Start 20-question practice test →What this domain covers
What to know about Practices
Practices questions test whether you can apply the concept in context, not just recognise a definition.
How the topic appears in realistic exam-style scenarios.
Which detail in the question changes the correct answer.
How to eliminate plausible but wrong options.
How to connect the question back to the wider exam objective.
Watch out for
Common Practices exam traps
- ▸Answering from memory before reading the full scenario.
- ▸Missing a constraint such as cost, availability, security, scope or command context.
- ▸Choosing a broad answer when the question asks for the most specific fix.
- ▸Ignoring why the wrong options are tempting.
Question index
All Practices questions (158)
Click any question to see the full explanation, or start a practice session above.
A PRINCE2 project is being established across three different geographic regions. The Project Manager needs to define the reporting lines, authority levels, and communication channels for the project team. Which management product should be created or updated to capture this?
Medium2A project plan includes strict sustainability milestones to comply with new environmental regulations. During plan development, the Project Manager needs to ensure that dependencies between environmental audit checkpoints and procurement deliverables are accurately mapped. Which tool/technique supports this within product-based planning?
Hard3When applying product-based planning within the PRINCE2 Plans practice, which TWO of the following steps must be completed before estimating effort and scheduling activities?
Hard4A project manager is developing a Stage Plan using product-based planning. The project includes software development and strict environmental compliance documentation. During the creation of the Product Flow Diagram, the team realizes that the environmental compliance audit must be completed *before* software deployment can be signed off. How is this dependency represented?
Hard5In the PRINCE2 Risk practice, what is the primary difference between a risk and an issue?
Easy6In the PRINCE2 Plans practice, what is the name of the hierarchical structure that breaks down the project into its constituent products?
Easy7A project manager is analyzing a newly identified risk regarding potential supply chain disruption. After assessing its probability and impact, the project manager decides to engage with a key supplier to redesign the component to use locally sourced, sustainable materials instead. Which risk response category does this represent?
Medium8During a project stage boundary, the Executive notices that external market shifts have reduced the projected financial return of the project below the organizational hurdle rate, though the ESG compliance benefits have increased. What is the most appropriate PRINCE2 practitioner action?
Hard9A Team Manager wants to establish how frequently team progress should be reported to the Project Manager. Which report should be set up for this purpose?
Medium10Which THREE of the following are recognized risk response categories for threats within the PRINCE2 Risk practice?
Medium11In the PRINCE2 Quality practice, what is the primary purpose of a quality review meeting?
Easy12A project is developing a sustainable supply chain management system. The Business Case includes both financial ROI and non-financial ESG metrics. Who is ultimately responsible for evaluating and confirming the achievement of these benefits after the project has closed?
Hard13A project is using agile delivery methods within a PRINCE2 framework. The Project Board wants to receive progress updates on product increments rather than lengthy narrative reports. Which PRINCE2 progress reporting product should be tailored to meet this need?
Hard14In the PRINCE2 Issues practice, what is the purpose of an Issue Report?
Easy15An issue has been raised concerning a disagreement between the Senior User and a Supplier regarding product acceptance criteria. What type of issue is this?
Easy16A project is incorporating ESG (Environmental, Social, and Governance) principles. In which practice is the overall sustainability strategy for the project's outputs and outcomes formally documented and justified?
Hard17A team member identifies a variance in project progress where a work package is running two weeks late. According to the Issues practice, what is the immediate first step the Project Manager should take?
Easy18A project has experienced an unforecasted external market shift that drastically reduces the expected financial return, causing the Business Case to become unviable. According to the Business Case practice, what is the proper protocol?
Hard19In the PRINCE2 Issues practice, what is the primary purpose of the Issue Register?
Easy20A project manager is setting up the project governance under the PRINCE2 Organizing practice. The project is financed by an external investor who wants representation on the governing board. Which PRINCE2 Project Board role should this investor typically occupy?
Medium21A newly appointed Project Manager finds that the project organization structure has combined the roles of the Executive and the Project Manager into a single individual to save costs. According to PRINCE2 7, what is the primary risk of this configuration?
Hard22In the PRINCE2 Quality practice, what is the purpose of a Product Description?
Easy23In the PRINCE2 Progress practice, what is the name of the report produced by a Team Manager to inform the Project Manager of team-level progress?
Easy24An organization applies PRINCE2 and uses rolling wave planning within the Plans practice. During Stage 2 execution, the Project Manager begins detailed planning for Stage 3. New environmental regulations come into light that require a complete redesign of Stage 3 deliverables. How should the Plans practice accommodate this?
Hard25An infrastructure project is facing severe delays because local stakeholder groups are protesting potential ecological disruption. The Project Manager needs to review the Business Case to check which component specifically captures the wider environmental and societal consequences.
Medium26In the PRINCE2 Risk practice, what is the name of the log used to capture and maintain information on all identified threats and opportunities?
Easy27Which TWO of the following are true regarding the Quality practice in PRINCE2 7? (Choose two)
Medium28A project manager is recording an uncertainty that could have a positive impact on the project schedule. Where should this uncertainty be logged?
Easy29A Project Manager receives a Request for Change that would increase the project's carbon footprint beyond the target set in the Business Case's sustainability parameters, but it would shorten the schedule by two weeks. The Project Manager checks the project's stage tolerances for time and cost. What is the correct next step?
Hard30A project is utilizing a benefits management approach. According to the Business Case practice, when should the formal Benefits Management Plan be created and baselined?
Hard31In the PRINCE2 Quality practice, what is the term used for the specific characteristics that a product must possess to meet stakeholder expectations and standards?
Easy32During stage execution, a Team Manager realizes that a work package cannot be completed within the agreed time tolerance due to unexpected technical hurdles. What should the Team Manager do according to the Issues practice?
Easy33A project manager is configuring the Progress practice and wants to establish how frequently Team Managers must report progress. Where should this reporting frequency be documented?
Medium34A project is nearing the end of a management stage. The Project Manager has drafted an End Stage Report. Who is responsible for reviewing and approving the End Stage Report?
Medium35A project is developing a new software system. The Project Manager discovers that one of the operational benefits listed in the Business Case will actually occur 12 months *after* the project has officially closed. How should this be handled under PRINCE2 7?
Medium36In PRINCE2, what is the primary purpose of the Progress practice?
Easy37When setting up the Business Case practice, which THREE of the following components should be included in the Business Case document? (Choose three)
Hard38A PRINCE2 project is conducting a formal quality review for a safety-critical engineering component. During the review, a minor defect is found that can be easily corrected within the planned stage time and cost. What is the correct procedure for handling this defect?
Medium39In the PRINCE2 Issues practice, what is the primary purpose of a Request for Change?
Easy40A PRINCE2 project is operating with a Team Manager who discovers that a work package cannot be completed within the agreed time tolerance due to unexpected technical complexity. According to PRINCE2, what is the Team Manager's immediate reporting duty?
Hard41A PRINCE2 project is executing a stage when an unexpected risk event occurs. The risk was previously identified and evaluated as having a medium impact, and a contingency reserve was set aside. The risk materializes, and the contingency reserve is used. How should this be recorded in the Risk Register?
Medium42A project manager wants to ensure that all changes to project baselines are formally controlled. Under which practice is change control managed?
Easy43A PRINCE2 project is implementing an AI system. The risk management team identifies an ethical risk regarding biased algorithmic outputs. The project team decides to implement continuous algorithmic auditing and diverse training datasets. Which risk response is being applied?
Hard44During a PRINCE2 project stage, the Project Manager forecasts that the stage cost will exceed the upper cost tolerance by 5%. According to the Progress practice, what is the mandatory action the Project Manager must take?
Medium45Which TWO of the following reports are used in the Progress practice to communicate status between different levels of management? (Choose two)
Medium46A PRINCE2 project is implementing an enterprise-wide software system. The Project Manager wants to ensure that all business units affected by the change are adequately represented in decision-making and requirements-gathering. Which PRINCE2 practice and governance structure addresses this?
Hard47A project team is implementing an agile delivery approach. The Project Manager is configuring the Plans practice to support iterative product delivery. How should the plans be structured to ensure PRINCE2 governance while allowing agile flexibility?
Hard48A project manager is developing a Business Case and needs to account for the operational costs that will occur after the project is completed and handed over to operations. What PRINCE2 term describes these ongoing costs?
Medium49A PRINCE2 project is executing a stage. The Project Manager discovers that due to an unexpected supply chain bottleneck, the stage will finish 3 weeks late, which breaches the stage time tolerance. The Project Manager prepares an Exception Report and an Exception Plan. Who has the authority to approve the Exception Plan?
Medium50A PRINCE2 project is adopting agile delivery. The Project Board is concerned that product quality might be compromised due to rapid, iterative coding cycles. Which PRINCE2 practice and tool combination should the Project Manager emphasize to reassure the Board?
Hard51A project manager is setting up the project organization. The project involves highly specialized nuclear engineering. The Senior Supplier wants to delegate technical oversight to an external subcontractor. According to PRINCE2, who remains ultimately accountable for the supplier's delivery performance on the Project Board?
Medium52A project is implementing a major transformation. The Business Case includes projected benefits that extend three years beyond the project closure date. According to the Business Case practice, who is accountable for ensuring these post-project benefits are realized?
Hard53In the PRINCE2 Plans practice, what is the primary purpose of a Project Plan?
Easy54In organizing a PRINCE2 project, the Project Manager needs to ensure that supplier personnel adhere to the project's quality and sustainability standards. Where should these supplier responsibilities and governance requirements be formally established?
Medium55A project risk has been identified regarding potential supply chain delays for sustainable materials. The Project Manager wants to assign ownership for investigating and monitoring this specific risk. Who should be assigned as the risk owner?
Medium56A project is using an agile delivery method within a PRINCE2 governance framework. The Project Board wants to ensure that delivery increments are meeting quality standards before acceptance. Who is responsible for formally accepting completed products on behalf of the user community?
Hard57In the PRINCE2 Quality practice, what is the purpose of establishing a Quality Register?
Easy58A PRINCE2 project is structured with multiple delivery teams operating under different Team Managers. One Team Manager consistently fails to provide Checkpoint Reports on time, blinding the Project Manager to potential schedule slippages. According to the Progress practice, what is the best governance remedy?
Hard59Which TWO of the following statements correctly describe the responsibilities of the Executive within the PRINCE2 Business Case and Organizing practices?
Medium60Which TWO of the following statements correctly describe the relationship between tolerances and reporting in the PRINCE2 Progress practice?
Hard61In the Quality practice, who is responsible for approving the Quality Management Approach and setting overall quality expectations?
Easy62During a quality review for a sustainable packaging prototype, the review team identifies that the material supplier's carbon footprint verification certificate is missing. According to the PRINCE2 Quality practice, what should happen to the product status?
Hard63A project is implementing product-based planning. The Project Manager has created a Product Breakdown Structure. What is the next logical step in product-based planning?
Medium64A project introduces a risk where a new software tool might fail to comply with upcoming environmental electronic waste regulations (ESG integration). The Project Manager wants to apply a response that transfers the financial impact of this risk. Which response is best suited?
Hard65A PRINCE2 project includes an environmental sustainability risk: excessive waste during manufacturing. The project team identifies an opportunity: partnering with a local recycling startup could turn this waste into a secondary revenue stream. Which risk response is most appropriate for this opportunity?
Hard66A project manager is preparing a stage plan. To ensure that quality reviews are properly scheduled, what must be integrated into the schedule alongside technical task activities?
Medium67An organization is executing a multi-year transformation project under PRINCE2 7. The corporate strategy shifts, placing a massive new emphasis on net-zero carbon targets. The Executive reviews the project's Business Case and realizes the project's outputs no longer align with the new strategic mandate, although the project is on time and under budget. What is the mandatory PRINCE2 action?
Hard68A PRINCE2 project is executing a stage. The Project Manager discovers that a supplier has delivered software that contains undocumented open-source components, violating corporate security and licensing standards. How should this be classified and handled?
Medium69Under the PRINCE2 Organizing practice, which role represents the interests of those who will use the project's outputs, operate the resulting solution, or realize the benefits?
Easy70A PRINCE2 project is executing a stage. The Project Manager wants to establish how frequently Highlight Reports will be submitted to the Project Board. Where should this reporting frequency be formally defined?
Medium71Which TWO of the following describe valid aspects of the Issues practice in PRINCE2 7? (Choose two)
Medium72A PRINCE2 project is operating with decentralized agile delivery teams. An issue arises where two teams have conflicting dependencies on a shared database component, threatening the stage schedule. The Team Managers cannot resolve it between themselves. What is the correct escalation path under PRINCE2?
Hard73When implementing the Risk practice in a PRINCE2 7 project, which THREE of the following steps are part of the risk management procedure? (Choose three)
Hard74Which TWO of the following documents are core management products produced during the Initiating a Project process to establish project baselines?
Easy75Which THREE of the following management products are part of the PRINCE2 Quality practice framework?
Hard76Which PRINCE2 practice focuses on defining *how*, *when*, and *by whom* a project's products will be created, verified, and controlled?
Easy77A PRINCE2 project is executing its final stage. During the Closing a Project process, the Project Manager prepares the End Project Report. A key stakeholder demands that the project remain open for another three months to support post-project user adoption. According to PRINCE2, how should this be handled?
Hard78A PRINCE2 project is operating with time and cost tolerances set at +/- 5%. Halfway through Stage 2, a major disruption occurs. The Project Manager forecasts a cost overrun of 8% and a schedule delay of 10%. What governance procedure is triggered?
Hard79A project manager receives an urgent request from a Senior User to add a new feature that was not in the original Project Product Description. The feature requires minor effort and fits within the stage cost tolerance. How should this request be handled?
Medium80When establishing project roles in the Organizing practice, why is it recommended that the Executive and the Project Manager roles not be held by the same person?
Easy81A project is subject to strict ESG reporting requirements. The Project Board needs assurance that the project's sustainability benefits are being accurately measured and reported. Who should provide independent assurance of these benefits?
Hard82A PRINCE2 project is implementing a sustainable manufacturing plant. The Project Manager needs to ensure that the project's progress tracking mechanisms include metrics for both financial expenditure and environmental resource consumption. How should the Progress practice be tailored?
Medium83A PRINCE2 project is subject to strict environmental regulations. The Quality Manager wants to ensure that all deliverables undergo regulatory compliance testing before being presented to the user. Where should these regulatory testing requirements be documented?
Medium84In the PRINCE2 Business Case practice, what term describes the measurable improvement resulting from an outcome perceived as an advantage by one or more stakeholders?
Easy85A PRINCE2 project is utilizing a stage-gate approach. At the end of Stage 2, the Project Board meets to review the End Stage Report and the updated Business Case before authorizing Stage 3. What PRINCE2 principle is primarily demonstrated by this activity?
Medium86Which TWO of the following statements correctly describe the purpose and content of the Benefits Management Approach?
Medium87A project manager is configuring the Progress practice for a high-risk project. The Project Board wants to ensure that management by exception is fully operational. Which parameter must be explicitly agreed upon between the Project Board and Corporate Management to establish the Project Board's authority?
Hard88During project initiation, the Project Manager is defining the project's management products. Which practice governs the creation of the Project Product Description?
Medium89During risk identification in a PRINCE2 project, the team identifies a risk where a key supplier might fail to meet sustainability targets, leading to reputational damage. The team decides to establish joint monitoring committees and share best practices with the supplier to help them succeed. Which risk response category is this?
Hard90Which document is created during the Initiating a Project process to define the mechanisms for measuring whether the project's expected outcomes have been achieved post-project?
Easy91A project is being set up in a matrix organization where resources are shared across multiple operational lines. Under the Organizing practice, what document should be created to define the communication channels, reporting lines, and stakeholder responsibilities?
Easy92In the PRINCE2 Organizing practice, what is the purpose of the Project Brief?
Easy93During a project stage, a major regulatory change occurs that mandates an immediate alteration to the project's design standards to meet new environmental laws (ESG). The Project Manager assesses that this will breach cost and time stage tolerances. What should the Project Manager do?
Hard94An organization is applying PRINCE2 7 to a complex transformation program. The Executive realizes that the project's benefits realization schedule has drifted by 6 months due to operational delays in adopting the new systems. Who is accountable for ensuring that the Benefits Management Approach is executed post-project?
Hard95When integrating sustainability and ESG into the PRINCE2 Organizing and Plans practices, which TWO of the following practices must be tailored to ensure compliance?
Hard96A Team Manager realizes that a delivered product component does not meet the quality criteria specified in its Product Description, but the deviation is minor and could potentially be accepted as-is. Under PRINCE2, how should this be logged?
Medium97A PRINCE2 project is evaluating a risk where a critical raw material might become unavailable due to geopolitical tensions. The project team identifies an alternative recycled material that eliminates the dependency on the imported material. Which risk response category is this?
Medium98Which THREE of the following are categorized as formal 'issues' under the PRINCE2 Issues practice?
Medium99Which TWO of the following statements correctly describe the role of Project Assurance in PRINCE2?
Easy100A PRINCE2 project is nearing its final stage. The Project Manager discovers that due to cumulative minor scope creep, the final product will fail to deliver one of the minor non-mandatory benefits listed in the Benefits Management Approach. The Executive agrees that the project can still close successfully. How should this be handled in the End Project Report?
Hard101In the PRINCE2 Issues practice, what is the name of the log used to record all informal day-to-day notes, thoughts, and events by the Project Manager?
Easy102Which THREE of the following roles are mandatory members of the Project Board in PRINCE2 7? (Choose three)
Hard103Which TWO of the following are valid responsibilities of the Executive in PRINCE2 7? (Choose two)
Medium104A PRINCE2 project is developing a medical device. The quality control process requires an independent review of the device's manufacturing safety standards against ISO requirements. What PRINCE2 term best describes this planned, independent examination?
Medium105An organization is launching a project to upgrade its IT infrastructure. As part of the Organizing practice, who represents the interests of those who will operate and maintain the IT infrastructure after project closure?
Easy106During a management stage, actual costs are tracking close to the cost tolerance limit. The Project Manager wants to understand how progress is reported and controlled. Which report does the Project Manager submit periodically to the Project Board to summarize progress against tolerances?
Medium107During a stage, a supplier identifies an opportunity to deliver a component faster by using a modular pre-fabrication method that also reduces construction waste on site (ESG). How should this opportunity be evaluated and managed?
Medium108A project manager is drafting the initial Business Case for a sustainable energy transition project. According to PRINCE2 7th Edition, which role is primarily accountable for ensuring that the Business Case remains viable throughout the project lifecycle?
Easy109A PRINCE2 project is executing its final management stage. The Project Manager is preparing the End Stage Report and notices that cumulative stage tolerances were slightly exceeded, but an Exception Plan was already approved by the Project Board for this final stage. How should the End Stage Report reflect this?
Medium110A project manager is setting up the Risk practice. They want to ensure that risks are evaluated not just by probability and impact, but also by how quickly a risk might materialize. Which risk attribute should be used to capture this time dimension?
Medium111Which THREE of the following elements are typically documented within a Product Description in PRINCE2?
Medium112During project monitoring, the Project Manager notes that cumulative expenditure is trending outside the stage cost tolerance. According to the Progress practice, what action must the Project Manager take immediately?
Medium113Which TWO of the following statements correctly reflect how PRINCE2 7 treats the integration of sustainability and ESG across the practices?
Hard114A project is initiating, and the Project Manager needs to document how risks will be identified, assessed, and controlled throughout the project lifecycle. Which document should be created?
Easy115A project is experiencing severe scope creep and resource shortages. The Project Board wants to ensure that the project management team is properly structured to maintain accountability. According to the Organizing practice in PRINCE2 7, which role is specifically accountable for designing and appointing the project management team?
Medium116When integrating sustainability and ESG into the Business Case practice, which THREE of the following factors should typically be evaluated? (Choose three)
Hard117In the PRINCE2 Organizing practice, what is the primary role of Project Assurance?
Easy118Which THREE of the following management products are produced during the Managing a Stage Boundary process to support progress governance?
Medium119When integrating sustainability and ESG into the PRINCE2 Business Case practice, which THREE of the following are valid examples of evaluating the Triple Bottom Line?
Hard120A project is utilizing an iterative delivery approach. The Project Manager is establishing plans for the upcoming management stage. How should product dependencies be documented when planning iterative increments?
Hard121In the PRINCE2 Business Case practice, what is the document that records the justification for undertaking a project based on estimated costs, benefits, risks, and ESG impacts?
Easy122In the PRINCE2 Progress practice, what mechanism is used to establish the limits of authority delegated by the Project Board to the Project Manager?
Easy123Which THREE of the following are valid methods or tools used in the PRINCE2 Plans practice for product-based planning?
Medium124A project manager is preparing the Business Case for a public infrastructure project. In accordance with PRINCE2 7, the organization mandates that all projects evaluate the 'Governance' (G) pillar of ESG. Which element should be included in the Business Case to satisfy this requirement?
Medium125Which THREE of the following elements are typically contained within a well-constructed Product Description in PRINCE2 7? (Choose three)
Hard126In the PRINCE2 Quality practice, what is the name of the management product that specifies the quality techniques, standards, responsibilities, and control mechanisms to be applied across the project?
Easy127Which THREE of the following are recognized risk response categories for threats in PRINCE2 7? (Choose three)
Hard128A project is implementing a sustainable energy grid. During execution, a major risk event occurs where a key supplier goes bankrupt. The Project Manager reviews the Risk Register and finds that no response was planned for this severe threat. According to PRINCE2 7, what immediate action should be taken regarding risk management?
Hard129When integrating sustainability and ESG into the PRINCE2 Business Case practice, which factor represents the 'Social' (S) pillar?
Easy130During planning, the Project Manager is breaking down the product deliverables using product-based planning. Which PRINCE2 7 product-based planning step identifies the dependencies between products?
Medium131When managing risks within the PRINCE2 Risk practice, which THREE of the following actions are associated with responding to opportunities (positive risks)?
Hard132A PRINCE2 project is planning a complex engineering stage. The Project Manager needs to estimate the effort and resource requirements for creating each product. Which practice and planning technique should be utilized?
Medium133Which TWO of the following documents are produced during the Planning practice in PRINCE2 7? (Choose two)
Medium134A PRINCE2 project is being set up in a matrix organization where resources are shared across multiple operational lines. The Project Manager needs to negotiate resource availability with functional managers. Where should the authority and channels for this negotiation be established?
Medium135Which TWO of the following roles form the core representation on a PRINCE2 Project Board alongside the Executive?
Easy136A project is utilizing a hybrid delivery approach where initial stages are managed via traditional plans, but later delivery increments use iterative product delivery. The Project Manager is establishing the Plans practice. Which plan type must be maintained as a rolling wave plan throughout the project lifecycle?
Hard137An organization requires all projects to apply the PRINCE2 Plans practice. A project manager is developing a Stage Plan for a complex software release. The project uses agile delivery for development but traditional gating for governance. How should the Plans practice be tailored?
Hard138An organization is executing multiple concurrent projects. The portfolio office realizes that two projects have conflicting resource demands and overlapping sustainability targets, threatening the strategic alignment. Which PRINCE2 practice provides the framework to resolve this at the organizational level?
Hard139A project manager is evaluating a risk with a high probability and severe negative impact on the project schedule. The organization decides to take out a specialized completion guarantee insurance policy with a third party. Which risk response is being applied?
Medium140In the PRINCE2 Issues practice, what are the three types of issues recognized by the method?
Easy141A project is being established. Under the Organizing practice, what document defines the structure of the project management team and outlines who reports to whom?
Easy142A project board is reviewing a stage plan. They notice that the plan does not contain any quality review milestones or independent quality checks. Which practice guideline has been violated?
Medium143During project initiation, the Project Manager discovers that the Business Case benefits are not aligned with the corporate sustainability policy, which mandates a reduction in carbon emissions. What is the most appropriate action according to PRINCE2 7?
Easy144In the PRINCE2 Progress practice, what is the primary purpose of a Highlight Report?
Easy145In the Quality practice, who is responsible for defining the customer's quality expectations and acceptance criteria?
Easy146A PRINCE2 project is executing a stage plan. The Project Manager wants to schedule a quality review for a critical deliverable. According to the Quality practice, who should normally chair the quality review meeting?
Medium147A project is implementing a new cloud platform. The Project Manager identifies a threat that a new data privacy regulation might be enacted during the project, which would halt deployment. The team decides to redesign the database architecture immediately to comply with the proposed regulation in advance. Which risk response category does this represent?
Medium148When applying product-based planning within the PRINCE2 Plans practice, what is the correct sequence of steps a project manager should follow?
Medium149Which TWO of the following statements about tolerances in the Progress practice are correct? (Choose two)
Medium150When establishing the Business Case practice in PRINCE2 7, what is the primary purpose of the 'Return on Investment' (ROI) calculation?
Easy151A project is implementing a major organizational transformation. The risk management team identifies a severe cultural resistance threat from middle management. The organization decides to appoint change champions across all departments and redesign performance incentives to align with the new vision. Which risk response is being implemented?
Hard152A project is subjected to a quality audit. The auditor notes that a product was signed off without checking one of the mandatory quality criteria specified in its Product Description. According to the Quality practice, what is the appropriate corrective action?
Hard153A PRINCE2 project includes a high-risk vendor supplying critical software modules. The Project Manager wants to ensure that the vendor's quality management processes align with the project's quality approach. Where should this integration be formally documented and controlled?
Hard154A project is operating under a commercial contract where the supplier is incentivized to deliver early. However, early delivery increases environmental resource consumption (ESG trade-off). The Project Board needs to evaluate this trade-off. Which practice is primarily responsible for balancing benefits, dis-benefits, and costs?
Hard155During project execution, an issue arises regarding a conflict between two functional managers over resource availability. The Project Manager logs the issue, analyzes its impact, and realizes it breaches the stage cost tolerance due to contractor overtime required to make up for lost time. What is the correct governance action?
Hard156A project is undertaking product-based planning. The Project Manager has identified all products and their dependencies. What is the final artifact produced as a result of the Planning practice's product-based planning steps?
Medium157During a quality audit, it is discovered that a product was accepted by the Senior User despite failing one of its quality criteria due to an oversight. How should this be handled within the Quality practice?
Medium158An organization is executing a high-risk engineering project under PRINCE2 7. The Executive wants to bypass the stage boundary reviews to speed up delivery, arguing that the Business Case is solid. According to PRINCE2, what is the impact of removing management stages?
HardOther domains
All PRINCE2-PRACTITIONER exam domains
Frequently asked questions
- What does the Practices domain cover on the PRINCE2-PRACTITIONER exam?
- Practices questions test whether you can apply the concept in context, not just recognise a definition.
- How many questions are in this domain?
- This page lists all 158 Practices questions in the PRINCE2-PRACTITIONER question bank. The actual exam draws from this domain proportionally to its weighting in the official exam blueprint.
- What is the best way to practise this domain?
- Start with a short focused session (10 questions) to identify gaps, then work through explanations. Repeat with a longer session once the weak areas feel solid.
- Can I practise only Practices questions?
- Yes — the session launcher on this page filters questions to this domain only. Choose any session length for inline explanations and scoring.