Question 431 of 503
Predictive Plan-Based MethodologiesmediumMultiple ChoiceObjective-mapped

Quick Answer

The answer is 16 days. This is correct because the critical path duration is defined as the longest sequence of dependent activities in a project network diagram, and in this case, path A-B-D-E totals 3 + 5 + 6 + 2 = 16 days, while path A-C-D-E totals only 15 days, making the longer path the critical one. On the Certified Associate in Project Management CAPM exam, this concept tests your ability to identify the critical path by summing durations across all possible paths, a fundamental skill for schedule management and earned value analysis. A common trap is to assume the path with the most activities is longest, but duration, not activity count, determines the critical path. To remember, think of the critical path as the bottleneck: it dictates the project’s minimum completion time, so always add up every possible route and pick the highest total. A handy mnemonic is “Longest Path, Shortest Time”—the longest duration path gives you the shortest possible project finish date.

CAPM Predictive Plan-Based Methodologies Practice Question

This CAPM practice question tests your understanding of predictive plan-based methodologies. Read the scenario carefully and evaluate each option against the stated constraints before committing to an answer. After answering, compare your reasoning against the explanation and wrong-answer breakdown below. Once you have made your selection, read the full explanation to reinforce the concept and understand why each distractor is designed to mislead on exam day.

Exhibit

Activity | Duration (days) | Predecessor
A | 3 | None
B | 5 | A
C | 4 | A
D | 6 | B, C
E | 2 | D

Refer to the exhibit. What is the critical path duration?

Question 1mediummultiple choice
Read the full NAT/PAT explanation →

Exhibit

Activity | Duration (days) | Predecessor
A | 3 | None
B | 5 | A
C | 4 | A
D | 6 | B, C
E | 2 | D

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

16 days

The critical path is the longest path through the network. Path A-B-D-E: 3+5+6+2=16 days. Path A-C-D-E: 3+4+6+2=15 days. Therefore, the critical path duration is 16 days.

Key principle: NAT direction and interface roles matter as much as the IP address mapping. Inside/outside designation controls which traffic is translated.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • 14 days

    Why it's wrong here

    No path has a duration of 14 days.

  • 17 days

    Why it's wrong here

    No path has a duration of 17 days.

  • 16 days

    Why this is correct

    The critical path (A-B-D-E) totals 16 days.

    Related concept

    Static NAT maps one inside address to one outside address.

  • 15 days

    Why it's wrong here

    This is the duration of the non-critical path.

Common exam traps

Common exam trap: NAT rules depend on direction and matching traffic

NAT is not only about the public address. The inside/outside interface roles and the ACL or rule that matches traffic are just as important.

Detailed technical explanation

How to think about this question

NAT questions usually test address translation, overload/PAT behaviour, static mappings and whether the right traffic is being translated. Read the interface direction and address terms carefully.

KKey Concepts to Remember

  • Static NAT maps one inside address to one outside address.
  • PAT allows many inside hosts to share one public address using ports.
  • Inside local and inside global describe the private and translated addresses.
  • NAT ACLs identify traffic for translation, not always security filtering.

TExam Day Tips

  • Identify inside and outside interfaces first.
  • Check whether the scenario needs static NAT, dynamic NAT or PAT.
  • Do not confuse NAT matching ACLs with normal packet-filtering intent.

Key takeaway

NAT direction and interface roles matter as much as the IP address mapping. Inside/outside designation controls which traffic is translated.

Real-world example

How this comes up in practice

A small business has 20 workstations on the 192.168.1.0/24 network and one public IP from its ISP. The router uses PAT (NAT overload) so all 20 devices share one public address using different source ports. NAT questions test whether you understand the four address terms and which direction each translation applies.

What to study next

Got this wrong? Here's your next step.

Review the four NAT address types (inside local, inside global, outside local, outside global), PAT port overload, and static vs dynamic NAT use cases. Then practise related CAPM NAT questions on configuration and troubleshooting.

Related practice questions

Related CAPM practice-question pages

Use these pages to review the topic behind this question. This is how one missed question becomes focused revision.

Practice this exam

Start a free CAPM practice session

Short sessions build daily habit. Longer sessions build exam-day stamina. Try a timed session to simulate real conditions.

FAQ

Questions learners often ask

What does this CAPM question test?

Predictive Plan-Based Methodologies — This question tests Predictive Plan-Based Methodologies — Static NAT maps one inside address to one outside address..

What is the correct answer to this question?

The correct answer is: 16 days — The critical path is the longest path through the network. Path A-B-D-E: 3+5+6+2=16 days. Path A-C-D-E: 3+4+6+2=15 days. Therefore, the critical path duration is 16 days.

What should I do if I get this CAPM question wrong?

Review the four NAT address types (inside local, inside global, outside local, outside global), PAT port overload, and static vs dynamic NAT use cases. Then practise related CAPM NAT questions on configuration and troubleshooting.

What is the key concept behind this question?

Static NAT maps one inside address to one outside address.

About these practice questions

Courseiva creates original exam-style practice questions with explanations and wrong-answer analysis. It does not publish real exam questions, exam dumps, or protected exam content. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

Last reviewed: Jun 24, 2026

Question Discussion

Share a tip, memory trick, or ask about the reasoning behind this question. Do not post real exam questions, leaked content, braindumps, or copyrighted exam material. Comments are moderated and may be removed without notice.

Loading comments…

Sign in to join the discussion.

This CAPM practice question is part of Courseiva's free PMI certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the CAPM exam.