Courseiva
Describe Dynamics 365 Field ServicehardMultiple ChoiceObjective-mapped

MB-910 Describe Dynamics 365 Field Service Practice Question

Exhibit

Refer to the exhibit.

{
  "ResourceSchedulingOptimization": {
    "Goal": "MinimizeTravelTime",
    "Constraints": {
      "MaxTravelTimePerDay": 120,
      "MaxWorkHoursPerDay": 480
    },
    "Schedule": {
      "ResourceId": "RES001",
      "WorkOrders": ["WO-100", "WO-101"],
      "TravelTime": 45
    }
  }
}

A Dynamics 365 Field Service administrator reviews the scheduling optimization output for a resource as shown in the exhibit. The resource has two work orders scheduled with a travel time of 45 minutes. If the optimization goal is to minimize travel time, what is the most likely reason the system did not schedule additional work orders?

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

The resource has reached the maximum travel time per day limit.

The resource has a maximum travel time per day of 120 minutes. The two scheduled work orders already account for 45 minutes of travel time each, totaling 90 minutes. Adding another work order with a typical travel time of 45 minutes would bring the total to 135 minutes, exceeding the 120-minute limit and preventing the system from scheduling additional work orders. Option A is incorrect because there is no evidence the resource lacks required skills. Option B is incorrect because minimizing travel time does not inherently prevent adding stops if constraints allow. Option D is incorrect because the maximum work hours per day (480 minutes) is not exceeded.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • The resource does not have the required skills for additional work orders.

    Why it's wrong here

    Skills are not part of the exhibit.

  • The optimization goal is to minimize travel time, so it avoids adding more stops.

    Why it's wrong here

    The goal influences routing but does not prevent scheduling; constraints do.

  • The resource has reached the maximum travel time per day limit.

    Why this is correct

    With 45 minutes already used, adding more work orders would exceed the 120-minute limit.

  • The resource has reached the maximum work hours per day limit.

    Why it's wrong here

    Work hours are not shown; only travel time is specified.

About these practice questions

This MB-910 question is part of Courseiva's 941-question bank — original exam-style content with full explanations and wrong-answer analysis, never real exam questions or exam dumps. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

JA

Written by Johnson Ajibi, MSc IT Security

Senior Network & Security Engineer · founder of Courseiva

This MB-910 practice question is part of Courseiva's free Microsoft certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the MB-910 exam.