PK0-005 Project Life Cycle Practice Question

A project manager is creating a Work Breakdown Structure (WBS). Which technique is used to break down deliverables into smaller, manageable components?

⚠ Common exam trap

PK0-005 often tests the distinction between WBS creation techniques and estimation/scheduling techniques; the trap is selecting 'bottom-up estimating' or 'rolling wave planning' because they sound like breakdown methods, when only decomposition produces the WBS hierarchy.

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

✓

Decomposition

Decomposition is the technique used to break down project deliverables into smaller, more manageable components, ultimately producing work packages at the lowest level of the WBS. It involves subdividing scope and deliverables into progressively finer levels until the work can be estimated, scheduled, and assigned. This is the core technique of the Create WBS process.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • ✓

    Decomposition

    Why this is correct

    Decomposition subdivides project deliverables into progressively smaller, manageable work packages, satisfying the WBS constraint of hierarchical breakdown. It is the specific technique that transforms top-level deliverables into assignable, estimable components at the lowest WBS level.

  • ✗

    Bottom-up estimating

    Why it's wrong here

    Bottom-up estimating aggregates cost or duration estimates from the lowest-level components upward; it consumes an existing decomposition rather than creating one. It is tempting because it also works at detailed component level, but it would be correct when deriving a total project estimate after the Work Breakdown Structure already exists.

  • ✗

    Precedence diagramming

    Why it's wrong here

    Precedence diagramming sequences activities and maps dependencies, producing a network diagram rather than decomposing scope. It is tempting because it also structures project work, but it would be the right technique when scheduling activities and identifying the critical path, not when breaking deliverables into manageable components.

  • ✗

    Rolling wave planning

    Why it's wrong here

    Rolling wave planning progressively elaborates work packages only for the near-term horizon, deferring detail for later phases. It is tempting because it also concerns decomposition, but it would be correct when detailed planning must be deferred, not when fully decomposing deliverables into manageable components during Work Breakdown Structure creation.

About these practice questions

This PK0-005 question is part of Courseiva's 954-question bank — original exam-style content with full explanations and wrong-answer analysis, never real exam questions or exam dumps. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

JA

Written and reviewed by Johnson Ajibi, MSc IT Security

Senior Network & Security Engineer · founder of Courseiva

Last reviewed September 2026 · checked against the official CompTIA exam blueprint

This PK0-005 practice question is part of Courseiva's free CompTIA certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the PK0-005 exam.