A project manager is using a tool to track project tasks, dependencies, and resource assignments. The team needs to see the critical path and adjust schedules when tasks are delayed. Which tool should the project manager use?
2During project execution, a project manager notices that team members are spending excessive time on non-essential tasks, and the project is falling behind schedule. Which tool should the project manager use first to identify the root cause of the delays?
3A project team is working on a software development project. The project manager wants to ensure that all changes to the codebase are reviewed and approved before they are integrated. Which type of tool should be used?
4A project manager needs to document the process for submitting and approving change requests. Which document should the project manager create?
5A project manager is tracking project performance and notices that the SPI is 0.8 and the CPI is 1.2. What does this indicate about the project?
6A project manager is creating a document that identifies all project stakeholders and their influence, interest, and impact on the project. Which document is being created?
7A project manager wants to visually represent the flow of tasks and decision points in a business process. Which tool should be used?
8During project planning, the project manager needs to estimate the cost of each work package. Which tool or technique is best suited for this?
9A project manager is documenting the specific actions that will be taken to manage and control risks throughout the project. Which document is this?
10A project team is using a tool to manage user stories, sprints, and backlog items in an Agile project. Which tool is most appropriate?
11A project manager is reviewing the project budget and notices that the actual cost is significantly higher than planned. The project manager wants to identify which specific work packages are causing the overrun. Which report or tool should be used?
12Which TWO documents are typically created during the project planning phase?
13Which THREE items are typically included in a project status report?
14Which TWO tools are used for quality management in a project?
15Which THREE documents are part of the project procurement management process?
16A project manager at a mid-sized software company is leading a project to develop a new mobile application. The project is in the execution phase, and the team is using an Agile methodology with two-week sprints. The project manager has been using a shared spreadsheet to track tasks, but team members frequently report that they are unsure of what tasks to work on next, and there is confusion about which tasks are blocked. Additionally, the project manager is spending several hours each day updating the spreadsheet and answering questions about task status. The company has a subscription to Jira, but the team has not been using it. The project manager wants to improve visibility and reduce administrative overhead. What should the project manager do first?
17A senior project manager is overseeing a large infrastructure upgrade project for a government agency. The project involves multiple vendors and strict compliance requirements. The project team has been using a shared network drive to store project documents, but team members often struggle to find the latest versions of documents, and there have been instances where outdated documents were used, leading to rework. The project manager needs to implement a solution that ensures document version control, access control, and audit trails. The agency has a limited budget and cannot afford expensive enterprise content management systems. What is the best course of action?
18A project manager is developing a communication plan for a software implementation project. The team includes developers, business analysts, and external vendors. Which document should the project manager reference to ensure communication aligns with stakeholder expectations?
19During project execution, a team member reports that a critical deliverable is behind schedule due to an unexpected dependency. The project manager needs to update the project schedule and communicate the impact. Which tool should the project manager use first to assess the impact on the critical path?
20A project sponsor asks for a document that outlines the high-level scope, objectives, and key stakeholders of a new project. Which document should the project manager provide?
21Which TWO documents are typically created during the planning process group?
22Which THREE items are typically included in a project status report?
23Refer to the exhibit. What is the total float for task C?
24You are the project manager for a cloud migration project at a mid-sized company. The project team consists of internal IT staff and a third-party vendor responsible for data transfer. During a weekly status meeting, you discover that the vendor has been using an unauthorized tool to accelerate data transfer, which violates the security policy outlined in the project charter. The vendor claims the tool is necessary to meet the aggressive timeline. The project sponsor is concerned about security but also about schedule delays. You need to take the most appropriate action to address this issue while maintaining project control. Which action should you take?
25A project team is creating a work breakdown structure (WBS) for a software development project. The project manager wants to ensure that all deliverables are identified and decomposed into manageable work packages. Which tool should the team use to represent the hierarchical decomposition of the work?
26An IT project manager is using a project management software tool to track progress. The tool shows that the project's SPI is 0.8 and CPI is 1.1. Which conclusion can the project manager draw about the project's performance?
27A project manager needs to document the roles and responsibilities of team members for a new project. Which document should the project manager create?
28During a project status meeting, a team member reports that a critical task is delayed due to a vendor not delivering a required component. The project manager needs to update the project schedule and communicate the impact. Which tool should the project manager use to analyze the effect of this delay on the overall project timeline?
29A project manager is reviewing a change request that has been approved. The change will affect the project scope, schedule, and budget. Which document should the project manager update first to ensure all changes are captured and communicated?
30Which TWO documents are typically used to formally document and communicate a project's acceptance criteria and final deliverables?
31A project manager is conducting a risk assessment workshop. Which THREE items should be included in the risk register for each identified risk?
32You are a project manager for a software development company that uses an Agile methodology with two-week sprints. The team uses Jira for task tracking and Confluence for documentation. During the latest sprint review, stakeholders expressed confusion about the current project status because the burndown chart shows a steady increase in remaining work. Upon investigation, you discover that the development team has been adding new tasks to the current sprint without updating the sprint backlog or adjusting the scope. The product owner is unaware of these additions. The team complains that they are overworked and missing deadlines. Which of the following is the BEST course of action to address the situation?
33A project team is working on a software development project and needs to track changes to requirements, design documents, and source code. They want to ensure that all team members can access the latest versions and that changes are logged with the author and timestamp. Which type of tool should the project manager implement to meet these needs?
34A project manager is building a project schedule and needs to identify the critical path. Which TWO techniques are commonly used in project scheduling tools to help determine the critical path?
35Refer to the exhibit. The project manager is reviewing the project schedule. What is the total duration of the critical path?
36Arrange the phases of the project life cycle in the correct order.
37Put the steps for closing a project in the correct order.
38Match each project management methodology or framework to its key characteristic.
39Match each communication method to its description.
40A project manager is using a Kanban board to visualize workflow. Which metric should the team track to measure process efficiency?
41During project execution, a stakeholder requests a change that will increase the project cost by 10%. The project manager documents the change and submits it to the change control board (CCB). After review, the CCB approves the change. Which document should the project manager update first?
42A project team is using a document management system with version control. A team member accidentally overwrites the latest version of the project charter with an older draft. What is the BEST way to recover the correct version?
43A project manager is creating a communication plan. Which tool is BEST for tracking the status of project deliverables and their approval?
44During project planning, the project manager wants to identify all documents that will be created and maintained throughout the project. Which project document should the project manager create?
45A project manager is using a prioritized list of project risks. Each risk has an assigned owner and a planned response. The project manager notices that one risk has a high probability and impact, but no response has been planned. What should the project manager do FIRST?
46A project team is distributed across three time zones. The project manager needs a tool for real-time collaboration, file sharing, and instant messaging. Which type of tool is MOST appropriate?
47A project manager is reviewing the project schedule and notices that the critical path has a duration of 120 days. One activity on the critical path has a duration of 15 days and a total float of 0. If the duration of that activity is reduced by 5 days, what is the new critical path duration?
48A project manager is using an issue log to track problems. During a weekly status meeting, a team member reports a new issue that has already caused a one-day delay. The project manager adds it to the issue log. What is the NEXT step?
49Which TWO documents are typically included in the project management plan?
50Which THREE tools are commonly used for measuring project performance against the baseline?
51Which TWO documents should be updated when a change request is approved?
52A project manager is updating the project schedule and notices that the critical path has changed due to a delay in a key task. Which document should the project manager update first to reflect this change?
53A project sponsor asks for a report showing the planned vs. actual cost performance. Which project document contains the necessary data to create this report?
54During a project kickoff meeting, the team identifies several potential risks. The project manager decides to document them in a structured format. Which project document should the project manager use to record and track these risks throughout the project?
55A project team is working on a software development project. The project manager needs to track which team members are assigned to each task. Which document provides this information?
56After a change request is approved, the project manager updates the project baseline. Which document must also be updated to reflect the impact of the change on project risks?
57A project manager is reviewing the project's earned value data. The cost performance index (CPI) is 0.85, and the schedule performance index (SPI) is 1.05. What does this indicate about the project?
58A stakeholder requests a copy of the project's requirements documentation. Which document would the project manager provide to meet this request?
59The project team is experiencing conflicts over task assignments. Which document should the project manager reference to clarify roles and responsibilities?
60A project manager is preparing a status report for stakeholders. The project is currently in the execution phase. Which key performance indicator should be included to show how efficiently the project is using its budget?
61A project manager is creating a project charter. Which TWO components are typically included in a project charter? (Choose two.)
62A project manager is reviewing the lessons learned from a previous project. Which TWO documents are commonly used to capture lessons learned? (Choose two.)
63A project manager is developing a stakeholder engagement plan. Which THREE items should be included in this plan? (Choose three.)
64Refer to the exhibit. Based on the project status report, what is the cost variance (CV) and what does it indicate?
65Refer to the exhibit. What is the total duration of the critical path?
66Refer to the exhibit. According to the stakeholder register entry, how should the project manager engage the sponsor?
67A project team is distributed across three continents. The project manager needs a tool that allows real-time collaboration on project documents, version control, and task assignment. Which type of tool is BEST for this requirement?
68Which document formally authorizes the project and identifies the project manager?
69A project manager is using a Gantt chart to track progress. Which tool would BEST complement the Gantt chart to show task dependencies and the critical path?
70During project execution, a stakeholder requests a new feature that was not in the original scope. The project manager adds it to the change log and obtains approval. Which document should be updated NEXT?
71Which document defines how project information is distributed to stakeholders and who receives what information?
72A project manager is reviewing the risk register and sees that a high-probability, high-impact risk has a response strategy of 'mitigate' with a planned action to purchase insurance. This is an example of which risk response strategy?
73At the end of a project phase, the team holds a meeting to discuss what went well and what could be improved. Which document is produced from this meeting?
74Which document breaks down the project deliverables into smaller, more manageable components?
75A project manager receives a status report showing that the project is behind schedule. The report uses a red-yellow-green status indicator. What does the red indicator typically signify?
76Which TWO tools are commonly used for project scheduling and displaying task dependencies? (Select TWO)
77Which THREE items are typically found in a project charter? (Select THREE)
78Which TWO documents are used to track changes that occur during a project? (Select TWO)
79Refer to the exhibit. What is the critical path duration?
80Refer to the exhibit. Based on the risk register, which risk has the HIGHEST priority?
81Refer to the exhibit. Which change should be implemented FIRST?
82A project manager notices that a task on the critical path is delayed by 3 days. Which tool should the project manager use to determine the impact on the project completion date?
83A project sponsor asks for a document that formally authorizes the project and provides the project manager with authority to apply resources. Which document should the project manager provide?
84During project execution, the team uses a shared online workspace to collaborate on documents. This is an example of which type of tool?
85A project manager needs to break down the project scope into smaller, manageable components. Which tool should they use?
86After a change request is approved, the project manager updates the project management plan. This is an example of updating which type of document?
87A project manager is preparing a report for stakeholders that lists project risks, their impact, and response strategies. Which document should be used?
88Which project management tool displays project tasks against a timeline and shows dependencies?
89A project manager wants to analyze the project schedule to identify the longest path of dependent tasks. Which technique should be used?
90During a status meeting, a team member reports that a task is taking longer than estimated. The project manager updates the task's remaining duration in the project schedule. This action is part of which process?
91A project manager is creating a lessons learned document. Which TWO are typical components of lessons learned? (Choose two.)
92Which THREE are common types of project management documentation? (Choose three.)
93A project manager needs to communicate project status to stakeholders. Which TWO tools are suitable for this purpose? (Choose two.)
94Refer to the exhibit. Based on the exhibit, which response strategy is the project manager planning to use for this risk?
95Refer to the exhibit. Based on the exhibit, what is the status of change C001?
96Refer to the exhibit. Which element of the project charter is missing from this exhibit?
97A project manager needs to track task dependencies and identify the critical path. Which tool should they use?
98During project planning, the team identifies high uncertainty that could affect the schedule. Which document should the project manager create or update?
99A project has earned value (EV) of $50,000, actual cost (AC) of $60,000, and planned value (PV) of $55,000. What is the cost performance index (CPI)?
100Which document formally authorizes the project and assigns the project manager?
101A team uses a tool that clarifies roles by showing who is responsible, accountable, consulted, and informed for each task. Which tool is this?
102In a network diagram, Activity A has early start (ES) of 0 and early finish (EF) of 5. Activity B depends on A and has ES=5, EF=10. Activity C also depends on A and has ES=5, EF=12. Activity D depends on B and C and has ES=12, EF=15. What is the total float for Activity C?
103Which document is used to record and track changes to project scope and their approval status?
104A project manager wants to measure the percentage of work completed compared to the planned schedule. Which metric should be used?
105A project has a budget at completion (BAC) of $200,000. The earned value (EV) is $100,000 and the actual cost (AC) is $120,000. If the cost performance is expected to continue, what is the estimate at completion (EAC)?
106Which TWO documents are typically created during the project initiation phase? (Select TWO.)
107Which TWO tools are commonly used for schedule management? (Select TWO.)
108Which THREE are examples of direct costs in a project? (Select THREE.)
109Refer to the exhibit. What is the duration of the critical path?
110Refer to the exhibit. What is the estimate to complete (ETC) assuming the same cost efficiency?
111Refer to the exhibit. Which WBS element is a work package?
112A project manager needs to track the start and end dates of tasks as well as dependencies. Which tool should be used?
113A project manager wants to document knowledge gained during the project to help future projects. Which document should be used?
114Which tool shows the hierarchical breakdown of work to be performed by the project team?
115A project team is sharing documents via email but experiencing version confusion. Which tool should the PM implement to improve version control?
116During project execution, a stakeholder requests a change that will increase costs. Which document should the PM update first?
117In a RACI matrix, which role is responsible for performing the work?
118A project manager is using a tool that plots risks based on their probability of occurrence and potential impact. What is this tool?
119A project has many stakeholders with varying interests and influence. Which document should the PM use to plan how to engage them?
120Which document formally authorizes the project and provides the project manager with the authority to apply resources?
121Which TWO tools are commonly used for project scheduling?
122Which THREE documents are typically part of the project management plan?
123Which TWO items are typically included in a project status report?
124Refer to the exhibit. What should the project manager do first?
125Refer to the exhibit. Which risk should the project manager address first?
126Refer to the exhibit. What is the total duration of the project on the critical path?
127A project manager is developing the project charter and needs to identify the key stakeholders who will influence the project's success. Which tool or document should the project manager use to capture this information?
128A project schedule is displayed as a bar chart showing tasks against a calendar. Which tool is being used?
129Refer to the exhibit. Based on the risk register, which risk should the project manager prioritize for immediate response?
130A project has a CPI of 0.8 and an SPI of 1.1. Which statement describes the project's performance?
131A project manager is creating a communication plan. Which element should be included to ensure stakeholders receive information in a timely manner?
132Which document decomposes project deliverables into smaller, more manageable components?
133During project execution, a key stakeholder requests a change that increases scope. According to the project management plan, which document should the project manager update first?
134A project is closing. The project manager collects feedback from the team on what went well and what could be improved. Which document is being created?
135A project manager uses a tool that shows the sequence of project activities and their dependencies. Which tool is this?
136Which TWO tools are commonly used for risk identification in a project?
137Which TWO documents should be finalized during project closure?
138Which THREE components are typically included in a project management plan?
139A software development project is currently in the execution phase. The project manager has a team of 10 developers and 2 testers. The project is scheduled to be completed in 6 months, with a budget of $500,000. At the end of month 3, the project manager reviews the status and finds that only 40% of the work is complete, whereas 50% was planned. The actual cost incurred is $280,000. The project manager calculates the CPI as 0.71 and the SPI as 0.80. The project sponsor is concerned and asks for a recovery plan. The project manager must decide the best course of action. Which action should the project manager take?
140A construction project is underway, and the project manager is using a Gantt chart to track progress. The project is divided into five phases: Foundation, Framing, Plumbing, Electrical, and Finishing. The project manager notices that the Framing phase is behind schedule because of a delayed material shipment. The Gantt chart shows that Framing has a predecessor of Foundation and a successor of Plumbing. The project manager updates the Gantt chart to reflect the delay. Which action should the project manager take next?
141A marketing project manager is responsible for launching a new product. The project manager has created a project charter, a stakeholder register, and a high-level schedule. The sponsor has approved the charter. The project manager needs to develop a detailed project plan. According to best practices, what should the project manager do next?
142A project manager is leading a team that uses a shared network drive for storing project documents. Multiple team members have accidentally overwritten each other's work, causing confusion. Which tool should the project manager implement to prevent this issue?
143Which TWO tools are commonly used for project status reporting and communication with stakeholders?
144Which THREE documents are typically finalized during the project closure phase?
145You are a project manager for a software development project. The team uses a cloud-based project management tool that includes features like task assignment, Gantt charts, and document storage. During a status meeting, a team member reports that they cannot find the latest version of the project schedule. Several team members have been updating the schedule file directly on the shared drive without version control. As a result, the file has multiple conflicting copies. You need to resolve this issue and prevent it from recurring. Which course of action should you take?
146A project manager is overseeing a construction project. The team uses a shared spreadsheet to track project issues. Recently, the spreadsheet has become cluttered with duplicate entries and outdated information. The project manager wants to implement a more structured approach for issue tracking. The tool must allow team members to submit issues, assign owners, set priorities, and track resolution progress. Additionally, it should generate reports for stakeholders. Which tool should the project manager choose?
147A project team is distributed across three time zones. The project manager needs to collaborate on project documents in real-time and maintain a single source of truth. The documents include the project plan, requirements, and design specifications. Some team members have been emailing different versions, causing confusion. The project manager wants to adopt a tool that allows simultaneous editing, version history, and access control. Which tool should the project manager implement?
148You are managing a marketing campaign project. The team uses a project management software that includes a resource management module. You notice that several team members are overallocated, and project tasks are at risk of delay. The software allows you to view resource capacity and assignments, but the data is not being updated regularly. You need to ensure resource conflicts are identified and resolved quickly. Which action should you take?
149A project manager is leading a project to implement a new customer relationship management (CRM) system. The project requires extensive documentation, including business requirements, technical specifications, test plans, and user manuals. The team is using a shared repository but is struggling with document organization and version control. Several documents have outdated information, and team members are unsure which version is current. The project manager decides to implement a document management process. Which approach should the project manager adopt?
150During a project audit, the project manager discovers that several change requests were implemented without proper documentation. The project team used a verbal approval process, and changes were made directly to project documents without updating the change log. The project manager needs to establish a formal change control process and choose appropriate tools to track changes. The tools must support submission, review, approval, and implementation tracking of change requests. Which combination of tools should the project manager implement?
151A project manager is leading a multinational project with teams in the US, India, and Brazil. The project manager uses a project management tool that includes a dashboard for tracking milestones, tasks, and risks. The tool also has a document repository. During a virtual meeting, the project manager notices that the dashboard shows outdated data because team members are not updating task progress regularly. The project manager needs to improve real-time visibility and ensure accurate reporting. Which action should the project manager take?
152A project manager is managing an IT infrastructure upgrade project. The project plan includes a detailed schedule, resource assignments, and a risk register. The project manager uses a spreadsheet to track risks, but the spreadsheet has become large and difficult to maintain. Team members are not consistently updating risk information, and some risks have been ignored. The project manager wants to adopt a more effective risk management tool that encourages regular updates and provides risk scoring. Which tool should the project manager implement?
153A project manager is overseeing a software development project using Agile methodology. The team uses a physical Kanban board to track tasks, but the project manager is struggling to generate reports for stakeholders who are remote. The team needs to maintain the visual board for daily stand-ups while also having digital access for remote members. The project manager wants to choose a tool that supports both physical and digital boards with synchronization. Which tool should the project manager select?
154A project manager is planning a new software development project. Which tool should the project manager use to break down the project deliverables into smaller, manageable work packages?
155A project sponsor has requested a document that provides a high-level overview of the project, including business need, key assumptions, constraints, and initial risks. Which document should the project manager provide?
156During project execution, two team members disagree on who is responsible for a specific task, leading to delays. Which project document should the project manager consult to resolve this conflict?
157Which TWO of the following are commonly used project scheduling tools? (Select exactly 2.)
158Based on the exhibit, which risk should the project manager address first?
159A project manager at a marketing firm is using Microsoft Project to manage a campaign launch. The project has 15 tasks with several dependencies, including finish-to-start and start-to-start. Team members update their task progress daily. After a week, the project manager notices that some tasks are not reflecting updated finish dates even though dependencies are marked as complete. For example, Task 4 (Design finalization) has a finish-to-start dependency on Task 3 (Concept approval), which was completed three days ago, but Task 4's start date remains unchanged, causing the entire schedule to appear delayed. The project manager has verified that all task links are correctly set in the software. What should the project manager do first?
The Tools and Documentation domain covers the key concepts tested in this area of the PK0-005 exam blueprint published by CompTIA. Courseiva provides free domain-focused practice, mock exams, missed-question review, and readiness tracking across all PK0-005 domains — no account required.
The Courseiva PK0-005 question bank contains 159 questions in the Tools and Documentation domain. Click any question to see the full explanation and answer breakdown.
Start with a 10-question focused session to identify your baseline accuracy in this domain. Read every explanation — even for questions you answer correctly — to understand the reasoning. Once you score consistently above 80%, move to a 20–30 question session to confirm depth before moving to the next domain.
Yes — the session launcher on this page draws questions exclusively from the Tools and Documentation domain. Choose 10, 20, 30, or 50 questions for a focused session, or click individual questions to review them one by one.
Save your results, see per-domain analytics, and get readiness scores — free, for every certification.
Sign Up FreeFree forever · Every certification included