A manufacturing company uses Dynamics 365 Finance and Operations. They need to configure a production flow that allows multiple products to be produced on the same production line with minimal changeover time. The production scheduler wants to automatically sequence production orders to reduce setup time. Which feature should the company configure?
⚠ Common exam trap
A common mix-up: candidates confuse operations scheduling (a broad capacity planning tool) with finite scheduling (which includes detailed sequencing constraints), leading them to choose Option D instead of A.
Answer choices
Why each option matters
Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.
Correct answer & explanation
✓
Finite scheduling with sequencing constraints
Finite scheduling with sequencing constraints is the correct feature because it allows the system to automatically sequence production orders on a shared resource (e.g., a production line) based on setup time reduction rules. This minimizes changeover time by grouping similar products or optimizing the order of operations, which directly addresses the requirement for minimal changeover and automatic sequencing.
Answer analysis
Option-by-option breakdown
For each option: why learners choose it and why it is or isn't the right answer here.
- ✓
Finite scheduling with sequencing constraints
Why this is correct
Finite scheduling with sequencing constraints enables automatic sequencing to minimize changeover time.
- ✗
Material requirements planning (MRP)
Why it's wrong here
MRP plans material requirements, not production sequencing.
- ✗
Gantt chart view in production floor control
Why it's wrong here
Gantt chart visualizes schedule but does not automatically sequence to reduce changeover.
- ✗
Operations scheduling
Why it's wrong here
Operations scheduling does not support sequencing constraints for setup time reduction.
Go deeper
Related to this question
About these practice questions
Courseiva writes every MB-920 question from scratch — 930 in total, each with an explanation and a wrong-answer breakdown. None are copied from real exams or dumps. Learn why practice questions differ from exam dumps →
JA
Written by Johnson Ajibi, MSc IT Security
Senior Network & Security Engineer · founder of Courseiva
This MB-920 practice question is part of Courseiva's free Microsoft certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the MB-920 exam.