A project manager notices that team members from different departments are unclear about their roles and responsibilities. According to PRINCE2, which management product should be used to clarify this?
2In a large program, the project manager is struggling to get timely decisions from the project board due to conflicting priorities. What is the best PRINCE2 approach to address this?
3A project team is distributed across three time zones, causing communication delays. The project manager wants to apply the 'manage by stages' principle effectively. What should the project manager do first?
4During project execution, a team member raises a concern that the project's objectives are not aligned with the organization's strategic goals. Which role is primarily responsible for ensuring alignment?
5A project has a strong matrix structure. The project manager finds that team members are more loyal to their functional managers than to the project. What is the best PRINCE2 practice to improve team commitment?
6Which TWO statements about the project board are correct? (Choose two.)
7Which THREE factors should be considered when designing the project management team structure? (Choose three.)
8Given the exhibit, what is a potential issue with the decision-making process for the project board?
9A project manager notices that team members are frequently bypassing the project's defined escalation paths and going directly to senior stakeholders with issues. This is causing confusion and undermining the project's governance. Which PRINCE2 principle is being violated?
10In a PRINCE2 project, the project board is concerned that the project manager is not effectively communicating with key stakeholders. The project manager recently presented a detailed risk report to the board, but several board members were unaware of the critical risks identified. Which communication management activity should the project manager have performed to ensure the board was properly informed?
11Which TWO of the following are responsibilities of the Project Manager in PRINCE2?
12Refer to the exhibit. According to PRINCE2, to whom should the Team Manager report the potential delay?
13A large IT project is implementing a new customer relationship management (CRM) system for a multinational corporation. The project is organized with a Project Board comprising the Executive (VP of Sales), Senior User (Regional Sales Director), and Senior Supplier (IT Director). The Project Manager is an experienced PMP-certified professional. The team includes several business analysts and developers from an external supplier. The project has just completed the Initiating a Project process and received authorization to proceed to the next stage. However, during the first week of the Delivery Stage, the Project Manager notices that the business analysts are not collaborating effectively with the developers, leading to misunderstandings about requirements. The Project Manager holds a meeting and discovers that the business analysts feel excluded from decision-making and the developers complain about unclear specifications. The Project Manager wants to resolve this using PRINCE2 principles and practices. Which of the following is the BEST course of action?
14Drag and drop the steps to close a project in PRINCE2 into the correct order.
15Match each PRINCE2 role to its responsibility.
16Which role is responsible for maintaining the Business Case throughout the project?
17A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
18What is the key difference between Project Assurance and a quality review?
19Which role manages the day-to-day execution of a Work Package?
20The Project Board has not met for several months. According to PRINCE2, when should the Project Board meet?
21Who is responsible for ensuring that Project Assurance is performed?
22In PRINCE2, what is the recommended leadership style for a Project Manager when dealing with a team that has high competence and low commitment?
23Which role is optional in the PRINCE2 project management team?
24A Senior Supplier is concerned that a proposed change will impact the project's technical feasibility. What should the Senior Supplier do?
25What is the main reason PRINCE2 separates the role of Project Manager from Project Assurance?
26Which document is the key output of the Initiating a Project process?
27What is the difference between a Request for Change (RFC) and an Off-Specification (Off-Spec)?
28Which TWO of the following are responsibilities of the Project Manager?
29Which THREE of the following are true about the role of the Change Authority?
30Which TWO of the following are elements of a Work Package?
31Who is responsible for maintaining the Business Case throughout the project?
32Which document is the key output of the Initiating a Project process?
33A project is forecast to exceed its cost tolerance. What should the Project Manager do?
34What is the purpose of the Managing a Stage Boundary process?
35What is the difference between a Request for Change and an Off-specification?
36Which role is responsible for managing the day-to-day activities of the project within the tolerances set by the Project Board?
37The Team Manager receives a Work Package and proceeds with the work. A product is found to be defective. What should the Team Manager do?
38Which role is responsible for providing independent assurance to the Project Board that the project is on track?
39In PRINCE2, who is accountable for the project's success and the realization of benefits?
40Why does PRINCE2 recommend separating the role of Project Manager from Project Assurance?
41What is the primary difference between Project Assurance and a quality review?
42How often should the Project Board meet during a PRINCE2 project?
43Which TWO of the following are responsibilities of the Senior Responsible Owner (SRO)?
44Which THREE of the following are responsibilities of the Project Support role?
45Which TWO of the following statements about the Change Authority role are correct?
46Which role is ultimately accountable for the project's Business Case throughout the project?
47In PRINCE2, what is the main reason for separating the Project Manager role from the Project Assurance role?
48A Team Manager receives a Work Package from the Project Manager. During delivery, the Team Manager identifies a potential issue that may cause a delay. What should the Team Manager do first?
49Which role is responsible for providing administrative support to the project team?
50A project is in the Initiating a Project process. Which document is the key output of this process?
51During the Managing a Stage Boundary process, the Project Manager produces an Exception Plan. What triggers this?
52What is the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
53Who is responsible for defining the project's tolerance levels?
54In PRINCE2, the Project Board should meet at which frequency?
55Which document describes the user's needs and expectations for the project's products?
56The Project Board has delegated change control decisions to a Change Authority. What is the key benefit of this delegation?
57Which role is responsible for managing the delivery of one or more Work Packages?
58Which TWO of the following are responsibilities of the Project Assurance role?
59Which THREE of the following are reasons why PRINCE2 recommends separating the Project Manager from Project Assurance?
60Which TWO of the following are differences between Project Assurance and a quality review?
61Which role is accountable for the project's Business Case throughout the project?
62A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
63What is the key difference between Project Assurance and a quality review?
64Who is responsible for managing the delivery of a Work Package?
65Which document is produced in the Initiating a Project process and defines how the project will be managed?
66In a project, a Team Manager reports progress to the Project Manager using which report?
67What is the purpose of the Managing a Stage Boundary process?
68Which role chairs the Project Board?
69A Project Manager delegates the management of a Work Package to a Team Manager. What is the Team Manager's responsibility?
70What is the difference between a Request for Change and an Off-specification?
71Why does PRINCE2 separate the Project Manager role from Project Assurance?
72When should the Project Board meet?
73Which TWO roles are part of the Project Board?
74Which THREE of the following are responsibilities of the Project Manager?
75Which TWO statements correctly describe the Change Authority role?
76Which role is responsible for maintaining the Business Case throughout the project?
77A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
78What is the difference between Project Assurance and a quality review?
79In PRINCE2, who is responsible for day-to-day management of the project within tolerances?
80Which role is responsible for ensuring that the project's products meet specified quality criteria?
81What is the key difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
82The Project Manager notes that a Work Package is at risk of being delivered late. What should the Project Manager do?
83Who is responsible for providing independent assurance to the Project Board that the project is on track?
84A project is in the Managing a Stage Boundary process. Which key document is produced during this process?
85The Project Board consists of three roles. Which of the following is NOT a mandatory role on the Project Board?
86In PRINCE2, what is the role of the Change Authority?
87What is the purpose of the Starting up a Project process?
88Which TWO of the following are responsibilities of the Project Board?
89Which THREE of the following are typical responsibilities of the Project Support role?
90Which TWO of the following are true about the Senior Responsible Owner (Executive) role?
91Which role is accountable for the project's Business Case throughout the project?
92In PRINCE2, who is responsible for managing the delivery of a Work Package?
93A project is in its Initiating a Project process. The Project Manager has prepared the Project Initiation Documentation (PID). Which role is responsible for approving the PID?
94In PRINCE2, what is the key difference between the Project Assurance role and a quality review?
95During the Managing a Stage Boundary process, the Project Manager creates the Stage Plan for the next stage. Who approves this Stage Plan?
96What is the primary purpose of the Project Support role in PRINCE2?
97A project is running over time by 5% against the stage tolerance of 10%. The Project Manager expects this trend to continue. What should the Project Manager do?
98Which of the following statements best describes the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
99In PRINCE2, what is the role of the Senior Supplier on the Project Board?
100Who is responsible for appointing the Project Manager?
101Why does PRINCE2 separate the Project Manager role from the Project Assurance role?
102During a project, the Project Board is informed that a major change to the project scope is required. Which role is best placed to assess the impact on the Business Case?
103Which TWO of the following statements about the Change Authority role in PRINCE2 are correct?
104Which THREE of the following are responsibilities of the Project Manager in PRINCE2?
105Which TWO of the following are differences between the Starting Up a Project (SU) and Initiating a Project (IP) processes?
106In PRINCE2, which role is responsible for ensuring that the business case is maintained and that the project remains viable?
107A team manager has completed a work package and is ready to hand over the deliverables. To whom should the team manager report the completion?
108Which role is responsible for providing an independent check that the project is being conducted correctly and remains aligned with the business case?
109In PRINCE2, what is the key difference between Project Assurance and a quality review?
110According to PRINCE2, who is responsible for authorizing the work packages to be executed by the team?
111In PRINCE2, how often does the Project Board typically meet?
112A project is in the Initiating a Project process. Which role is responsible for preparing the Project Initiation Documentation (PID)?
113In PRINCE2, what is the difference between a Request for Change (RFC) and an Off-specification?
114Who is responsible for managing the project's day-to-day activities within the tolerances set by the Project Board?
115Which PRINCE2 principle ensures that the Project Board delegates decision-making to the Project Manager within defined tolerances?
116In PRINCE2, why is the Project Manager role separated from the Project Assurance role?
117During the Managing a Stage Boundary process, the Project Manager updates the business case. Who is accountable for approving the updated business case?
118Which TWO of the following are optional roles in the PRINCE2 project management team?
119Which THREE of the following are responsibilities of the Project Board in PRINCE2?
120Which TWO statements correctly describe the role of the Senior User in PRINCE2?
121Who is responsible for maintaining the Business Case throughout the project?
122During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?
123Which role is responsible for delivering Work Packages and reporting progress to the Project Manager?
124What is the difference between Project Assurance and quality review?
125Which of the following is an optional role in the PRINCE2 project management team?
126The Project Board is meeting to authorize the start of a new stage. According to PRINCE2, how frequently should the Project Board meet?
127In the RACI model used in PRINCE2, what is the difference between accountability (A) and responsibility (R)?
128Which role is responsible for project assurance activities in a PRINCE2 project?
129A project is in the Initiating a Project process. Which document is the key output of this process?
130What is the purpose of the Managing a Stage Boundary process?
131What is the difference between a Request for Change and an Off-specification?
132Who chairs the Project Board?
133Which TWO of the following are roles that are part of the Project Board?
134Which THREE of the following are true about Project Assurance in PRINCE2?
135Which TWO of the following are responsibilities of the Project Manager?
136Which role is ultimately accountable for the project's Business Case and its continued viability?
137During the Initiating a Project process, which document is created that defines how the project will be controlled and governed?
138What is the key difference between Project Assurance and a quality review?
139In PRINCE2, who is responsible for preparing and updating the Highlight Report?
140A project is in the Managing a Stage Boundary process. Which action should the Project Manager take?
141Which role is responsible for the day-to-day management of a Work Package?
142What is the difference between a Request for Change (RFC) and an Off-Specification (Off-Spec)?
143In which process does the Project Board authorize the next stage of a project?
144Why does PRINCE2 separate the Project Manager role from Project Assurance?
145Which role is responsible for ensuring that the project's products meet their specified quality criteria?
146A Project Manager receives a forecast that a Work Package will exceed its tolerance. What should the PM do?
147What is the purpose of the Directing a Project process?
148Who is responsible for maintaining the Business Case throughout the project?
149Which TWO of the following are responsibilities of the Project Board?
150In PRINCE2, which role is responsible for the day-to-day management of the project within the tolerances set by the Project Board?
151Which THREE of the following are defined as PRINCE2 project management team roles?
152Which PRINCE2 role is responsible for ensuring that the project's products meet the required quality criteria?
153Which TWO of the following are purposes of the Starting Up a Project process?
154What is the difference between Project Assurance and a quality review?
155Who is responsible for maintaining the Business Case throughout the project?
156Who chairs the Project Board in PRINCE2?
157During the Managing a Stage Boundary process, the Project Manager prepares an Exception Plan. What is the trigger for this activity?
158Which document is the key output of the Initiating a Project process?
159In PRINCE2, what is the difference between accountability and responsibility?
160A project is forecast to exceed its cost tolerance. What should the Project Manager do?
161Which PRINCE2 role is responsible for preparing the Project Plan?
162What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
163In PRINCE2, who is responsible for managing the delivery of a Work Package?
164Which role is responsible for managing the delivery of Work Packages and reporting progress to the Project Manager?
165What is the purpose of the Change Authority role in PRINCE2?
166What is the purpose of the Managing a Stage Boundary process?
167In PRINCE2, why is the Project Assurance role separated from the Project Manager?
168Which role is responsible for ensuring that the project is being managed correctly from the business perspective?
169Who is responsible for providing Project Support in PRINCE2?
170Why does PRINCE2 separate the Project Manager from Project Assurance?
171Which TWO roles are permanent members of the Project Board in PRINCE2?
172Which report is produced by the Team Manager and used by the Project Manager to update the Project Board?
173Who chairs the Project Board?
174Which THREE of the following are responsibilities of the Senior Supplier on the Project Board?
175A stakeholder is concerned that the project is not delivering value for money. Which role should this concern be raised with?
176Which TWO statements about the Project Board's responsibilities in PRINCE2 are correct?
177In PRINCE2, what is the difference between a risk owner and a risk actionee?
178Which role is responsible for maintaining the Business Case throughout the project?
179Which TWO of the following are responsibilities of the Project Manager?
180A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
181Which THREE of the following are defined roles in PRINCE2?
182What is the key difference between Project Assurance and quality review?
183Which THREE of the following are true regarding Project Assurance?
184Which document is the key output of the Initiating a Project process?
185Who is responsible for producing the Checkpoint Report?
186In PRINCE2, who is responsible for maintaining the Business Case throughout the project?
187What is the purpose of the Managing a Stage Boundary process?
188A project is in the Initiating a Project process. Which key document is produced as an output of this process?
189Which role can delegate change control decisions to a Change Authority?
190During the Controlling a Stage process, the Project Manager receives a Checkpoint Report from a Team Manager indicating a delay in delivering a Work Package. What should the Project Manager do first?
191What is the difference between a Request for Change (RFC) and an Off-specification?
192What is the primary purpose of the Managing a Stage Boundary process?
193During the Controlling a Stage process, a Work Package is authorized by the Project Manager. Who is responsible for delivering the Work Package?
194What is the difference between a Request for Change and an Off-specification?
195Who is responsible for ensuring that the project remains viable in terms of Business Case?
196Which TWO of the following are responsibilities of the Project Manager?
197In PRINCE2, what is the role of the Senior User?
198Which THREE of the following are roles on the PRINCE2 Project Board?
199Why does PRINCE2 separate the role of Project Manager from Project Assurance?
200Which TWO of the following are true about Project Assurance?
201Which TWO of the following are responsibilities of the Project Manager in PRINCE2?
202Which THREE of the following are responsibilities of the Senior Supplier role on the Project Board?
203Which THREE of the following are elements of the PRINCE2 project management team?
204Which TWO of the following statements correctly describe the relationship between the Project Manager and Project Assurance?
205Which TWO of the following statements about the Project Board are correct?
206Which role is responsible for maintaining the Business Case throughout the project?
207A project is forecast to exceed its cost tolerance for the current stage. What should the Project Manager do?
208Which role is responsible for the independent assurance that the project remains on track?
209What is the difference between Project Assurance and a quality review?
210Who chairs the Project Board meetings?
211Which of the following is NOT a role in the PRINCE2 project management team?
212Why does PRINCE2 separate the Project Manager from Project Assurance?
213Which role is responsible for managing the delivery of a Work Package?
214The Project Board is considering a Request for Change. Which role is authorized to approve changes within delegated limits?
215What is the difference between a Request for Change (RFC) and an Off-specification?
216Which role is responsible for producing the Highlight Report?
217Which role ensures that the project's products meet the needs of the users?
218Which TWO roles are optional in the PRINCE2 project management team?
219Which THREE of the following are responsibilities of the Project Manager?
220Which TWO statements about the Project Board are true?
221Who is responsible for maintaining the Business Case throughout the project?
222Which document is the key output of the Initiating a Project process?
223A project is forecast to exceed its cost tolerance. What should the Project Manager do?
224What is the purpose of the Managing a Stage Boundary process?
225What is the difference between a Request for Change and an Off-specification?
226Which role is responsible for the day-to-day management of the project within the tolerances set by the Project Board?
227Which statement correctly describes the relationship between Project Assurance and quality review?
228Why does PRINCE2 separate the Project Manager from Project Assurance?
229In the PRINCE2 RACI model, what does 'Accountable' mean?
230What is the difference between the Senior Responsible Owner (SRO/Executive) and a Project Sponsor?
231Who is responsible for managing the delivery of a Work Package?
232According to PRINCE2, when should the Project Board meet?
233Which TWO of the following are members of the Project Board?
234Which THREE of the following are responsibilities of the Project Manager?
235Which TWO of the following describe the role of Project Assurance?
236Who is responsible for maintaining the Business Case throughout the project?
237A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
238Which role provides independent assurance to the Project Board that the project is being managed correctly?
239What is the key difference between Project Assurance and a quality review?
240In PRINCE2, why is the Project Manager not allowed to also perform Project Assurance?
241Which document is produced by the Team Manager to report progress on a Work Package?
242Who is accountable for the success of the project in PRINCE2?
243During the Initiating a Project process, which document is created that defines how the project will be controlled?
244What is the difference between a Request for Change and an Off-specification?
245In PRINCE2, who manages the delivery of Work Packages?
246What is the purpose of the Managing a Stage Boundary process?
247In PRINCE2, what is the difference between a Senior Responsible Owner (SRO) and a Project Sponsor?
248Which TWO of the following are responsibilities of the Project Board?
249Which THREE of the following are purposes of the Directing a Project process?
250Which TWO of the following are characteristics of the Project Assurance role?
251Who is responsible for maintaining the Business Case throughout the project?
252A project is forecast to exceed its cost tolerance. What should the Project Manager do?
253What is the key difference between Project Assurance and Project Support?
254Which document describes the detailed activities, resources, and costs for a single management stage?
255Who is responsible for the day-to-day management of the project within the tolerances set by the Project Board?
256During which process is the Project Initiation Documentation (PID) created?
257What is the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
258Who chairs the Project Board meetings in PRINCE2?
259Which of the following is NOT a responsibility of the Project Manager?
260In PRINCE2, what is the purpose of the 'Managing a Stage Boundary' process?
261Which role is responsible for ensuring the project provides value for money and is aligned with business strategy?
262What is the key output of the 'Starting Up a Project' process?
263Which TWO of the following are roles defined in PRINCE2?
264Which THREE of the following are responsibilities of the Project Board?
265Which TWO of the following are true about Project Assurance?
266Who is responsible for maintaining the Business Case throughout the project?
267The Project Board has delegated authority for change control decisions to a separate body. What is this body called?
268The Project Manager has issued a Work Package to a Team Manager. The Team Manager realizes that the work cannot be completed within the agreed tolerances. What should the Team Manager do first?
269Which PRINCE2 principle is being applied when the Project Manager escalates a forecast tolerance deviation to the Project Board?
270What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
271Which role is responsible for preparing the Highlight Report?
272During the Initiating a Project process, which document is created to define the project's scope, objectives, and how it will be managed?
273What is the main purpose of separating the Project Manager role from the Project Assurance role in PRINCE2?
274The Project Board is reviewing an Exception Report that recommends a change to the project's scope. Who on the Project Board is primarily responsible for deciding whether the change is justified?
275Which document is used by the Project Manager to capture lessons learned during a stage?
276The Project Board has approved an Exception Plan to recover from a budget overrun. The Project Manager updates the Project Plan. What else must the Project Manager update?
277In a PRINCE2 project, the Project Manager has also been assigned the Project Assurance role. Which PRINCE2 principle is being violated?
278Which TWO of the following are responsibilities of the Senior Responsible Owner (SRO/Executive) on the Project Board?
279Which THREE of the following are characteristics of Project Assurance?
280Which TWO of the following are types of roles defined in a PRINCE2 project management team?
281Which role is responsible for maintaining the Business Case throughout the project?
282A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
283What is the key difference between Project Assurance and Project Support?
284Who chairs the Project Board meetings?
285In PRINCE2, a Team Manager reports to the Project Manager. What is the primary responsibility of a Team Manager?
286Which of the following best describes the relationship between the Senior Responsible Owner (SRO) and the Project Sponsor in PRINCE2?
287According to PRINCE2, which role is responsible for defining the project's tolerances?
288What is the role of Project Assurance?
289Why does PRINCE2 separate the Project Manager role from Project Assurance?
290In PRINCE2, what is the difference between a Request for Change (RFC) and an Off-specification?
291Which document is the key output of the Initiating a Project process?
292What is the purpose of the Managing a Stage Boundary process?
293Which TWO of the following are benefits of separating the Project Manager and Project Assurance roles?
294Which THREE of the following are responsibilities of the Project Board?
295Which TWO of the following statements about the Change Authority role are correct?
296Who is responsible for maintaining the Business Case throughout the project?
297In PRINCE2, what is the primary difference between Project Assurance and a quality review?
298A project is in its Controlling a Stage process. The Team Manager reports that a Work Package is likely to be completed late. The Project Manager reviews the Stage Plan and sees that stage tolerance is not forecast to be exceeded. What should the Project Manager do?
299Which role delegates change control decisions to a Change Authority?
300In PRINCE2, the Project Board typically meets on which basis?
The People: organizations, teams, and leadership domain covers the key concepts tested in this area of the PRINCE2F exam blueprint published by PeopleCert. Courseiva provides free domain-focused practice, mock exams, missed-question review, and readiness tracking across all PRINCE2F domains — no account required.
The Courseiva PRINCE2F question bank contains 300 questions in the People: organizations, teams, and leadership domain. Click any question to see the full explanation and answer breakdown.
Start with a 10-question focused session to identify your baseline accuracy in this domain. Read every explanation — even for questions you answer correctly — to understand the reasoning. Once you score consistently above 80%, move to a 20–30 question session to confirm depth before moving to the next domain.
Yes — the session launcher on this page draws questions exclusively from the People: organizations, teams, and leadership domain. Choose 10, 20, 30, or 50 questions for a focused session, or click individual questions to review them one by one.
Save your results, see per-domain analytics, and get readiness scores — free, for every certification.
Sign Up FreeFree forever · Every certification included