Map each of the seven processes to its triggering event, owning role, and management products, then verify which process updates which product. The critical skill is matching Starting up a Project, Initiating a Project, and Closing a Project to their exact outputs.
Start practicing
PRINCE2 Processes — choose a session length
Free · No account required
Domain overview
The PRINCE2 Processes domain covers the seven processes that structure a project from Starting up a Project through Closing a Project. Foundation questions test when each process is triggered, which roles own its activities, and which management products it produces or updates, often via scenario stems asking what happens next or which process an activity belongs to.
Exam objectives
Sequencing the seven processes and their trigger points across the project lifecycle
Matching activities to the correct process, such as Authorise a Stage or Project
Identifying which management products each process creates, updates or reviews
Knowing which roles are responsible for activities within each process
Confusing the Starting up a Project process with Initiating a Project, since both occur during pre-project preparation.
Assuming Directing a Project is a day-to-day process rather than the board's decision-making process across the whole project.
Mixing up Managing a Stage Boundary with Closing a Project, since both produce an End Stage Report and follow similar activity patterns.
Click any question to see the full explanation and answer options, or start a focused practice session above.
A project is in the Controlling a Stage process. The project manager receives a request from a team manager to change the design specification because of a technical difficulty. The change would not affect the stage plan or the business case. What should the project manager do first?
2A project manager is closing a project using the Closing a Project process. The project has delivered all products, but the business case has not been fully realized because the expected benefits will take longer to materialize. What should the project manager do with the Benefits Management Approach?
3Which THREE activities are part of the Initiating a Project process?
4Refer to the exhibit. A project has just completed the Starting up a Project process and received authorization to initiate. Which process should the project manager execute next?
5Refer to the exhibit. The project board is reviewing the End Stage Report for Stage 2 and the Stage Plan for Stage 3. The Stage Plan for Stage 3 exceeds the agreed cost tolerance. According to PRINCE2, what should the project board do?
6During the Initiating a Project process, the project manager is reviewing the Business Case. Which statement best describes the purpose of this review?
7A project is underway, and the project manager notices that the team is frequently re-prioritizing work and losing focus. Which PRINCE2 process should the project manager use to re-establish control?
8A project manager is preparing the End Stage Report for the second stage. The project's planned budget for the stage is $500,000, but actual costs are $520,000. The project board is concerned about cost overrun. What is the most appropriate action for the project manager?
9A project team is about to begin the first stage of a project. The project board has approved the project initiation documentation. Which process should be used to authorize the work?
10Which TWO activities are part of the Closing a Project process?
11Refer to the exhibit. PRINCE2 Configuration Item Record Item ID: CI-103 Product: User Authentication Module Version: 2.1 Status: Under Development Baseline: 2.0 Last Review: 2024-01-15 Owner: Project Support Office Issue: The team reports that the latest version (2.1) has a critical defect. The status is 'Under Development' but the baseline is still 2.0. What process should the project manager follow?
12You are the project manager for a software development project following PRINCE2. The project is in its second stage, which has a budget tolerance of 10% above the planned cost of $200,000. The project board is composed of the executive, senior user, and senior supplier. The team has been working on a critical feature, but a key supplier has announced a 15% price increase for their services, effective immediately. This increase will push the stage costs to $230,000, exceeding the tolerance. The project manager must decide the best course of action. Which option should the project manager take?
13You are the project manager for a construction project. The project is in the Initiating a Project process. The project board has approved the project brief, and you are now developing the project initiation documentation (PID). During this process, you identify that the project's business case is no longer viable due to a change in market conditions. What is the most appropriate action?
14A project manager is initiating a project using PRINCE2. The project board has approved the project mandate, but the project manager is unsure about the next step. Which process should be executed first?
15Drag and drop the steps to manage a configuration item in PRINCE2 into the correct order.
16Match each PRINCE2 technique to its description.
17Which process is responsible for creating the Project Brief?
18Who is responsible for authorizing the initiation of a project?
19A project is in the Initiating a Project process. Which document is the key output that defines how the project will be managed?
20During the Controlling a Stage process, which report does the Project Manager send to the Project Board?
21A Team Manager has completed the work assigned in a Work Package. Which process is used to deliver the completed products back to the Project Manager?
22What is the primary difference between Starting Up a Project (SU) and Initiating a Project (IP)?
23During the Managing a Stage Boundary process, the Project Manager produces an End Stage Report. What is the purpose of this report?
24The Project Manager identifies that the project's approved Business Case is no longer viable. Which process should the Project Manager use to escalate this?
25Which process ensures that the project's products are formally handed over and the project is closed in a controlled way?
26In the Directing a Project process, the Project Board authorizes an Exception Plan. What triggers the need for an Exception Plan?
27A Team Manager sends a Checkpoint Report to the Project Manager. Which process is the Team Manager executing?
28Which TWO of the following are outputs of the Initiating a Project process?
29Which THREE of the following are responsibilities of the Project Board in the Directing a Project process?
30Which TWO of the following are purposes of the Managing Product Delivery process?
31Which process is responsible for authorizing the initiation of a project?
32Who is responsible for producing Checkpoint Reports?
33The Project Board has requested a report summarizing the current stage performance and the plan for the next stage. Which process should the Project Manager use?
34During the Managing Product Delivery process, a Team Manager discovers that a product cannot meet its quality criteria without significant extra work. What should the Team Manager do?
35In the Closing a Project process, which document confirms that the project's products have been accepted?
36Which process includes the activity 'Authorize Work Packages'?
37Which THREE of the following are activities performed in the Controlling a Stage process?
38According to PRINCE2, which process is responsible for ensuring that the project has a clear and agreed start before any substantial work is undertaken?
39During the Controlling a Stage process, the Project Manager receives a Checkpoint Report. Who prepared this report?
40Which process is the Project Board primarily responsible for, according to PRINCE2?
41The Project Manager has produced an End Stage Report for the current stage. According to PRINCE2, what is the next step?
42What is the purpose of the Closing a Project process?
43During which process are Work Packages authorised by the Project Manager?
44Who is responsible for producing the Lessons Report at the end of the project?
45Which process is the first to be executed in a PRINCE2 project?
46The Project Board has received an Exception Report from the Project Manager. What is the Project Board's next step?
47What is the primary difference between Managing Product Delivery and Controlling a Stage?
48Which TWO of the following are outputs of the Starting Up a Project process?
49Which THREE of the following are activities performed during the Directing a Project process?
50Who is responsible for producing the Highlight Report during the Controlling a Stage process?
51During the Managing Product Delivery process, who produces the Checkpoint Report?
52What is the difference between Starting Up a Project and Initiating a Project?
53In which process are End Stage Reports produced?
54A Team Manager identifies a quality problem in a product that is being delivered. What should the Team Manager do?
55Who is responsible for approving the End Project Report?
56During the Controlling a Stage process, the Project Manager receives a Checkpoint Report from a Team Manager. What is the primary purpose of this report?
57Which process is used by the Project Board to authorise the start of a new stage?
58What is the difference between the Starting Up a Project (SU) and Initiating a Project (IP) processes?
59Which role produces Highlight Reports?
60Which process is responsible for ensuring that products meet their quality criteria before acceptance?
61Which TWO of the following are activities performed in the Managing a Stage Boundary process?
62A Project Manager is preparing the Project Initiation Documentation. In which process is this work done?
63During the Controlling a Stage process, the Project Manager receives a Highlight Report from a Team Manager. What should the Project Manager do with this information?
64A Project Manager is managing a stage and receives a request from a Team Manager to authorize a Work Package that is part of the current Stage Plan. Which process is the Project Manager performing?
65The Project Board is reviewing an Exception Plan submitted by the Project Manager. Which process is the Project Board performing?
66Which output is produced during the Starting Up a Project process?
67A project is in its final stage. The Project Manager has verified that all products have been accepted and operational support is in place. Which process should the Project Manager initiate next?
68During the Managing a Stage Boundary process, the Project Manager produces an End Stage Report. What is the primary purpose of this report?
69The Project Board wants to provide ad-hoc direction to the Project Manager regarding a critical issue. Which process should the Project Board use?
70A Project Manager is planning the next stage and updates the Project Plan. In which process is this activity performed?
71Which TWO of the following are produced during the Initiating a Project process?
72Which THREE of the following are responsibilities of the Project Manager during the Controlling a Stage process?
73Which process is responsible for producing the Project Brief?
74During which process does the Project Manager produce an Exception Plan?
75In the Managing Product Delivery process, who produces Checkpoint Reports?
76A project manager is reviewing progress and identifies a product that does not meet its quality criteria. What should the project manager do?
77Which process covers the day-to-day management of a stage by the Project Manager?
78During which process does the Project Board give ad-hoc direction to the Project Manager?
79In the Controlling a Stage process, which document does the Project Manager send to the Project Board to report progress?
80A project is in the Managing a Stage Boundary process. The Project Manager has produced an End Stage Report. What else must be produced?
81Which TWO of the following are purposes of the Controlling a Stage process?
82Which process is used by the Project Manager to authorize work for a Team Manager?
83During the Managing Product Delivery process, a Team Manager identifies a quality issue that will delay the delivery of a Work Package. What should the Team Manager do?
84Which process produces the End Project Report?
85A Project Manager is planning the next stage. Which process provides the mechanism for the Project Board to review progress and authorize the next stage?
86Who is responsible for producing the Highlight Report?
87What is the first process in PRINCE2?
88The Project Board has authorized the project and the first stage. Which process is used by the Project Manager to manage the work of the first stage?
89What is the difference between the Starting Up a Project process and the Initiating a Project process?
90Which process is triggered when a Stage Plan's tolerances are forecast to be exceeded?
91Which process is responsible for the project board giving ad-hoc direction to the project manager?
92During the Managing a Stage Boundary process, the project manager produces an End Stage Report. Who receives this report and what decision do they make?
93A project is in the delivery stage. The team manager has accepted a work package. Which process governs the team manager's work in delivering the products?
94Which process ensures that the project's products are formally handed over to the operational environment?
95In the Directing a Project process, when does the project board authorize the project?
96During the Controlling a Stage process, the project manager receives a Checkpoint Report from the team manager. What is the primary purpose of this report?
97In the Starting Up a Project process, the project manager is appointed. Who appoints the project manager?
98Which process is responsible for producing the End Project Report?
99Which THREE of the following are activities performed during the Managing a Stage Boundary process?
100Which TWO of the following are responsibilities of the Project Board in the Directing a Project process?
101Which process is used by the Project Manager to assign work to the Team Manager?
102In which process does the Project Board authorize an Exception Plan?
103Which document is produced in the Initiating a Project process and provides a baseline for the project?
104During the Managing Product Delivery process, what does the Team Manager produce to inform the Project Manager of progress?
105What is the key difference between the Starting Up a Project process and the Initiating a Project process?
106Who is responsible for reviewing the End Stage Report and deciding whether to authorize the next stage?
107Which process provides the Project Board with information needed to evaluate the project's ongoing viability at the end of each stage?
108A Work Package has been authorized, but the Team Manager discovers that the work will require more effort than estimated. The tolerance for the Work Package is insufficient. What should the Team Manager do?
109In which process is the Benefits Management Approach first created?
110Which PRINCE2 process produces the Project Initiation Documentation (PID)?
111Who is responsible for authorising the start of a project in PRINCE2?
112During which process does the Project Manager produce a Highlight Report for the Project Board?
113The Project Manager has identified an issue that could cause a delay in the current stage. The issue cannot be resolved within the stage's tolerance. What should the Project Manager do?
114Which process includes the activity 'Assembling the Project Initiation Documentation'?
115Which process is responsible for authorising the initiation of a project?
116What is the difference between a Checkpoint Report and a Highlight Report in PRINCE2?
117During the Controlling a Stage process, who is responsible for producing Checkpoint Reports?
118In which process does the Project Manager prepare an Exception Plan?
119What is the key difference between the Starting Up a Project (SU) and Initiating a Project (IP) processes?
120A project is forecast to exceed its stage cost tolerance. What is the Project Manager's first action?
121Which process is responsible for ensuring that the project does not proceed until the Project Board has authorized the initiation?
122During the Closing a Project process, what is the purpose of the End Project Report?
123In which process does the Project Board decide whether to authorise an Exception Plan?
124In the Managing Product Delivery process, who produces the Checkpoint Report?
125Which process is triggered when the Project Manager needs to escalate an exception to the Project Board?
126What is the purpose of the Managing Product Delivery process?
127Which TWO of the following activities are performed in the Starting Up a Project process?
128During the Closing a Project process, which document is produced to capture lessons for future projects?
129Which process is responsible for authorising the project's closure?
130Which THREE of the following are responsibilities of the Project Board during the Directing a Project process?
131During which process are the Benefits Management Approach and the Project Plan created?
132Who is responsible for producing the End Stage Report?
133What is the difference between a Highlight Report and an Exception Report?
134A project is in the Initiating a Project process. Which document describes how changes to baselined products will be managed?
135During the Controlling a Stage process, the Project Manager needs to assign work to a team. What should the Project Manager create?
136In which process is the End Stage Report produced?
137During the Managing Product Delivery process, the Team Manager completes a product. What should happen next?
138Which process is responsible for authorizing work to be done within a stage?
139When should the Project Manager escalate an issue to the Project Board?
140The Project Board is considering whether to authorize the next stage. Which document provides the information needed for this decision?
141During the Managing Product Delivery process, the Team Manager identifies a problem that could affect the quality of a product. What should the Team Manager do?
142Which process ensures that the project's products are formally accepted and the project is closed in a controlled way?
143A Project Manager receives a Checkpoint Report from a Team Manager. In which process does this occur?
144The Project Board authorizes an Exception Plan. In which process does the Project Manager produce the Exception Plan?
145Which TWO outputs are produced during the Initiating a Project process?
146A project is in the Managing a Stage Boundary process. Which of the following is produced during this process?
147Which process is responsible for authorizing a Work Package?
148During the Initiating a Project process, which document is the key output that defines how the project will be managed?
149A project is forecast to exceed its stage cost tolerance. The Project Manager has raised an Exception Report. Which process does the Project Board use to decide how to respond?
150Which process is used by the Project Board to authorize the next stage of a project?
151The Project Board has authorized a Stage Plan. During the stage, the Project Manager identifies a risk that could cause the stage to exceed its time tolerance. What should the Project Manager do first?
152Which process is used by the Project Board to oversee the entire project?
153Which of the following is an output of the Directing a Project process?
154A team is working on a Work Package. The Team Manager needs to report progress to the Project Manager. Which report should be used?
155A project is in the Closing a Project process. Which of the following is a required activity before the Project Board can authorize closure?
156Which TWO of the following are produced during the Managing a Stage Boundary process?
157What is the purpose of the Starting Up a Project (SU) process?
158In which process is the Project Manager appointed?
159During the Controlling a Stage process, the Project Manager receives a Checkpoint Report from the Team Manager. What should the Project Manager do with this report?
160A Work Package has been completed and the products have passed quality checks. What should the Team Manager do next in the Managing Product Delivery process?
161In the Managing Product Delivery process, who is responsible for producing Checkpoint Reports?
162What is the difference between the Starting Up a Project (SU) process and the Initiating a Project (IP) process?
163During the Controlling a Stage process, who receives the Highlight Report?
164Which process is used by the Project Manager to prepare the End Stage Report and the next Stage Plan?
165During the Directing a Project process, the Project Board receives an Exception Report. What action should the Project Board take?
166Which process ensures that products are delivered according to the Work Package requirements?
167Who is responsible for ensuring that project assurance is independent of the Project Manager?
168A project manager is planning the next stage. Which process should they use to produce the next Stage Plan and an End Stage Report?
169What is the primary purpose of the Managing Product Delivery process?
170During the Initiating a Project process, which document details how quality will be managed on the project?
171The Project Board gives ad-hoc direction during which process?
172Which process includes the activity 'Authorize a Work Package'?
173Which THREE of the following are activities performed in the Closing a Project process?
174Which THREE activities are part of the Controlling a Stage process?
175Which TWO documents are produced during the Closing a Project process?
176During which process does the Project Manager produce a Highlight Report?
177During the Controlling a Stage process, the Project Manager receives a Checkpoint Report showing that a Work Package is behind schedule. What should the Project Manager do first?
178Who produces Checkpoint Reports?
179What is the difference between Starting Up a Project (SU) and Initiating a Project (IP)?
180A project is nearing the end of its final stage. The Project Manager has prepared the End Project Report and a Lessons Report. Which process is responsible for authorising the project closure?
181A project is in the Managing Product Delivery process. A team member identifies a quality issue with a product being developed. Who is responsible for producing a Checkpoint Report?
182Which document is produced in the Starting Up a Project process and is used as input to Initiating a Project?
183Who is responsible for authorizing a Work Package?
184In the Managing a Stage Boundary process, the Project Manager updates the Project Plan. What is the main purpose of this update?
185Who is responsible for authorising the initiation of a project?
186In the Controlling a Stage process, the Project Manager receives a Checkpoint Report indicating that a work package is behind schedule. What should the Project Manager do first?
187During the Closing a Project process, what must be produced to confirm that the project has delivered what was expected?
188Which process does the Project Board use to give ad-hoc direction to the project?
189During which process is the Benefits Management Approach first produced?
190Which process is used by the Project Board to give ad-hoc direction to the project?
191Which THREE of the following are responsibilities of the Project Manager during the Controlling a Stage process?
192Which process is responsible for appointing the Executive and the Project Manager?
193During which process does the Project Board authorize the project to proceed?
194In which process are Highlight Reports produced and sent to the Project Board?
195Which of the following is a key output of the Managing a Stage Boundary process?
196In the Closing a Project process, what is the Project Board's responsibility?
197Which process is responsible for authorizing Work Packages?
198A Team Manager is assigned a Work Package. In which process does the Team Manager execute the work and deliver the products?
199Which process ensures that the project's products are delivered according to the agreed quality criteria?
200Which report from the Team Manager is used by the Project Manager to review progress within a stage?
201What should the Project Manager do when a stage is forecast to exceed its tolerance?
202In the Directing a Project process, which of the following is a key responsibility of the Project Board?
203A project is in the Managing a Stage Boundary process. The Project Manager identifies a deviation that will cause the stage to exceed its tolerance. What should the Project Manager produce?
204Which TWO of the following are true about the Managing Product Delivery process?
205A project is in an early stage and the Project Manager discovers a new risk that could cause a delay. The risk is within the stage tolerance. What should the Project Manager do?
206Which process includes the activity 'Review the project's progress against the stage plan'?
207Which process is used by the Project Board to give ad-hoc direction to the Project Manager?
208In the Managing Product Delivery process, what is a Work Package?
209During the Controlling a Stage process, a Team Manager reports that a work package is complete. What is the next step for the Project Manager?
210In which process does the Project Manager produce an Exception Plan?
211Who is responsible for ensuring that the products are delivered in accordance with the Work Package?
212During the Managing a Stage Boundary process, which document is produced to seek approval to proceed to the next stage?
213A project is in the Controlling a Stage process, and the Project Manager receives a Request for Change (RFC) from a stakeholder. What should the Project Manager do first?
214Which THREE of the following are activities performed during the Controlling a Stage process?
215Which TWO documents are produced during the Starting Up a Project process?
216A Project Manager receives a Checkpoint Report from a Team Manager. Which process is the Team Manager executing when producing this report?
217The Project Board is reviewing an Exception Plan and decides to approve it. Which process is the Project Board executing?
218During the Closing a Project process, the Project Manager produces a Lessons Report. What should happen to this report?
219A project is in the Managing a Stage Boundary process. Which document should the Project Manager produce to report the current stage's performance?
220In the Managing Product Delivery process, what is the Team Manager responsible for?
221Which TWO of the following reports are produced by the Project Manager during the Controlling a Stage process?
222During the Controlling a Stage process, the Project Manager identifies a deviation that is expected to remain within the stage tolerance. What should the Project Manager do?
223Which process includes the activity of 'Authorize Work Packages'?
224During which process is the End Project Report produced?
225Who is responsible for ensuring that the Business Case remains viable throughout the project?
226A Work Package is being executed. The Team Manager discovers a product cannot meet its quality criteria due to an unforeseen technical limitation. What should the Team Manager do?
227Which process is triggered when the Project Board authorizes a stage plan?
228Which THREE of the following are activities of the Managing a Stage Boundary process?
229Which TWO of the following are responsibilities of the Project Manager during the Controlling a Stage process?
230A Project Manager is about to begin work on a new stage. Which document provides the authority to proceed with the stage?
231During the Managing Product Delivery process, who produces Checkpoint Reports?
232A project is in the Closing a Project process. What must be produced before the Project Board can authorise project closure?
233Which statement correctly distinguishes the Starting Up a Project process from the Initiating a Project process?
234A project is in the Managing a Stage Boundary process. Which TWO outputs are produced during this process? (Select TWO)
235Which process covers the Project Board's decision to authorise project closure?
236In the Starting Up a Project process, which document is created that outlines the project's scope, objectives, and approach?
237Which process is the Project Board's primary process for making key decisions?
238Who produces Checkpoint Reports during the Managing Product Delivery process?
239In which process are Work Packages authorized and progress reviewed by the Project Manager?
240Which process ensures that the project's products are handed over and the project is formally closed?
241The Project Manager receives a Highlight Report from the Project Board. Is this correct?
242Which of the following correctly distinguishes Project Assurance from Project Support?
243Which TWO of the following statements about the Directing a Project process are true?
244A Project Manager is reviewing progress during a stage and notices that the stage is on track. Which report should the Project Manager send to the Project Board?
245In the Controlling a Stage process, a Team Manager reports that a product is complete. Which activity does the Project Manager perform next?
246A project is in the Closing a Project process. What should the Project Manager produce to recommend project closure?
247During a stage, a Team Manager identifies a quality problem with a product. This is reported as an Off-specification. According to PRINCE2, what is the first action the Project Manager should take?
248Which process is performed by the Project Board to authorize the start of a project?
249During the Initiating a Project process, which management approach is created to define how benefits will be realized?
250Which TWO of the following are outputs of the Closing a Project process?
251A Project Manager receives a completed product from the Team Manager. Which process should the Project Manager use to verify that the product meets its quality criteria before acceptance?
252During the Controlling a Stage process, the Project Manager identifies an issue that could affect the project's ability to meet its agreed tolerances. What is the first action the Project Manager should take?
253Which product is produced during the Starting Up a Project process?
254The Project Board is reviewing the End Stage Report and the next Stage Plan. Which process are they performing?
255Who is responsible for producing Highlight Reports?
256A project is in the Managing Product Delivery process. The Team Manager discovers a problem that will delay the completion of a Work Package beyond its agreed tolerance. What should the Team Manager do?
257Which process includes the activity of 'authorizing a Work Package'?
258During which process are lessons for the project first recorded?
259A Project Manager is preparing the End Stage Report. The project has experienced a significant issue that required an Exception Plan. How should the End Stage Report reflect this?
260Who is responsible for ensuring that the project's business case remains viable throughout the project?
261Which TWO of the following statements about the Directing a Project process are correct?
262During which process does the Project Manager produce the End Stage Report?
263A Project Manager receives a Checkpoint Report from a Team Manager. Which process is the Project Manager executing when they review this report?
264The Project Board has given ad-hoc direction to the Project Manager. In which process does this occur?
265A Work Package is authorized by the Project Manager. In which process does this happen?
266During a stage, a Team Manager identifies a quality problem with a product. The product fails its quality inspection. What should the Team Manager do?
267A project is in the Initiating a Project process. Which of the following is produced during this process?
268The Project Board is considering whether to approve an Exception Plan. Which process should they use to make this decision?
269Which THREE of the following are outputs of the Starting Up a Project process?
270Which process produces the Project Brief?
271A project is in the Initiating a Project process. Which management product is defined as the key output of this process?
272During the Managing a Stage Boundary process, which report is produced to provide the Project Board with information on the current stage's performance?
273A Team Manager is assigned a Work Package. The Team Manager realizes that the work cannot be completed within the agreed tolerances. What should the Team Manager do?
274In which process are the Project Board's key decisions made, such as authorizing initiation and authorizing stage plans?
275During the Controlling a Stage process, the Project Manager receives a Checkpoint Report indicating that a product will be delivered late. What should the Project Manager do first?
276Which process is triggered when the Project Manager needs to plan the next stage and report on the current stage's performance?
277What is the main difference between the Starting Up a Project process and the Initiating a Project process?
278Who is responsible for producing the End Project Report?
279Which of the following is an output of the Initiating a Project process?
280The Project Board is considering a request to close a project early due to loss of business justification. Which process is the Project Board using to make this decision?
281During which process are the Benefits Management Approach and the Risk Management Approach first created?
282A project manager is working on a PRINCE2 project. The Project Board has just approved the Project Initiation Documentation, and the project is about to move into the delivery stage. The project manager is preparing to authorize the first work package. Which process is being executed when the project manager authorizes the work package?
283A Project Manager is midway through a stage when the Team Manager for a work package reports that a specialist product will exceed its agreed tolerance by 15 percent. The stage-level tolerances are still intact. What should the Project Manager do FIRST?
284A project is in the Controlling a Stage process. The Project Manager reviews the Work Package status and notices that a completed product has failed its quality inspection and requires rework. Which action should the Project Manager take FIRST?
285A Project Manager is reviewing the work packages that have been authorised for a project. One work package requires a team to design and build a new customer portal. The Team Manager has completed the design phase and wants to proceed with the build phase. According to PRINCE2, what should happen next to allow the build phase to proceed?
286A project is in the 'Initiating a Project' process. The Project Manager is preparing the Project Initiation Documentation (PID) for the Project Board's approval. Which activity within this process involves creating the Project Plan and defining the project's products and their quality criteria?
287A Project Manager is midway through the Controlling a Stage process. The Stage Plan shows sufficient remaining time and budget to complete all work packages, but the Project Manager has just received an Exception Report from a Team Manager indicating that a work package will exceed its agreed tolerances. What should the Project Manager do FIRST?
288A Project Manager is preparing to close a project. The Project Board has confirmed that the project's products have been handed over to the operational and maintenance environment. Which activity is part of the Closing a Project process?
289A PRINCE2 project is nearing the end of a stage. The project manager has received all Checkpoint Reports and completed the stage's products. The project manager now needs to prepare for the next stage. According to PRINCE2, which activity is performed in the Managing a Stage Boundary process?
290A project is in the Closing a Project process. The Project Manager is preparing to disband the project team and release resources. Which activity should be performed to ensure that the project's products are capable of being supported in their operational environment before the project is closed?
291The Project Manager of a PRINCE2 project is reviewing a Work Package that has been agreed with a Team Manager. During delivery, the Team Manager identifies that a product will cost significantly more than the tolerance allowed in the Work Package. What should the Team Manager do FIRST?
292A project is in the Initiating a Project process. The Project Manager is developing the Project Initiation Documentation. The Project Board has requested that the project's approach to quality be clearly defined. Which product should the Project Manager produce to meet this requirement?
293A PRINCE2 project is nearing the end of a stage. The Project Manager has confirmed that all products are complete and approved, and the next Stage Plan is ready for approval. Which action should the Project Manager take to close the current stage and move to the next?
294A Project Manager is working within the Managing a Stage Boundary process. The Project Board has requested information to decide whether to authorise the next stage. Which TWO activities are part of this process? (Choose two.)
295A project is being initiated. The Project Manager is preparing the Project Initiation Documentation (PID) and needs to ensure that the project has a clear justification. Which PRINCE2 principle is primarily addressed by the Business Case within the PID?
296A project is in the Controlling a Stage process. The Project Manager has just reviewed a completed Work Package, confirmed that all products met their quality criteria, and updated the Stage Plan. According to PRINCE2, which action should the Project Manager take NEXT?
297A PRINCE2 project is in the final stage. The project manager has completed all products and is now preparing for project closure. The Project Board has asked for assurance that the project has delivered its objectives. Which activity is part of the Closing a Project process?
298A Project Manager is leading a project using PRINCE2. The project is in the 'Controlling a Stage' process. A Work Package has been assigned to a Team Manager. Which document authorizes the Team Manager to start work on the Work Package?
299A project is nearing the end of a stage. The Project Manager has prepared the End Stage Report and the next Stage Plan. The Project Board is meeting to decide whether to authorise the next stage. According to PRINCE2, which process is being executed at this point?
300A PRINCE2 project manager is managing a stage and has identified that a work package is forecast to exceed its agreed tolerances. The project manager needs to take corrective action. Which TWO activities are part of the Controlling a Stage process? (Choose two.)
Deep-dive questions
The most-searched questions in this domain — detailed explanations, worked examples, full answer breakdowns.
Map each of the seven processes to its triggering event, owning role, and management products, then verify which process updates which product. The critical skill is matching Starting up a Project, Initiating a Project, and Closing a Project to their exact outputs.
The Courseiva PRINCE2F question bank contains 300 questions in the PRINCE2 Processes domain, covering the 14% of the exam attributed to this domain in the official PeopleCert blueprint. Click any question to see the full explanation and answer breakdown.
Start with a 10-question focused session to identify your baseline accuracy in this domain. Read every explanation — even for questions you answer correctly — to understand the reasoning. Once you score consistently above 80%, move to a 20–30 question session to confirm depth before moving to the next domain.
Yes — the session launcher on this page draws questions exclusively from the PRINCE2 Processes domain. Choose 10, 20, 30, or 50 questions for a focused session, or click individual questions to review them one by one.
Save your results, see per-domain analytics, and get readiness scores — free, for every certification.
Sign Up FreeFree forever · Every certification included