documented. The project is in the execution phase. Which TWO actions should you take?
Medium337A project manager notices that during virtual team meetings, only a few members participate actively while others remain silent. The team is diverse and geographically distributed. What technique should the PM use to encourage participation?
Easy338During a sprint retrospective, the team identifies that the daily standup meetings are not effective because they are too long and lack focus. Which THREE actions should the Scrum Master take to improve the standup?
Medium339As an agile project manager, you want to empower the development team to self-organize. Which TWO practices would BEST support self-organization?
Easy340You are leading a distributed agile team. Team members have expressed that they feel disconnected and unclear about project goals. Which THREE actions should you take to improve team cohesion and alignment?
Hard341During project execution, a key vendor notifies you that they cannot deliver a critical component on time due to a raw material shortage. This component is on the critical path. The vendor suggests using a substitute material that is not yet approved by your quality team. What should the project manager do FIRST?
Hard342You are managing a software development project using a hybrid approach. During a sprint review, the customer requests a major feature addition that would extend the timeline by two weeks. The team is already working at capacity. What should you do FIRST?
Medium343You are the project manager for a marketing campaign project using a hybrid approach. Mid-sprint, the product owner asks the team to add a new feature that increases customer engagement. The team has capacity, but the new feature was not in the approved business case. What should you do first?
Medium344On a large-scale project, you have a team member who is technically skilled but consistently fails to complete tasks on time, affecting the team's morale. You have had informal conversations about this, but there has been no improvement. What should you do next?
Hard345A project manager is using a servant leadership approach. During a sprint, the team is struggling to complete their tasks due to unclear requirements. What should the project manager do?
Easy346Your project is using a hybrid approach with both predictive and agile elements. The team is struggling with the daily standup because some members treat it as a status report for management. Which THREE actions should you take to improve the standup?
Medium347You are managing a large, distributed project using a hybrid methodology. The team is experiencing communication breakdowns and conflict between onshore and offshore members. Which THREE actions should you take to improve team collaboration and performance? (Choose three)
Hard348You are the project manager for a software development project using Scrum. During the daily standup, a developer mentions that they are blocked by a dependency on another team's API that is delayed. The developer has already tried contacting the other team but received no response. What should the scrum master do?
Easy349Your project is behind schedule due to underestimated task durations. The critical path has been identified. Which TWO schedule compression techniques are MOST appropriate to get the project back on track?
Medium350Your agile project has been experiencing decreasing velocity over the last three sprints. The team is frustrated and morale is low. The product owner is pressuring for more features. What is the BEST action for the project manager to take?
Medium351You are managing a project using a hybrid approach. Midway through, a new regulatory requirement is introduced that will affect the project scope. The change is mandatory and must be implemented. What is the FIRST step?
Hard352During a sprint review, the customer expresses dissatisfaction with the user interface, stating it does not meet their expectations. The team followed the specifications agreed upon during sprint planning. What should the project manager do NEXT?
Medium353A project team is distributed across three time zones. The project manager wants to improve team collaboration and ensure effective communication. Which tool or technique would best help achieve this?
Easy354Your project is 40% complete, and the earned value analysis shows CPI = 0.85 and SPI = 0.90. The project sponsor is concerned about the cost overrun. The original budget at completion (BAC) is $1,000,000. What is the Estimate at Completion (EAC) using the typical cost performance index (CPI) assumption?
Medium355A team member consistently misses deadlines, causing delays for the rest of the team. You have already spoken to the team member informally, but the behavior continues. What is the BEST next step?
Easy356During the execution phase of a construction project, you notice that a junior team member is consistently missing deadlines and producing work of lower quality. Other team members have expressed frustration. What is the best approach to address this?
Easy357In a large-scale digital transformation project, the executive sponsor has been bypassing you and giving direct instructions to the development team. The team is confused about priorities and feels caught between the sponsor's requests and the project plan. What should the project manager do FIRST?
Hard358You are leading a project with a diverse team including members from different cultures and backgrounds. Which THREE actions should you take to promote an inclusive team environment?
Medium359Your agile team has been self-organizing and performing well, but during the last two retrospectives, the team has raised concerns about the product owner not providing clear acceptance criteria for user stories. As the project manager, what is the most effective way to address this?
Hard360A risk event that was identified and included in the risk register has occurred. The impact on the project schedule is moderate. What should the project manager do first?
Medium361Your project is using a hybrid approach. The business case is no longer valid due to a change in market conditions, but the sponsor insists on continuing because significant resources have already been spent. What is the best action?
Hard362During a sprint retrospective, the team identifies that the daily standup meetings are taking too long and not focusing on impediments. Which TWO actions would help improve the effectiveness of the daily standup?
Easy363A project team member from a different cultural background tends to avoid direct confrontation during disagreements, which frustrates other team members who prefer direct communication. As the project manager, which TWO actions should you take to improve team dynamics?
Medium364A new regulation impacting your construction project was announced. The compliance team says the project must incorporate additional safety inspections, which will require extra resources and extend the schedule. What should you do FIRST?
Easy365A new regulatory requirement has been discovered that affects your project's deliverables. The project is halfway through its schedule. What should the project manager do FIRST?
Easy366Arrange the steps for developing a project team.
Medium367During a hybrid project, the project sponsor asks you to skip the testing phase in the next release to save time and meet an aggressive market deadline. The team is concerned about quality risks. What should you do FIRST?
Hard368A company is implementing a new customer relationship management (CRM) system. The project manager wants to ensure that the project delivers value aligned with the organization's strategic goals. Which document should the project manager reference to confirm the alignment?
Medium369You are managing a pharmaceutical research project using a predictive approach. A new regulation requires additional clinical trials that will extend the project by 6 months. The sponsor wants to know how this affects the business case. Which THREE documents should you review to provide an informed response?
Hard370Your project has a diverse team with members from different cultural backgrounds. A conflict arises because some team members feel their ideas are not being heard during meetings. Which THREE actions should you take to foster inclusion and collaboration?
Medium371An executive stakeholder has been bypassing you and directly assigning tasks to team members. The team is confused about priorities and some tasks conflict with the project plan. Which THREE actions should you take?
Medium372Your project is running 15% over budget at the midpoint. The cost variance is due to higher-than-expected material costs. What should you do?
Easy373During a project's execution phase, the project manager notices that two senior team members are in frequent conflict over technical approaches, causing delays. What is the BEST course of action for the project manager?
Easy374A project manager notices that a team member consistently submits deliverables late. The project manager suspects the team member is overburdened. What should the project manager do first?
Easy375During a sprint retrospective, the team identifies that the daily standups are too long and not adding value. They suggest implementing a timebox of 15 minutes and a strict 'three questions' format. What should the scrum master do?
Easy376You are managing a construction project using a traditional approach. The sponsor asks you to skip the quality inspection phase to save two weeks and meet an aggressive deadline. What should you do FIRST?
Medium377You are managing a project to build a new mobile application. An executive stakeholder has been bypassing you and giving direct instructions to team members, causing rework and confusion. What should you do first?
Medium378Your construction project is experiencing resource levelling issues because a key piece of equipment is shared between two critical path activities. What is the best approach to resolve this?
Medium379Your project is 50% complete, and you realize it is 15% over budget due to unforeseen material cost increases. The sponsor is concerned about the budget variance. Which TWO actions should you take?
Hard380A project manager is working on a predictive project. A team member identifies a risk that was not previously identified. The risk has a low probability but high impact. What should the PM do FIRST?
Easy381In an agile project, the product owner frequently changes priorities within a sprint, causing the team to lose focus and velocity to drop. What should the project manager do first?
Hard382You are managing a virtual team where members are in different time zones. Some team members feel left out of decision-making because meetings are scheduled at times convenient for the majority. What should you do?
Medium383You are managing a virtual team where several members have expressed feeling isolated and disconnected from the project goals. Which TWO actions would BEST improve team cohesion and alignment?
Medium384You are managing a project that is currently in the execution phase. A risk event that was identified and included in the risk register has occurred. The planned response is to mitigate the risk. Which TWO documents should you update to reflect the occurrence and response? (Choose two.)
Easy385You are managing a project that is currently in the execution phase. The project has a cost baseline of $500,000. At the end of month 3, the planned value (PV) is $150,000, the actual cost is $150,000 and the earned value is $120,000. The project manager calculates the cost variance (CV) and schedule variance (SV). What do the results indicate?
Medium386Your project is in the middle of execution when a key vendor informs you that they will be unable to deliver a critical component on time due to a raw material shortage. The component is on the critical path. The risk was identified and logged in the risk register with a mitigation plan. What should you do FIRST?
Hard387A new regulatory requirement has been introduced that affects your project's deliverables. The requirement must be implemented within the current timeline. What should the project manager do first?
Easy388The project manager reviews the benefits realization report for a cloud migration project. The project sponsor asks why the benefits are not being realized as planned. What is the MOST likely cause?
Hard389Two senior developers on your project have a heated disagreement about the technical approach for implementing a key feature. They both have strong arguments, and the conflict is delaying the sprint. As the project manager, what is the BEST first step to resolve this conflict?
Easy390Your project team includes members from diverse cultural backgrounds. A team member from a high-context culture is perceived by others as not being direct enough, causing misunderstandings. What should you do to improve team cohesion?
Easy391During a project audit, you discover that a team member has been gold-plating the deliverables by adding extra features not requested. What is the BEST action to take?
Medium392Your project team consists of members from different cultural backgrounds, and you notice that some team members are not voicing their opinions during meetings, while others dominate discussions. What is the BEST way to foster an inclusive environment?
Easy393The sponsor asks you to skip the final round of user acceptance testing (UAT) to meet the deadline, stating that earlier tests were sufficient. What should the project manager do first?
Medium394You are leading a global software development project with team members in three different time zones. Recently, two senior developers from different locations have been in conflict over the design approach for a critical component. The conflict has started to affect team morale and productivity. What should you do FIRST?
Medium395Which THREE of the following are key considerations when evaluating the strategic value of a proposed project during portfolio selection? (Choose three.)
Hard396In a large-scale project using a predictive approach, you discover that a key team member, who is critical for the next deliverable, has been consistently missing deadlines and producing low-quality work. The project is already behind schedule. What should you do FIRST?
Medium397You are managing a project to develop a new mobile app. During a sprint, the team encounters a technical challenge that will delay the delivery of a key feature. The product owner is concerned about the impact on the release date. Which THREE actions should you take?
Medium398You are managing a hybrid project where the team uses Scrum for development but follows a traditional approach for reporting. The project is behind schedule because the development team is spending too much time on documentation for status reports. The product owner is concerned about the lack of progress. What should you do?
Hard399During project closure, what is the most important activity the project manager should perform?
Easy400Your project is in the planning phase, and you are building a virtual team across five countries. Which THREE factors are most important to address to ensure high team performance? (Choose THREE)
Hard401During a sprint planning meeting, the product owner proposes a user story that the team feels is too large to complete in one sprint. What is the best approach?
Medium402Your project is halfway through its schedule, and you are performing a variance analysis. You find that the cost performance index (CPI) is 0.85 and the schedule performance index (SPI) is 1.1. What is the MOST likely cause of this situation?
Medium403Your project team includes members from diverse cultural backgrounds. During a team meeting, you notice that some members are not speaking up, while others dominate the conversation. The meeting is not productive. What should the project manager do to promote inclusion and improve meeting effectiveness?
Medium404During project execution, a key stakeholder repeatedly bypasses the formal communication channels and directly contacts team members for status updates. This is causing confusion and rework. Which TWO actions should you take?
Medium405You are managing a project where a key executive stakeholder bypasses you and gives direct orders to the development team. The team is confused about priorities. What should you do first?
Easy406Your construction project is halfway through the schedule. Earned value analysis shows EV = $500,000, PV = $600,000, AC = $550,000. The original budget (BAC) is $1,200,000. What is the most appropriate action considering the project's performance?
Hard407An executive stakeholder bypasses the project manager and directly assigns tasks to a team member, causing confusion about priorities. The team member is unsure which tasks to work on. What should the project manager do FIRST?
Hard408A project manager is leading a project that is aligned with the organization's strategic goal to increase market share. However, during execution, a competitor releases a similar product, reducing the expected benefits. What should the project manager do?
Hard409Order the steps for creating a Work Breakdown Structure (WBS).
Medium410Your project is running 15% over budget at the midpoint. The sponsor asks you to skip the testing phase in the next sprint to save costs. The project follows a hybrid approach with both predictive and agile elements. What should you do?
Hard411You are the project manager for a software development project using Scrum. During the sprint, the product owner requests a change that would significantly increase the value of the product but also expands scope. Which TWO actions should you take?
Medium412Your construction project is halfway through the schedule. The earned value analysis shows: EV = $500,000, PV = $600,000, AC = $550,000. The sponsor is concerned about the schedule delay. You need to present recovery options. Which THREE actions should you recommend?
Hard413Your project is using a hybrid approach with a fixed-price contract for the predictive portion and a time-and-materials contract for the agile portion. A change request from a stakeholder would affect both portions. The change control board (CCB) has approved the change for the predictive portion but deferred the agile portion to the product owner. How should you proceed?
Hard414During an agile project, the product owner frequently changes priorities during the sprint, causing the team to lose focus and miss sprint goals. The team expresses frustration in the retrospective. As the project manager, what should you do?
Medium415You are the project manager for a software development project using a hybrid approach. Two senior developers have a disagreement about the technical approach for a critical feature. The conflict is causing delays and affecting team morale. What should you do first?
Medium416You are managing a portfolio of three projects. Project A is on track and aligned with strategic goals. Project B is behind schedule but has high strategic value. Project C is on time but its strategic value has diminished due to market changes. The steering committee asks you to recommend which project to prioritize. What should you do?
Hard417You are the project manager for a large construction project. Midway through, a key supplier informs you that a critical component will be delayed by 6 weeks due to raw material shortages. The component is on the critical path and has zero float. What should you do FIRST?
Hard418A project manager is leading a large, distributed team. Several team members have expressed feeling isolated and disconnected from the project's goals. The project manager wants to improve team cohesion and motivation. What should the project manager do first?
Medium419During a project's execution phase, the sponsor asks the project manager to skip the user acceptance testing (UAT) phase to save time and meet a tight deadline. What should the project manager do?
Easy420During a project, you notice that a team member with specialized skills is becoming demotivated because their work is not being recognized. What is the BEST way to address this?
Easy421During project execution, a team member reports that a critical path activity is delayed by two days because a required component failed quality inspection. The project has no schedule contingency. What is the BEST course of action for the project manager?
Easy422In the middle of a project, new government regulations are introduced that affect your deliverables. Compliance is mandatory. The project is currently on schedule and on budget. What should the project manager do FIRST?
Easy423You are the project manager for a government IT project. Midway through, a new regulation is enacted that requires additional data privacy controls. The team estimates this will add 4 weeks to the schedule and increase costs by 10%. What should you do FIRST?
Hard424You are managing a software development project using a hybrid approach. During a sprint review, the product owner requests a new feature that was not in the backlog. The team estimates it will require 5 additional days. The project is currently on schedule and within budget. Which TWO actions should you take NEXT?
Medium425Your project team is struggling with collaboration due to cultural and language differences. As project manager, you want to foster a more inclusive and effective team environment. Which TWO actions should you take?
Medium426You are the project manager for a hybrid software development project. During a sprint review, two senior developers get into a heated argument about the technical approach for a critical feature. The argument is delaying the review and making other team members uncomfortable. What should you do FIRST?
Medium427During a sprint review, stakeholders express disappointment with the product increment, stating it does not meet their expectations. The team believed they were on track based on the user stories. What should the project manager do to prevent this in the future?
Easy428Midway through a construction project, a key vendor notifies you that they cannot deliver critical steel beams on time due to a factory fire. This risk was identified and included in the risk register. What should the PM do FIRST?
Hard429In a project using a hybrid approach, the team is developing a new product. During sprint planning, the product owner wants to add several new user stories that were not in the release plan. The team is concerned that adding these stories will overload the sprint. What should the scrum master do?
Medium430You are the project manager for a large pharmaceutical company that is developing a new drug. The company's strategic goal is to become a leader in oncology treatments. The project is in the execution phase, and the project sponsor asks you to ensure that the project's outcomes align with the company's strategy. The project team has been working on multiple initiatives, but there is concern that some deliverables may not support the strategic goal. As the project manager, what is the BEST course of action to ensure alignment?
Easy431You are a project manager overseeing a 12-month ERP implementation. During sprint 6 of 20, the product owner informs you that a key stakeholder wants to add a new reporting module that was not in the original scope. The team estimates this would add 3 weeks to the schedule. What should you do FIRST?
Medium432Your project is a construction project with a fixed price contract. At the 40% progress point, earned value (EV) is $400,000, actual cost (AC) is $480,000, and planned value (PV) is $500,000. What does this indicate?
Medium433You are a project manager on a software development project using a hybrid approach. Two senior developers have a strong disagreement on the technical implementation of a critical feature. They have been arguing for three days, causing the team to fall behind schedule. What should you do first?
Medium434You are managing a project where the team is experiencing conflict between two senior developers over technical approach. The conflict is affecting team morale and productivity. Which TWO actions should you take? (Select exactly two.)
Medium435Your project is using a predictive lifecycle. The team has identified a potential risk that could cause a two-week delay. The risk has a probability of 30% and an impact of $50,000. The project has a contingency reserve of $100,000. What is the most appropriate risk response?
Medium436A project is behind schedule due to a key vendor delivering late. The contract includes penalties for late delivery. The project manager is considering options. Which THREE actions are most appropriate per PMI?
Hard437Your agile team has a low-performing member who is struggling with the technology stack. The rest of the team is becoming frustrated because they have to cover for them. What is the BEST approach to handle this situation?
Medium438Your agile team's velocity has dropped for three consecutive sprints. Upon investigation, you discover that the product owner has been adding unplanned work directly to the sprint backlog without consulting you or the team. What is the most appropriate action?
Medium439During a sprint retrospective, the team identifies that their velocity has been declining over the last three sprints. They attribute it to increasing technical debt and lack of automated testing. As the Scrum Master, what is the BEST action to take?
Easy440Which THREE of the following are effective techniques for motivating a project team according to PMI?
Medium441A project manager is conducting a lessons learned workshop at project closure. The team identifies that the project's success was hindered by unclear requirements and lack of stakeholder engagement. Which THREE actions should the PM recommend to improve future projects?
Medium442In a Scrum project, the development team consistently misses deadlines. The project manager (who also serves as the Scrum Master) discovers that the team is overcommitting during sprint planning due to pressure from the product owner. What should the project manager do first?
Medium443Your project is using a hybrid approach. During a sprint, the team realizes that a critical dependency from another project will not be ready on time, impacting the critical path. The dependency was not identified in the risk register. What is the BEST action?
Hard444A project manager is leading a global team with members in different time zones. The team is experiencing delays because some members are not responding to emails promptly. What is the best course of action to improve communication?
Hard445You are the project manager for a software development project using Scrum. For the past three sprints, the team's velocity has dropped from 30 story points to 20. The team cites increasing technical debt and unclear requirements. What should you do FIRST?
Medium446You are the project manager for a construction project. A key vendor notifies you that they cannot deliver a critical component on time, which will delay the project by at least two weeks. The vendor was already on the risk register with a contingency plan. What should you do first?
Medium447You are managing a software development project using a hybrid approach. Two senior developers have a technical disagreement that has escalated into a personal conflict, causing delays. What should you do FIRST?
Medium448During the execution phase of a construction project, you discover that a key vendor will not deliver steel beams on time, threatening the critical path. The risk was identified and the response plan was to use an approved backup supplier. What should you do NEXT?
Easy449Sequence the steps for performing a qualitative risk analysis.
Medium450A project is in the execution phase and the project manager notices that the project's cost performance index (CPI) is 0.85 and the schedule performance index (SPI) is 0.90. The project sponsor is concerned and wants to get back on track. Which THREE actions should the project manager consider to improve performance?
Hard451During project execution, a project manager discovers that a key stakeholder is dissatisfied with the team's communication. The stakeholder feels left out of decisions and receives information too late. Which THREE actions should the project manager take to address this?
Hard452Your project sponsor asks you to skip the testing phase of a software release to meet a tight deadline. What is the best response?
Easy453You are managing a large infrastructure project. At the midpoint, earned value analysis shows CPI = 0.85 and SPI = 0.90. The project budget is $10 million, and the schedule is tight. Several stakeholders are concerned about cost overruns. What should you do FIRST?
Hard454During a project retrospective, the team identifies that many tasks were delayed because team members were unsure of their responsibilities. What is the most effective way for the project manager to prevent this in future projects?
Medium455A new regulatory requirement has been discovered mid-project. This requirement will affect the project scope and schedule. Which THREE actions should you take?
Hard456A project manager is leading a cross-functional team that includes members from different departments. Two senior developers have a conflict about the technical approach for a critical component. The conflict is causing delays. What should the project manager do FIRST?
Hard457You are a project manager for a software implementation. The testing team reports that they have found several defects, but the project sponsor insists on releasing the product on the original date to meet a market opportunity. The product is not fully tested. What is the BEST response?
Easy458Your organization is implementing a new project portfolio management (PPM) system. The PMO director wants to ensure that projects are aligned with strategic objectives. Which THREE techniques would be most effective for achieving strategic alignment?
Hard459Midway through your project, a key vendor informs you that they cannot deliver a critical component on time, which will impact the critical path. The risk was identified in the risk register with a 'mitigate' response. What should you do FIRST?
Medium460You are a project manager for a marketing campaign project. A team member has proposed a new approach that could improve the campaign's effectiveness but would require additional budget and extend the timeline. What should you do?
Medium461A project manager discovers that a team member has been taking credit for another teammate's work during stakeholder meetings. This has created tension within the team. What should the PM do?
Hard462You are managing a hybrid project. The team is reporting that sprint velocity has been decreasing for the last three sprints. During the retrospective, the team attributes this to technical debt and unclear requirements. What should you do FIRST?
Medium463During a sprint retrospective, the team expresses frustration that they are frequently interrupted by unplanned work from other departments. The project manager wants to improve team focus. What should the project manager do?
Easy464Your project team is experiencing conflict due to different working styles: some members prefer detailed plans, while others prefer flexibility. The conflict is affecting morale and productivity. Which THREE actions should you take to resolve the situation?
Hard465A resource on a project has been consistently logging 12-14 hours of overtime per day for several weeks. Recently, the resource's productivity has declined and errors have increased. What is the MOST likely cause of the resource issue?
Hard466During a sprint retrospective, the team identifies that the daily standups have become too long (45 minutes instead of 15). Several team members feel the standups are unproductive. As the Scrum Master, what should you do?
Easy467In a daily standup, a developer mentions that a task is taking longer than expected due to an unfamiliar technology. The sprint goal may be at risk. As a Scrum Master, what should you do FIRST?
Easy468You are the project manager for a marketing campaign. A new regulation is announced that affects your project's deliverables. The regulation requires additional compliance steps that were not in the original scope. What should you do FIRST?
Easy469Your project team includes members from different cultural backgrounds. You notice that some team members are uncomfortable challenging ideas during meetings, which you attribute to cultural norms. How can you best promote a culture of open communication?
Medium470During a project's execution phase, a key vendor notifies you that they cannot deliver a critical component on time due to raw material shortages. The component is on the critical path, and any delay will impact the project completion date. The risk was identified and listed in the risk register with a planned response to accept. What should the project manager do first?
Hard471During project execution, a team member discovers a defect in a deliverable that was completed two weeks ago. The defect is minor and can be fixed quickly, but fixing it will require rework that is not in the current sprint. What should you do?
Hard472You are the project manager for a multinational project with team members from diverse cultural backgrounds. You notice that some team members are hesitant to speak up during meetings due to cultural norms. Which TWO actions would best foster an inclusive environment?
Medium473An agile project team is in the middle of a sprint when the product owner introduces a high-priority change that was not part of the sprint backlog. The team is concerned about their ability to deliver the sprint goal. Which TWO options align with the Scrum framework? (Choose two.)
Hard474Your project is in the execution phase, and you discover that a key vendor will deliver a critical component two weeks late, impacting the critical path. The contract does not include penalties for late delivery. What should you do first?
Medium475During a sprint retrospective, the team expresses frustration that they are frequently interrupted by ad-hoc requests from stakeholders. Scrum Master role you are also the PM. What should you do FIRST?
Medium476Your project is using a hybrid approach. A key stakeholder requests a significant scope change that would affect the critical path. The change request has been submitted and approved. What should the project manager do next?
Medium477Your project is in execution phase. The earned value metrics show: EV = $400,000, PV = $500,000, AC = $450,000, BAC = $1,000,000. Which THREE actions should you take to address the project's performance?
Hard478A project manager is leading a cross-functional team that includes members from different departments with conflicting priorities. The project is at risk of delays due to team members not collaborating effectively. What is the best approach for the project manager to resolve this issue?
Medium479You are managing a project using a predictive approach. A key stakeholder requests a minor change that does not affect the critical path but will add two days to the schedule. The team has some idle time. What should you do?
Medium480Based on the resource histogram exhibit, what is the most likely impact on the project if no corrective action is taken?
Hard481A team member has been consistently missing deadlines, causing the team to pick up the slack. The PM has had informal conversations, but the behavior persists. What should the PM do NEXT?
Medium482During a project to implement a new CRM system, the team discovers a new regulatory requirement that affects data privacy. The requirement was not identified during planning. What should the project manager do first?
Medium483Your project team has members from diverse cultural backgrounds. During a conflict resolution session, you notice that some team members are hesitant to express their opinions due to cultural norms. What is the BEST approach to foster an inclusive environment?
Medium484A project manager discovers that a team member has been working on a feature that was not approved. The feature is not in the scope statement. What should the PM do FIRST?
Easy485Your agile team has been working remotely for the past three months. You notice that sprint velocity has dropped significantly over the last two sprints. Team members seem disengaged during daily stand-ups and collaboration has decreased. What should you do FIRST?
Easy486You are managing a software development project using Scrum. During the sprint review, the product owner praises the team's work but mentions that a key stakeholder is unhappy because an expected feature was delivered with limited functionality. The feature was completed according to the sprint backlog, but the stakeholder had not communicated their detailed expectations. What should you do FIRST?
Medium487Your project is in the execution phase. An executive stakeholder has been directly assigning tasks to team members without going through you. Several team members are confused about priorities. What should you do FIRST?
Medium488During a project status meeting, the sponsor asks you to skip the final round of testing to meet the original deadline, stating that the product is already 'good enough.' What is your best response?
Medium489In a Scrum project, the team's velocity has been declining over the last three sprints. The project manager (also the Scrum Master) notices that team morale seems low. What should the project manager do FIRST?
Medium490During a project, the team encounters a risk event that was identified in the risk register. The project manager needs to implement a response. Which THREE actions should the project manager take?
Medium491Your project is executing a fixed-price contract with a vendor to develop a key module. The vendor has delivered a module that does not meet the agreed-upon quality standards. The contract includes penalty clauses for non-compliance. What is the BEST action?
Hard492A project manager is leading a multicultural team where some members are from high-context cultures (e.g., Japan) and others from low-context cultures (e.g., Germany). Misunderstandings have occurred due to differing communication styles. What should the project manager do?
Medium493You are leading a virtual team across three time zones. Team members have expressed feeling isolated and disconnected. Which THREE actions would best improve team cohesion and collaboration?
Medium494A key stakeholder on your agile project frequently attends the daily standup and redirects team members to work on tasks that are not part of the sprint backlog. This is causing confusion and reducing the team's velocity. As the project manager, what should you do first?
Medium495Which TWO are key components of a project management plan? (Choose two.)
Medium496Your project is 40% complete, and the earned value analysis shows CPI = 0.8 and SPI = 0.9. The project sponsor is concerned about the cost overrun and asks you to reduce costs by skipping quality assurance activities. What should you do?
Medium497A project is nearing completion. The project manager is preparing for project closure. Which of the following is the most important activity to complete during project closure?
Easy498A project manager is using a RACI chart to assign responsibilities for key deliverables. Which TWO statements about a RACI chart are true? (Choose two.)
Medium499A project manager is leading a hybrid project. An executive stakeholder bypasses the PM and gives direct orders to the development team. What should the PM do?
Easy500You are the project manager for a software upgrade project. The team is using a hybrid approach with two-week sprints. During sprint planning, the product owner wants to include a user story that the team believes is too large to complete in one sprint. Which TWO actions should you take?
Medium501A project manager is leading a hybrid project. The team has members in three countries, and communication has been challenging. The project manager wants to improve collaboration and build trust among remote team members. Which TWO actions should the project manager take?
Medium502You are leading a virtual team using a hybrid methodology. A team member from another country consistently arrives late to daily stand-ups, disrupting the flow. The team member has not responded to private messages about the issue. What should you do next?
Medium503Which THREE factors are most critical when selecting a conflict resolution technique for a project team? (Choose three.)
Hard504Your project's sponsor requests that you skip user acceptance testing (UAT) to recover schedule delays. The team has already performed thorough internal testing. What should you do FIRST?
Medium505Your project is 40% complete and running 15% over budget due to unforeseen technical challenges. The project sponsor suggests reducing scope by removing non-essential features to meet the budget. What should you do?
Medium506During a project retrospective, the team identifies several process improvements that could increase efficiency. What is the BEST way to ensure these improvements are implemented?
Easy507During a project's execution phase, you discover that a team member has been delivering work that does not meet the quality standards defined in the quality management plan. What should you do FIRST?
Easy508Your project is in the execution phase and a key vendor has notified you that they will be unable to deliver a critical component on time due to a labor strike. Which TWO actions should the project manager take? (Choose two)
Medium509During a project, a risk event occurs that was not identified in the risk register. The project manager needs to respond. Which THREE actions should the project manager take?
Medium510Your project is using a hybrid approach. The development team has completed the deliverables, but the testing team is overwhelmed and behind schedule. The project manager needs to address this resource constraint. Which THREE actions are most appropriate?
Medium511Your project team is distributed across three time zones. You notice that the daily stand-up meetings are poorly attended, and team members complain about meeting fatigue. What is the BEST way to address this situation?
Hard512Your project is using a hybrid approach. Mid-project, the sponsor asks you to skip the testing phase to save time and meet the deadline. The team is concerned about quality. Which THREE actions should you take?
Hard513A key stakeholder insists on bypassing the change control process and demands that a minor scope change be implemented immediately to meet a regulatory deadline. What should the project manager do?
Medium514You are leading a virtual team that includes members from different cultural backgrounds. Several team members have expressed that they feel left out of decision-making because most discussions happen in the project manager's time zone. What is the BEST action to foster inclusion?
Medium515During a sprint review, the product owner requests a significant change to a feature that was just completed. The change would improve user experience but would require reworking two sprints' worth of work. The project is already behind schedule. What should the project manager do first?
Medium516You are leading a virtual project team with members in four countries. A team member from one location complains that another team member from a different location is not responding to emails and messages promptly, causing delays. Upon investigation, you find that the second team member feels their work hours are not respected and they are expected to respond outside their working hours. The team charter does not address communication hours. What should the project manager do FIRST?
Hard517You are managing a software development project using a hybrid approach. Midway through, the customer requests a new feature that was not in the original scope. The team estimates it will add two weeks to the schedule. What should you do FIRST?
Medium518Order the steps for performing project quality assurance.
Medium519A key stakeholder has been bypassing the project manager and giving direct instructions to team members, causing confusion about priorities. What should the project manager do FIRST?
Hard520Your agile team has been experiencing a decline in sprint velocity over the past three sprints. During the retrospective, the team identifies unclear requirements and frequent interruptions as root causes. Which TWO actions should you take to address these issues?
Medium521Your project is using a hybrid approach. During the execution phase, you notice that the cost performance index (CPI) is 0.8 and the schedule performance index (SPI) is 1.1. What does this indicate?
Easy522During project execution, a key stakeholder requests a change that will increase the scope. The project manager follows the formal change control process. What is the first step the project manager should take?
Easy523During a project's execution phase, you receive a change request from a stakeholder that would improve the product's performance but is not required by the original specifications. The change is estimated to add 2 weeks to the schedule and $10,000 to the budget. The project is currently on schedule and under budget. What should you do FIRST?
Medium524Your project is in execution phase. An executive stakeholder bypasses you and directly instructs a team member to add a new feature. The team member complies and completes the work. You discover this during a status review. What should you do FIRST?
Hard525In an agile project, the team's velocity has dropped for three consecutive sprints. The daily standup meetings are rushed, and team members often work in silos. What should the project manager do first?
Hard526Your multinational project has team members in three time zones. The daily standup is held at 9 AM EST, but the Asia team complains it is 9 PM for them. The standup is becoming ineffective. Which TWO actions should you take to improve the situation?
Hard527Your project is using a hybrid approach. At the end of the first iteration, the customer provides feedback that significantly changes the priority of features. The team has already started work on the next iteration's backlog. As the project manager, which THREE actions should you take? (Select exactly three.)
Hard528A project manager is leading a global virtual team with members in three different time zones. The project manager wants to improve collaboration and ensure equitable participation. Which TWO actions are most effective?
Medium529During a daily standup meeting, a team member mentions that they are blocked because a dependency on another team's work is not yet complete. The Scrum Master is present. What should the Scrum Master do FIRST?
Easy530During a project status meeting, an executive stakeholder interrupts and instructs a team member to change a deliverable without going through change control. The team member looks to you for guidance. What should you do?
Hard531Your project is facing significant schedule delays due to unforeseen regulatory changes. You need to compress the schedule. Which TWO techniques are appropriate for schedule compression?
Medium532During a sprint review, the product owner expresses dissatisfaction with a feature delivered by the team, stating it does not meet the acceptance criteria. The team insists they followed the requirements as written. What should the project manager do FIRST?
Medium533A project manager notices that the project's cost performance index (CPI) is 0.8 and the schedule performance index (SPI) is 1.1. What is the MOST likely cause of this situation?
Medium534Your project uses a hybrid approach. The team has been working remotely for six months, and you notice a decline in collaboration and an increase in misunderstandings. What is the BEST action to improve team cohesion?
Medium535In an agile project, the team's velocity has decreased over the last three sprints from 30 story points to 22. During the retrospective, the team cites increasing technical debt as the cause. What should the scrum master do FIRST?
Medium536You are leading an agile team that has experienced a drop in velocity over the last three sprints. The team attributes this to unclear requirements and frequent changes during the sprint. Which TWO actions would best address this?
Easy537A key vendor informs you that due to raw material shortages, they cannot deliver a critical component on time. This component is on the critical path. The risk register included this as a high-probability risk with a contingency plan to use an alternative supplier. What should you do FIRST?
Medium538A project manager is leading a team with diverse cultural backgrounds. Some members are reluctant to speak up in meetings. What is the best strategy to promote inclusive participation?
Medium539During project execution, you receive a change request from a key stakeholder to add a new deliverable. The change would require additional resources and extend the schedule by two months. The project is currently on track. Which THREE actions should you take?
Hard540Your organization is adopting SAFe (Scaled Agile Framework) to improve alignment across multiple agile teams. As a project manager, you are responsible for ensuring that the transformation is successful. Which THREE actions should you take to support the agile transformation?
Hard541A key vendor has informed you that they cannot deliver a critical component for another two weeks, which will delay your project. The component is on the critical path. What should you do first?
Medium542You are the project manager for a software development project using Scrum. During the daily stand-up, two senior developers get into a heated argument about the technical approach for a user story. The sprint goal is at risk. What should you do FIRST?
Medium543A risk that was identified and in the risk register has occurred. The risk response plan involves outsourcing a component, but the vendor is now unable to deliver on time. What should the project manager do FIRST?
Medium544During a sprint review, the product owner expresses dissatisfaction with the feature delivered, stating it does not meet the acceptance criteria. The team disagrees, claiming it meets the definition of done. What should the project manager do first?
Medium545Your project uses a hybrid approach with a fixed-price contract. Midway through, the client requests a significant scope change that would increase project duration by two months. The project manager has assessed the impact and believes the change is beneficial. However, the sponsor is reluctant because of the schedule extension. What should the project manager do?
Hard546You are managing a software development project using a hybrid approach. During a sprint review, the product owner requests a new feature that was not in the backlog. The team estimates it will take 5 additional days. What should you do first?
Medium547During a project status meeting, you notice that one team member consistently interrupts others and dismisses their ideas. This behavior is affecting team morale and collaboration. What should you do first?
Easy548A junior team member consistently misses deadlines, affecting the project schedule. You have spoken to them twice about the issue, but performance has not improved. What should you do NEXT?
Easy549In an agile transformation initiative, the project manager notices that the team's velocity has dropped significantly over the last three sprints. The team cites unclear requirements and frequent interruptions from stakeholders. The project manager also notes that the product owner has been absent from sprint planning and review meetings. What should the project manager do first?
Hard550Your agile team has noticed that sprint velocity has dropped from 30 to 20 story points over the last three sprints. During the retrospective, team members mention unclear requirements and frequent interruptions. As the project manager, what should you do first?
Medium551A project is in execution phase, and a team member consistently misses deadlines, impacting the critical path. The project manager has had informal conversations, but the behavior continues. What should the project manager do next?
Hard552During a project closure phase, you realize that several deliverables were completed but not formally accepted by the customer. The contract requires signed acceptance for each deliverable. What should you do first?
Hard553A project manager is leading a virtual team distributed across three time zones. The team has been performing well, but recently two team members have missed deadlines and seem disengaged. The project manager suspects the cause is related to team member motivation. According to the PMBOK Guide, which theory suggests that people are motivated by achievement, recognition, and growth opportunities?
Hard554A project manager discovers that a team member has been working overtime for weeks to meet a deadline. The team member appears stressed and burnt out. The project manager is concerned about the team member's well-being and the sustainability of the project. What should the project manager do?
Hard555During a sprint planning meeting, the product owner wants to add a high-priority user story that the team believes is too large to complete in one sprint. What should the team do?
Medium556Your agile team has been consistently delivering in each sprint, but the product owner is concerned because the customer's needs have changed and some completed features may no longer be valuable. The project uses fixed-price contract. What should you do?
Hard557During a project, a new regulation is enacted that requires additional compliance testing. The project is in the execution phase. Which THREE actions should the project manager take?
Medium558A new regulatory requirement has been introduced that affects your project's deliverables. The requirement must be implemented within two months. Your project is currently in the execution phase. Which THREE actions should you take?
Medium559An executive stakeholder has been bypassing you and giving direct instructions to your team, causing confusion and scope creep. What should you do FIRST?
Medium560During project execution, you discover that a key vendor will not be able to deliver a critical component on time, which will delay the project by two weeks. The vendor was selected based on the procurement plan. What should you do FIRST?
Easy561You are managing a software development project using a hybrid approach. During a sprint review, the customer expresses satisfaction but requests a small additional feature that was not in the original backlog. The team believes it can be completed in two days without affecting the critical path. What should you do first?
Easy562A project manager is assigned to a troubled project. The team is divided into two factions: one supports a technical solution A, the other solution B. The conflict is causing delays. The project manager wants to resolve this using a collaborative approach. Which THREE actions should the project manager take?
Hard563Your project is using a predictive approach. A key vendor has informed you that they will be unable to deliver a critical component on time, which could delay the project by three weeks. You have identified this risk in the risk register. What should you do first?
Easy564Your project team is distributed across four countries, and you notice that communication is breaking down, leading to misunderstandings and rework. The team members are not using the collaboration tools effectively. What should the project manager do FIRST?
Medium565During a project retrospective, the team identifies several obstacles that are slowing them down, including unclear requirements and lack of access to a testing environment. As a servant leader, what should you do?
Medium566In a hybrid project, the project sponsor asks you to skip the testing phase to meet the deadline. The product is critical for an upcoming trade show. What should you do?
Easy567During a hybrid project, the product owner frequently bypasses you and gives direct instructions to the development team. The team is confused about priorities, and scope creep is occurring. What should you do FIRST?
Medium568A team member has been consistently missing deadlines for the past three sprints. Their work quality is also declining. You have had informal conversations with them, but the problem persists. What is the BEST next step for the project manager?
Medium569Your project is using a predictive approach to build a mobile app. During testing, the team discovers a critical security vulnerability that was not identified during planning. Fixing it will require two additional weeks and $50,000, which is within the contingency reserve. What should you do NEXT?
Medium570You are managing a pharmaceutical research project that is subject to strict regulatory compliance. Mid-project, a new regulation requires additional testing that will add 4 weeks to the schedule and $50,000 in costs. The sponsor is anxious about the delay. What should you do FIRST?
Hard571You are managing a project to deploy a new customer relationship management (CRM) system. During user acceptance testing, the quality assurance team identifies several critical defects that must be fixed before go-live. The project is already behind schedule. What should the project manager do NEXT?
Medium572During a sprint retrospective, the team identifies that the daily standup meetings are running too long and are not focused. They want to improve the effectiveness of the standups. What should the scrum master do?
Easy573You are managing a software development project using a hybrid approach. During a sprint review, the customer is delighted with the progress but requests a new feature that would require significant rework of the current sprint's deliverable. The feature is not in the backlog. What should you do FIRST?
Medium574You are managing a hybrid project with a co-located core team and remote subject matter experts. Two senior developers argue daily about the technical approach for a critical module. The conflict is delaying sprint planning and affecting team morale. Which TWO actions should you take first?
Hard575During a project, an executive stakeholder bypasses the project manager and directly instructs a team member to add a new feature. The team member is already overloaded. What should the project manager do FIRST?
Medium576In an agile project, the team has been working on the same product backlog for several sprints. During sprint planning, the product owner introduces a new high-priority user story that will require the team to reprioritize existing work. What is the BEST approach?
Medium577A project manager is defining the benefits management plan for a new product launch. The company's strategy includes expanding into emerging markets. Which TWO elements must be included in the benefits management plan to align with the company's strategy?
Medium578Match each project management process group to its primary purpose.
Medium579You are the project manager for a large construction project. An executive stakeholder has been bypassing you and directly giving instructions to the site supervisor to add extra features. The supervisor complied, and now the project is experiencing scope creep. The changes have not been formally approved. What should the project manager do first?
Hard580During a project status meeting, a stakeholder requests a change that would improve the product but significantly impact the critical path. The project manager has not yet evaluated the change. What should the project manager do?
Medium581You are a project manager overseeing a 12-month ERP implementation. During sprint 6 of 20, the product owner informs you that a key stakeholder wants to add a new reporting module that was not in the original scope. The team estimates this would add 3 weeks to the schedule. What should you do FIRST?
Medium582A project manager is leading a hybrid project where the team uses Scrum for development but has a fixed end date for regulatory compliance. Halfway through, a key vendor informs you that they will be unable to deliver a critical component on time. What should the project manager do FIRST?
Medium583Your project is in the execution phase when a key risk event from the risk register occurs: a critical team member resigns unexpectedly. You need to minimize the impact on the project. Which THREE actions should you take?
Hard584During a daily standup, a developer mentions she is blocked because two senior engineers are in a heated argument about the technical approach for a critical feature. The disagreement has been ongoing for two days and is affecting the team's velocity. As the Scrum Master, what should you do?
Medium585You are managing a project where a team member consistently misses deadlines. This has caused frustration among other team members and is affecting the project schedule. What should you do FIRST?
Easy586Your hybrid project uses a fixed-price contract with a vendor. The vendor notifies you that they cannot deliver a critical component on time due to a labor shortage. What should you do FIRST?
Hard587During a construction project, you discover that a critical supplier will not be able to deliver steel beams on time due to a labor strike. This risk was identified and listed in the risk register with a planned response of 'accept.' However, the delay will cause a 2-week slip in the critical path. What should you do?
Medium588In a hybrid project, the product owner wants to add a high-priority feature to the current sprint, but the team has already committed to the sprint backlog. The product owner insists it is critical for the upcoming release. What should the project manager do?
Medium589A project is using a predictive approach. The project manager discovers that a team member has been gold-plating by adding extra features to a deliverable without authorization. What should the project manager do FIRST?
Hard590Your project is in the planning phase, and you need to develop the schedule. You have identified the activities and their dependencies. The team estimates that the project will take 12 months. However, the sponsor requires completion in 10 months. The project has a fixed deadline. What should you do FIRST?
Medium591A project team is using a deployment tool to release an application. The deployment failed with an error indicating that a required component is missing from the target environment. What is the most likely cause?
Medium592You are the project manager for a large infrastructure project. The project is in the execution phase when a key vendor notifies you that they will be unable to deliver a critical component on time due to a supply chain disruption. Which TWO actions should you take?
Medium593A project is in the planning phase. The project manager wants to ensure that all stakeholders have a common understanding of the project scope. Which document should be used as the primary reference?
Medium594You are managing a software development project using a hybrid approach. Midway through the project, the product owner requests a new feature that requires changing the scope and schedule. The team is currently working on a critical path activity. What should you do first?
Medium595You are the project manager for a large infrastructure project funded by a government grant that requires the project to deliver specific social benefits within three years. The project is currently in its second year, and a recent audit reveals that the project is on track to exceed its budget by 20% due to unexpected material cost increases. The grant terms stipulate that any cost overrun must be absorbed by the organization, not the grant. Additionally, the project benefits are measured based on the number of beneficiaries served, which is currently 70% of the target. The project sponsor is concerned that cutting costs may reduce the number of beneficiaries and jeopardize the grant conditions. The project team has identified two options: (1) reduce the scope of the project to stay within budget, which would lower the beneficiary count to 60% of target; or (2) request additional funding from the organization, but the CFO is reluctant because the project's return on investment is already marginal. What should the project manager do?
Hard596Your agile team's velocity has dropped for the third consecutive sprint. The team members report feeling burned out and demotivated due to excessive overtime. What should the project manager do first?
Medium597Your agile project has seen a consistent drop in velocity over the last three sprints. The team is demotivated and blaming external dependencies. Retrospectives have not yielded actionable improvements. What should the project manager do FIRST?
Medium598A project is running 15% over budget at its midpoint. The project manager determines that the variance is due to unexpected price increases in raw materials. The project sponsor asks the project manager to reduce the project scope to bring costs back in line. What should the project manager do first?
Medium599A risk event that was identified in the risk register has occurred. The risk response plan involves implementing a contingency plan. Which TWO actions should you take?
Easy600Your project is a large infrastructure build. You have completed the planning phase, but the sponsor has put pressure on you to start construction before all approvals are obtained. The schedule is tight, and any delay could result in penalties. What should the project manager do?
Hard601During a daily standup, a developer mentions she is blocked by a dependency from another team. The issue was not previously identified. As the project manager, what is the BEST action?
Easy602You are the project manager for a software development project using a hybrid approach. During a sprint review, the product owner requests a change that would add a new feature to the current release. The team estimates it will take two additional sprints. What should you do first?
Medium603Your project is experiencing scope creep due to informal change requests from stakeholders. Which TWO actions should you take to address this?
Medium604You are a project manager for a software development project using Scrum. The product owner has been pressuring the team to increase velocity and deliver more features per sprint. The team feels overwhelmed and quality has started to suffer. Which TWO actions should the project manager take to address this situation?
Medium605You are managing a project that is using a hybrid approach. An executive stakeholder has requested a significant change to the project scope. The change has been approved by the change control board (CCB). Which THREE actions should you take next?
Medium606Your agile team has been self-organizing, but recently a team member with strong technical skills has been dominating discussions and decisions, causing others to feel disengaged. The sprint velocity is starting to drop. What is the BEST approach to address this?
Hard607During a project status meeting, an executive stakeholder bypasses you and directly instructs a team member to add a new feature to the current sprint. The team member looks confused. What should you do FIRST?
Medium608You are transitioning a traditional project team to an agile framework. Some team members are resistant to the change. Which THREE strategies should you employ to facilitate the transition?
Medium609During a sprint review, the product owner rejects a user story because it does not meet the acceptance criteria. The developer who completed the story argues that the functionality is sufficient and that the criteria were too strict. Both parties escalate to you. What should you do FIRST?
Medium610A project manager is forming a new virtual team with members from different countries. During the kick-off, the PM wants to build trust and establish norms. Which of the following actions should the PM take FIRST?
Easy611Two senior developers have a conflict over which technical approach to use for a module. The disagreement is delaying the sprint. What should the project manager do FIRST?
Easy612You are managing a project where an executive stakeholder has been bypassing you and directly giving instructions to the team members. This has caused confusion and rework. What should you do FIRST?
Medium613A project manager is reviewing lessons learned from a completed project. The project delivered on time and on budget but did not achieve the expected market share increase. Which document would most likely explain this discrepancy?
Easy614A project manager is reviewing a project plan that must comply with an industry standard. The compliance review fails. What is the most likely cause of this failure?
Hard615During a daily standup, a developer mentions they found a way to improve the code's performance but it will add two extra days of work. What should the scrum master do?
Easy616In the middle of a project, a new regulation is introduced that impacts your project's deliverables. The team needs to make adjustments, but the change will affect the critical path. What should you do first?
Hard617During a quality audit, it is discovered that the team has been using outdated templates for test cases, resulting in some defects that were not caught. What should the project manager do first?
Easy618A project manager is leading a software development project. During a sprint review, the product owner rejects a feature because it does not meet the acceptance criteria. The development team claims they followed the design documents. What should the project manager do first?
Medium619A key vendor informs you that they cannot deliver a critical component on time due to a raw material shortage. This component is on the critical path. The risk was identified and documented in the risk register. What should you do FIRST?
Medium620In a hybrid project, the team uses Scrum but the organization requires detailed phase-gate reviews. During the gate review, the steering committee asks for a Gantt chart showing all tasks until project completion. The Scrum team only maintains a product backlog and sprint backlogs. Which THREE actions should you take?
Hard621Your IT infrastructure project is running 15% over budget at the midpoint. After analyzing the variance, you find that the cost overrun is due to a one-time increase in licensing fees that will not recur. The project is on schedule. What is the BEST estimate for the Estimate at Completion (EAC)?
Hard622Two senior developers on your agile team have a conflict about the technical approach for a user story. This conflict is causing delays. What should the project manager do?
Hard623A new regulation is announced that will affect your project's deliverables. The compliance team has determined that the project must adapt to the new regulation before completion. What should the project manager do FIRST?
Easy624You are the project manager for a software development project using a hybrid approach. Two senior developers have a heated disagreement about the best technical solution for a critical feature. The disagreement is causing delays and affecting team morale. What should you do first?
Easy625You are managing a project that is experiencing scope creep. Several stakeholders have been requesting additional features informally. You want to bring the project under control. Which TWO actions should you take?
Medium626Your agile team is experiencing a drop in velocity over the last three sprints. During the retrospective, team members mention that they are spending too much time on unplanned work and context switching. As the project manager, what should you do?
Easy627You are managing a software development project using a hybrid approach. During a sprint review, the product owner requests a new feature that would add significant value but was not in the product backlog. The team estimates it will take two additional sprints. What should you do FIRST?
Medium628During a team meeting, a junior developer hesitates to share an innovative idea due to fear of criticism. The project manager notices this and wants to foster a culture of psychological safety. What should the project manager do first?
Easy629You are managing a project where a key team member has been consistently missing deadlines. This has caused delays in dependent tasks. The team member has good technical skills but seems overloaded. What is the best course of action for the project manager?
Hard630A project has a critical path of 120 days with a standard deviation of 5 days. The project sponsor wants to know the probability of completing the project within 130 days. Using the normal distribution, what is the approximate probability?
Medium631A new team member from a different cultural background joins your global project team. Some team members are struggling to adapt to his communication style, and misunderstandings are increasing. As the project manager, what should you do first?
Easy632An executive stakeholder has been directly assigning tasks to your agile team members without going through you or the product owner. Team members are confused about priorities and the sprint goal is at risk. What is the best first step?
Medium633In a large program using a hybrid approach, two senior developers have a conflict over the technical design of a critical component. The disagreement is causing delays and affecting team morale. As the program manager, what is the best first step?
Hard634The project sponsor asks you to skip the quality testing phase to meet an aggressive deadline, arguing that the team is experienced and can deliver without it. What should you do?
Hard635A project team is developing a new software feature. During a sprint review, the product owner requests a change that would increase the scope significantly. The team has already committed to the current sprint backlog. What is the BEST course of action for the project manager?
Easy636A new project manager is assigned to a project where the team is geographically distributed across three time zones. Which communication method is most effective for ensuring alignment?
Easy637A new government regulation has been announced that will affect your project's deliverables. The regulation will take effect in three months, and your project is scheduled to complete in six months. What should the project manager do FIRST?
Easy638Your project is using a predictive lifecycle. A team member notices that a task on the critical path is taking longer than estimated, threatening the project completion date. What is the BEST action to take?
Easy639Your agile team is working on a mobile app. The product owner wants to add a new feature that was not in the original backlog. Which TWO actions should you take?
Medium640A key vendor informs you that they cannot deliver a critical component on time due to a raw material shortage. This component is on the critical path. The vendor has a history of poor performance. What should the project manager do FIRST?
Medium641During a project to implement a new CRM system, the sponsor asks you to skip the user acceptance testing (UAT) phase to meet the go-live date, stating that the system has been thoroughly tested by the IT team. What should you do FIRST?
Medium642A project manager notices that the team's velocity has decreased over the last two sprints. Retrospectives have not identified clear causes. The project manager suspects that team members are overworked and possibly experiencing burnout. What should the project manager do first?
Medium643Your project is 50% complete, and your earned value analysis shows: EV = $200,000, PV = $220,000, AC = $240,000. Based on this data, what is the most accurate assessment of the project's performance?
Hard644During a project, a new government regulation is enacted that directly affects your project's deliverables. The regulation requires additional testing and documentation, which will increase costs by 10%. What is the first action you should take?
Easy645You are managing a hybrid project. During the last two sprints, velocity has dropped significantly. The team members complain about unclear priorities and frequent context switching. What should you do first?
Medium646You are managing a hybrid project with both predictive and agile components. A key risk from the risk register materializes: a critical vendor may go bankrupt, threatening delivery of a hardware component needed for the predictive phase. The risk response plan includes 'mitigate by identifying alternative vendors.' However, the only alternative vendor quotes a price that would exceed the project cost baseline by 10%. What should you do NEXT?
Hard647During a daily standup, a developer mentions that they are blocked due to a missing API from a third-party vendor. The vendor had promised delivery two days ago. What should the project manager do FIRST?
Easy648A new team member joins your agile project. They have no experience with Scrum and seem overwhelmed. What should you do to onboard them effectively?
Easy649You are the project manager for a software development project that is using a hybrid approach. A key team member informs you that they have identified a new risk that could cause a two-week delay. The risk is not in the risk register. What should you do FIRST?
Medium650Your project's CPI is 0.85 and SPI is 0.90 at the midpoint. The project sponsor asks for a status update. What should you do?
Medium651Your project is halfway through its timeline and is running 15% over budget due to unexpected vendor price increases. The sponsor is concerned and asks you to cut costs by reducing the number of quality tests. What should you do?
Medium652Your project is running 15% over budget at the midpoint. The cost variance is due to higher-than-expected material costs. What is the BEST action?
Medium653You are leading a virtual team across three time zones. During a video conference, you notice that one team member from the Asia-Pacific region has not spoken for the entire meeting. After the meeting, they email you saying they felt unheard and that their ideas were dismissed by a dominant team member from the US. What should you do FIRST?
Hard654You are managing a software development project using a hybrid approach. During a daily standup, one developer mentions he has identified a potential security flaw in the current build that could significantly impact the release. The fix will require at least two days of additional work. What should you do FIRST?
Medium655You are managing a software development project using a hybrid approach. During a sprint review, the product owner requests a new feature that was not in the backlog. The team estimates it will take one week. The project is on schedule and budget. What should you do FIRST?
Medium656Sequence the steps for conducting a procurement process.
Medium657A project is in the planning phase. The team has identified 50 risks. The project manager wants to prioritize risks for further analysis. Which tool or technique is BEST suited for this?
Medium658In your Scrum project, the development team has been consistently missing sprint commitments. During the retrospective, the team identifies that scope is often added during the sprint by the product owner without consulting the team. What should you do as the Scrum Master?
Easy659Your project is running 15% over budget at the midpoint. The team is working well, but the variance is due to inaccurate cost estimates. What should the project manager do first?
Medium660A project team is distributed across three time zones. Communication delays are causing misunderstandings and rework. What is the BEST way to improve team collaboration?
Easy661In an agile project, the team's velocity has dropped across three consecutive sprints. The project manager suspects that technical debt is causing slowdowns. What should the PM do?
Medium662You are managing a project that is behind schedule. The project sponsor has asked you to explore schedule compression techniques. Which TWO options are valid schedule compression techniques that can be applied without changing scope? (Choose two.)
Medium663During a sprint review, the product owner rejects a user story because it does not meet their expectations, even though the team followed the acceptance criteria. The team is frustrated. What should you do FIRST?
Hard664A project manager is leading a hybrid project. The sponsor requests a significant scope change that will alter the project's business case. Which THREE actions should the project manager take?
Hard665Your project's business case is being reviewed by the portfolio review board. Which THREE components must be included in a well-developed business case?
Easy666During a sprint review, a key stakeholder expresses dissatisfaction with the product increment, stating that it does not meet their expectations. The team followed the acceptance criteria defined in the user stories. What should the project manager do NEXT?
Easy667A project manager is leading a global team with members in three different time zones. The team is experiencing communication delays and misunderstandings. Which of the following is the BEST way to improve project communication?
Hard668During a daily standup meeting, a team member mentions that they encountered a technical issue that will delay their task by two days. The project is time-sensitive. What should the scrum master do FIRST?
Easy669Two senior developers on your hybrid project have a conflict over the technical approach for a critical feature. The conflict is causing delays. What should the project manager do first?
Medium670Your project team includes members from diverse cultural backgrounds. You notice that some team members are not contributing ideas during brainstorming sessions, while others dominate the conversation. What should you do to promote inclusion?
Easy671Your project is using a predictive approach. A team member reports that a key deliverable is behind schedule due to an unexpected technical issue. What should the project manager do first?
Easy672You are managing a project where the team has been working overtime for several weeks to meet a milestone. The milestone is achieved, but the team is exhausted. What should you do to sustain the team's performance?
Easy673Your organization is undergoing an agile transformation. The current project uses Scrum, but the executive sponsor wants to adopt SAFe to align with enterprise strategy. Several team members resist the change, citing loss of autonomy. As the project manager, what should you do first?
Hard674You are managing a project where the sponsor has asked the team to skip testing to save time. The team is against it because they believe it will compromise quality. What should the project manager do?
Hard675During a sprint review, the product owner expresses dissatisfaction with the delivered increment because it does not meet their expectations. The team followed the agreed-upon acceptance criteria. What should the project manager do?
Medium676In an agile project, the team has missed their sprint commitment for the third consecutive sprint. During the retrospective, team members cite unclear requirements and frequent interruptions from stakeholders. As the project manager, what is the BEST action to take?
Medium677A project manager is leading a software development project. The sponsor insists on using a waterfall approach, but the team has experience with agile and believes it would be more effective. What should the project manager do first?
Medium678You are managing a marketing campaign project. A key stakeholder, the VP of Marketing, frequently bypasses you and gives direct instructions to team members. This has caused confusion and rework. What should you do FIRST?
Medium679A project manager is reviewing the project's risk register and identifies several risks that could impact the project. According to PMBOK Guide, which THREE of the following are strategies for negative risks or threats? (Choose three.)
Hard680You are managing a project where a key stakeholder requests a scope change that would add significant value but also increase risk and cost. Which TWO actions should you take FIRST?
Easy681In a hybrid project, the team is experiencing frequent interruptions from support requests that are not part of the project scope. The project manager wants to protect the team's focus. Which THREE actions should the project manager take?
Medium682During project closure, the customer is satisfied with the deliverables and has signed off. However, the project team has not completed the lessons learned documentation. Which TWO actions should you take?
Easy683Your project sponsor asks you to skip the testing phase to save time and meet the deadline, arguing that the team is experienced and the product is simple. What should you do?
Medium684You are managing a software development project using a hybrid approach. During a sprint review, the product owner demonstrates a completed feature to key stakeholders. One stakeholder is impressed and requests an additional functionality that was not in the original scope. The team estimates it would take two additional sprints. What should the project manager do FIRST?
Medium685You are the project manager for a hybrid software development project. During sprint review, the product owner demonstrates a feature that meets the acceptance criteria but the key stakeholder expresses disappointment, saying it does not meet their expectations. What should the project manager do first?
Medium686A team member has informed you that they are feeling burnt out due to the high pace of the project. The project is on schedule and within budget. What should the project manager do?
Medium687You are managing a large-scale construction project. A critical vendor has informed you that they will be delayed by two months due to a raw material shortage. This risk was identified and recorded in the risk register with a contingency plan to use an alternative vendor. However, the alternative vendor's materials are more expensive and will increase project costs by 10%. Which THREE actions should you take?
Hard688You are leading a global virtual team across four time zones. Recently, team members have complained about unclear task assignments and lack of collaboration tools. Which THREE actions would best improve team performance?
Medium689A project manager is leading a large construction project. The sponsor requests that the team skip a mandatory quality inspection to save two weeks on the schedule. The project manager knows that skipping the inspection could compromise safety and violate regulations. What should the project manager do?
Hard690A project team member, who is a key technical expert, has been consistently missing deadlines. The project manager has already discussed the issue informally, but performance has not improved. What should the project manager do next?
Easy691A project manager is managing a construction project and notices that the actual cost for concrete work is consistently 15% above budget. The earned value (EV) is $100,000, and the actual cost (AC) is $115,000. The project manager wants to estimate the cost at completion (EAC) if this trend continues. Which formula should the project manager use?
Hard692During a daily standup, a developer mentions that a third-party API integration is more complex than anticipated and will take an extra two days. The sprint ends in four days. The product owner is not in the meeting. What should the scrum master do FIRST?
Easy693A project manager is developing the project schedule and needs to account for a resource that is only available 50% of the time. Which technique should be used to adjust the schedule?
Medium694You are managing an agile software development team. In the last three sprints, the team's velocity has dropped from 30 to 22 story points. The team members are experienced but seem demotivated. What is the BEST action to take?
Easy695During a project, a key team member consistently misses deadlines, causing delays. The project manager has had informal conversations with the team member, but the situation has not improved. What should the project manager do next?
Medium696Your project is in the executing phase, and you receive a formal complaint from a team member that another team member is consistently late to daily standups and not completing tasks on time. This is causing friction in the team. You have discussed this with both individuals, but the behavior continues. What should you do NEXT?
Hard697A project manager is leading a software development project using agile methodology. The team has completed 3 sprints, but the product owner is dissatisfied because the delivered features do not meet the expected business value. The team claims they followed the prioritized backlog. What should the project manager do?
Hard698During project execution, a key supplier notifies you that they will be unable to deliver a critical component on time. This component is on the critical path. The risk was identified, and the response strategy was to accept the risk. Which THREE actions should you take? (Select exactly three.)
Medium699During a sprint review, the product owner is unhappy with the delivered functionality and insists that the team redo the work to meet their expectations, even though the team met the acceptance criteria defined in the sprint planning. What should the scrum master do FIRST?
Medium700A project manager is leading a globally distributed team with members in four time zones. During a virtual sprint retrospective, two senior developers accuse each other of not completing tasks on time, causing delays. Emotions are high, and the rest of the team is watching. What should the project manager do FIRST?
Medium701Your project is in the execution phase. The earned value metrics are: EV=$200,000, PV=$250,000, AC=$220,000. The project is behind schedule and over budget. You need to present a recovery plan to the steering committee. Which combination of actions is BEST aligned with PMI best practices?
Hard702Your agile team has been consistently delivering high-quality increments, but the product owner recently started bypassing you and giving direct instructions to the development team. The team is confused and some have started working on unapproved features. What should you do first?
Hard703During a daily standup, a developer mentions that a critical integration task is blocked because the API documentation from an external vendor is incomplete. The sprint ends in three days, and this task is on the critical path. What should the scrum master do FIRST?
Medium704A project manager notices that two senior developers are in constant disagreement about the technical approach for a critical feature. The conflict is causing delays and lowering team morale. What should the project manager do first?
Easy705Two senior developers on your agile team have a disagreement about the best technical approach for a user story. The disagreement is causing delays and tension in the team. What should the scrum master do?
Easy706A key vendor has notified you that they cannot deliver a critical component on time due to a raw material shortage. This component is on the project's critical path. What should you do first?
Medium707Your Agile team's velocity has dropped for the third consecutive sprint. The team cites increasing technical debt and unclear requirements. As a servant leader, what is the BEST course of action?
Medium708A project manager is assigned to a complex project with a team distributed across three time zones. The project requires high collaboration and frequent decision-making. The project manager wants to select a team structure that maximizes communication and efficiency. Which organizational structure is most suitable?
Hard709During project execution, you notice that the project's cost performance index (CPI) is 0.9 and schedule performance index (SPI) is 0.95. The project is currently 50% complete. Which THREE actions should you take?
Hard710Your project team is using a hybrid approach. During a sprint, an executive stakeholder contacts a developer directly and asks them to add a new feature without going through the product owner. The developer is confused about what to do. What should you, as the project manager, do to address this?
Medium711An executive stakeholder has been giving direct instructions to your team members, bypassing you as the project manager. This has caused confusion and conflicting priorities. What is the BEST action to take?
Medium712Your project's cost performance index (CPI) is 0.8, and the schedule performance index (SPI) is 1.1. The project is in the execution phase. What is the most likely reason for these indices?
Easy713Your project is running 15% over budget at the midpoint. The sponsor asks you to reduce costs by cutting team training. Which TWO actions should you take?
Medium714Your project is using a predictive approach, and you are at the midpoint. The earned value analysis shows: EV = $450,000, PV = $500,000, AC = $550,000. The CPI is 0.82 and SPI is 0.90. The sponsor asks for a forecast of the total cost at completion. What is the best estimate for EAC assuming the current cost performance is typical of future performance?
Hard715You are managing a project with a fixed-price contract. Midway, a new regulation requires additional compliance testing that was not in the original scope. The cost of this testing is significant. The project has no contingency reserve left. What is the best course of action?
Hard716Arrange the steps for controlling project changes.
Medium717Your project is 80% complete, and the sponsor asks you to skip the final testing phase to release the product early and capture market share. The testing phase is critical for quality. What is the BEST response?
Hard718Your project team is spread across three continents. You notice that the daily stand-ups are becoming less interactive, and team members are not raising blockers. What should you do first to improve team collaboration?
Easy719You are the project manager for a software development project using a hybrid approach. During a sprint review, the product owner requests a significant change to a feature that has already been accepted in a previous sprint. The change would require rework and impact the critical path. What should you do FIRST?
Medium720Your project is behind schedule due to an unexpected delay from a key supplier. The critical path analysis shows that the total float is now negative. What is the BEST course of action?
Hard721A project manager is developing the project schedule. After defining activities and sequencing them, what is the next step in the schedule development process?
Easy722A project manager is developing the schedule for a new product development project. Which TWO techniques can be used to compress the schedule?
Medium723A stakeholder bypasses you and gives direct instructions to a team member to add a new report. The team member has already started working on it. What should the project manager do first?
Easy724Your project is in the execution phase when a new regulation is passed that affects the project's deliverables. The team is already working at full capacity. What should the project manager do FIRST?
Hard725In a hybrid project, the development team is using Scrum, and the project manager is responsible for overall coordination. During a sprint, the product owner asks the team to add a high-priority user story that was not included in the sprint planning. The team is concerned about overcommitment. What should the project manager do?
Hard726Your project team includes members from diverse cultural backgrounds. You notice that some team members are hesitant to speak up during meetings due to cultural norms about hierarchy. Which TWO approaches would best promote inclusive participation?
Medium727You are managing a hybrid software development project. During the daily stand-up, two senior developers get into a heated argument about the best technical approach for a critical feature. The argument is delaying the meeting and causing tension. As the project manager, what should you do first?
Medium728Which THREE of the following are common causes of project change requests?
Hard729A project team is implementing a new software feature. During testing, a critical defect is found that could delay the release. The project manager needs to determine the root cause. Which tool or technique should be used?
Medium730A project manager is leading a software development project in an organization that uses a hybrid methodology. The team's sprint velocity has dropped for three consecutive sprints. Which THREE actions should the PM take to address this? (Choose three)
Hard731Your agile project is experiencing a drop in velocity for the third consecutive sprint. The team reports that they are spending too much time in unplanned meetings and dealing with frequent requirement changes. Which TWO actions should you take to address this?
Medium732During a sprint retrospective, the team identifies that velocity has dropped due to too many interruptions. What agile technique should the Scrum Master recommend to address this?
Easy733You are managing a virtual team across four time zones. Team members report feeling disconnected and communication is becoming fragmented. What is the BEST way to improve team cohesion?
Easy734Your project is in the execution phase when a new government regulation is announced that could affect your project's compliance requirements. The regulation is not yet in effect but will be before project completion. What should you do FIRST?
Hard735You are a project manager overseeing a 12-month ERP implementation. During sprint 6 of 20, the product owner informs you that a key stakeholder wants to add a new reporting module that was not in the original scope. The team estimates this would add 3 weeks to the schedule. What should you do FIRST?
Medium736A project using a predictive approach is 40% complete. The earned value (EV) is $200,000, the planned value (PV) is $250,000, and the actual cost (AC) is $230,000. What should the project manager do NEXT?
Medium737You are managing a project that is experiencing scope creep. Several stakeholders have been informally requesting additional features directly from team members. Which TWO actions should you take to address this?
Medium738A project is 60% complete. The earned value (EV) is $120,000, the planned value (PV) is $150,000, and the actual cost (AC) is $130,000. What is the cost performance index (CPI) and what does it indicate?
Medium739Your agile team is struggling with consistently low velocity. The team is demotivated. Which THREE actions should the project manager take to address this?
Medium740You are managing a software upgrade project. A senior executive bypasses you and directly instructs a team member to include a new feature in the release. The team member is confused and asks for your direction. What should you do FIRST?
Medium741A project manager is closing a project and compiling lessons learned. The project delivered its objectives but exceeded the budget by 10%. What should the PM include in the lessons learned?
Medium742Which TWO of the following are recognized benefits of using a team charter in project management?
Easy743You are leading a globally distributed team with members in three time zones. During a virtual sprint retrospective, team members express frustration that decisions are often made without their input, leading to rework. What is the BEST action to improve team empowerment and collaboration?
Hard744An organization is transitioning from a traditional waterfall approach to agile. The project manager is tasked with leading a pilot agile project. During sprint planning, the product owner prioritizes features based on stakeholder feedback. However, the team is concerned that the prioritized features do not align with the organization's strategic goals. What should the project manager do?
Medium745A project manager notices that two junior team members are struggling with a new technology required for the project. They are frustrated and their productivity is low. What should the project manager do?
Easy746During a sprint retrospective, the team identifies that their velocity has dropped significantly in the last two sprints. What should the scrum master do FIRST?
Medium747You are the project manager for a team that recently transitioned to remote work. You notice that team morale is declining and collaboration has decreased. What is the BEST action to improve team cohesion?
Easy748A project manager is leading a large-scale agile transformation. The organization has a history of failed change initiatives, and there is resistance from middle management. The project sponsor is fully committed but wants to see quick results. What should the project manager do first?
Hard749A conflict has arisen between two functional managers whose teams are working on your project. They disagree on resource allocation and priorities, and the conflict is delaying progress. Which THREE actions should the project manager take to resolve the situation?
Hard750During a project to develop a new mobile app, a key team member has been consistently underperforming, missing deadlines, and delivering low-quality work. The team is becoming demotivated. You have had informal conversations with the team member, but performance has not improved. What should you do NEXT?
Hard751During a project, a key stakeholder requests a change that will increase the project scope. The project manager evaluates the impact and determines it will add two weeks to the schedule but no additional cost. The change request is approved by the change control board (CCB). What should the project manager do next?
Hard752In a hybrid project, the team has been using both Kanban and traditional planning. The product owner requests that the team focus on completing all work in the current iteration before taking on new tasks. However, the team has been pulling new work as capacity allows. What is the BEST action for the project manager?
Medium753Your agile team's velocity has been declining for the past three sprints. The team cites increasing technical debt and unclear requirements. As the project manager, which THREE actions should you take to address this?
Hard754You are managing a distributed team with members in different time zones. A team member complains that they feel isolated and uninformed about project decisions. What should you do FIRST to address this?
Medium755A project is falling behind schedule, and the project manager wants to get it back on track. Which TWO schedule compression techniques are most appropriate?
Medium756Your agile team has been working together for three months, and you notice that sprint velocity has been steadily declining. During the retrospective, team members mention they feel overworked and unclear about priorities. What is the BEST action to take?
Easy757A project team member has been consistently missing deadlines for the past two weeks, causing delays for dependent tasks. When you speak with them, they mention personal issues but assure you they will catch up. What is the BEST approach?
Medium758In an agile project, the team's velocity has been declining over the last three sprints. The team is delivering fewer story points each sprint. The product owner is concerned about the release date. What should the Scrum Master do first?
Medium759Your project is using a hybrid approach with both predictive and agile elements. Mid-project, a key stakeholder requests a significant scope change that would affect the critical path. Which THREE actions should you take?
Hard760A project manager is building a new project team. Which TWO actions are most effective for establishing a high-performing team?
Medium761During a project status meeting, an executive stakeholder informs the team that they have instructed a developer to add a new feature to the product without going through the change control process. The developer has already completed the work. What should the project manager do NEXT?
Medium762Your project is 60% complete. The cost performance index (CPI) is 1.1, and the schedule performance index (SPI) is 0.85. The project sponsor is concerned about the schedule delay. Which of the following is the BEST action to take?
Medium763A project manager is leading a digital transformation initiative. Midway through the project, a new regulation is introduced that affects the product's compliance requirements. The project sponsor is concerned about potential scope creep and delays. What should the project manager do first?
Hard764A project manager is leading a construction project. During execution, a new environmental regulation is enacted that directly affects the project's waste disposal process. What should the project manager do first?
Easy765During project execution, a key stakeholder requests a change that will increase project scope by 15% but will also reduce operational costs by 20% after deployment. The project is currently on schedule and under budget. The project manager should FIRST:
Hard766You are the project manager for a large IT infrastructure upgrade. An executive stakeholder has been bypassing you and directly assigning tasks to team members. This has caused confusion and rework. What should you do FIRST?
Hard767During a daily standup, a developer mentions that they have started working on an additional feature requested by the product owner, which was not in the sprint backlog. What should the scrum master do?
Easy768A new government regulation is announced that will impact your project's deliverables. The regulation requires additional compliance testing that was not in the original scope. The project is currently on schedule and within budget. What should you do FIRST?
Hard769You are managing a software development project using an Agile approach. The team consists of 8 developers and 2 testers. During the last three sprints, the team has consistently delivered about 70% of planned story points. The product owner is frustrated because key features are being delayed. The team reports that they are spending too much time fixing defects found during testing, and that the testers are a bottleneck. Upon reviewing the definition of done, you notice that unit tests are required but not always written, and integration tests are done only at the end of the sprint. What is the BEST course of action to address the root cause?
Medium770You are managing a project to develop a new mobile app. During the testing phase, the quality assurance team discovers a critical bug that could delay the release by two weeks. The product owner insists on releasing on the original date to meet a market opportunity. What should you do?
Medium771You are managing a hybrid project using Scrum for development and a predictive approach for regulatory deliverables. During the daily standup, two senior developers disagree strongly on the technical approach to implement a user story. The disagreement is causing tension and slowing progress. As the project manager, what should you do FIRST?
Medium772You are managing a construction project. During a quality audit, you find that the concrete used in the foundation does not meet the specified strength requirements. The team has already poured the concrete. The project is on a tight schedule, and rework will delay the project by three weeks. What should you do NEXT?
Hard773You are managing a construction project using a predictive approach. A key vendor informs you that they will not be able to deliver a critical component for another two weeks, which will delay the project. What should you do FIRST?
Medium774Your project team is newly formed, and you notice that members are hesitant to share ideas during meetings. To build a high-performing team, what should you do first?
Easy775You are managing a project that is on schedule and under budget. A key stakeholder requests a significant scope change that would improve the product's value but also extend the schedule by 20%. The change has not been through change control. What should you do?
Hard776You are the project manager for a construction project. A risk event that was identified in the risk register has just occurred: a key supplier is unable to deliver critical materials on time. The risk response plan includes a contingency reserve. What should you do FIRST?
Easy777Your project is using a hybrid approach. The client has requested a change that would significantly alter the product's core functionality. The change is not aligned with the project's business case. Which TWO actions should the project manager take?
Hard778You are managing a large project with multiple stakeholders. One executive stakeholder has been bypassing you and giving direct instructions to the team, causing confusion. What should you do FIRST?
Medium779During the execution phase of a road construction project, the team discovers an unmarked underground utility line that was not shown on any plans. Working near it poses a safety risk, and the project must halt until the utility is identified and mapped. The risk register did not include this specific risk. What should the project manager do FIRST?
Medium780During a daily standup, a developer mentions that a risk identified in the risk register has occurred and is causing a one-day delay. The risk response plan includes a mitigation strategy that can be implemented immediately. What should the project manager do FIRST?
Easy781Your project is behind schedule, and you need to compress the schedule. The critical path has been identified. What is the BEST schedule compression technique to use if you have additional budget available?
Medium782Your project is using a predictive approach, and you are in the execution phase. A key stakeholder requests a minor change that you believe will improve the product but is not in the scope. What should you do?
Medium783You are managing a project in a virtual environment. A team member from a different time zone misses an important deadline because he was not aware of the priority due to a language barrier. What should you do first?
Medium784During a large infrastructure project, the sponsor requests that the project manager skip the final round of user acceptance testing (UAT) to meet the regulatory deadline, stating that the system has passed all previous tests. What should the project manager do?
Medium785The project team is in the process of identifying risks. Which tool or technique should the project manager use to identify risks?
Easy786A project manager is developing a business case for a new project. Which TWO elements are essential for a strong business case?
Easy787A project manager is reviewing the quality metrics of a software development project. The testing team has found that the defect rate has increased significantly in the last two builds. What is the first action the project manager should take?
Easy788Refer to the exhibit. The project's access control policy allows read access only from the internal network (10.0.0.0/8) and denies access if not using an encrypted connection. A developer reports that they can access the repository from a machine with IP 10.0.0.5 using an encrypted connection. However, they cannot access it from a machine with IP 10.0.0.6 using an unencrypted connection. What is the most likely reason?
Hard789A critical risk identified in the risk register has occurred. The planned response was to mitigate, but the impact is higher than anticipated. What should the project manager do FIRST?
Medium790A new team member from a different cultural background joins your project. They seem hesitant to share opinions during meetings and prefer written communication. Some team members perceive this as disengagement. As the project manager, what is the BEST approach?
Easy791In a Scrum project, the team's velocity has been dropping over the last three sprints. The team members seem demotivated and are complaining about too many meetings and unclear priorities. As the agile project manager, what should you do FIRST?
Medium792You are managing a project using a predictive approach. A team member has been consistently missing deadlines, causing delays for the rest of the team. You have already had an informal conversation about expectations. What should you do next?
Easy793Your construction project is ahead of schedule but over budget. The earned value metrics are: EV = $500,000, PV = $450,000, AC = $550,000. What is the cost performance index (CPI) and schedule performance index (SPI)?
Medium794You are leading a Scrum team. For the past three sprints, the team has consistently completed all committed user stories. The product owner wants to increase the team's velocity by 20%. What should you do?
Medium795You are closing a project phase. Which THREE activities should be performed during the project closure process?
Easy796During project execution, a key team member resigns. The project manager needs to fill the position quickly. What is the FIRST step the project manager should take?
Easy797A project manager is leading a team that includes members from different departments. One team member frequently misses team meetings and fails to update task status. What should the project manager do?
Easy798Your project team is distributed across three time zones. You notice that team members from one location often dominate discussions during daily stand-ups, while others remain silent. As a result, collaboration is suffering. What should you do first?
Medium799A change request that affects the critical path has been approved. What is the NEXT step for the project manager?
Easy800Which TWO of the following are typically included in a business case? (Choose two.)
MediumOther domains
All PMP exam domains
Frequently asked questions
- What does the scenario questions domain cover on the PMP exam?
- scenario questions questions test whether you can apply the concept in context, not just recognise a definition.
- How many questions are in this domain?
- This page lists all 800 scenario questions questions in the PMP question bank. The actual exam draws from this domain proportionally to its weighting in the official exam blueprint.
- What is the best way to practise this domain?
- Start with a short focused session (10 questions) to identify gaps, then work through explanations. Repeat with a longer session once the weak areas feel solid.
- Can I practise only scenario questions questions?
- Yes — the session launcher on this page filters questions to this domain only. Choose any session length for inline explanations and scoring.