hardmultiple choiceObjective-mapped

A technician is planning to apply a critical security patch to a production file server. The patch has been fully tested in a lab environment and the Change Advisory Board (CAB) has approved the change. The maintenance window begins in one hour. According to change management best practices, which of the following should the technician do NEXT?

Question 1hardmultiple choice
Full question →

A technician is planning to apply a critical security patch to a production file server. The patch has been fully tested in a lab environment and the Change Advisory Board (CAB) has approved the change. The maintenance window begins in one hour. According to change management best practices, which of the following should the technician do NEXT?

Answer choices

Why each option matters

Good practice is not just finding the correct option. The wrong answers often show the exact trap the exam wants you to fall into.

A

Best answer

Notify all users that the server will be unavailable.

Informing users of the scheduled downtime is a standard part of change implementation to minimize business impact.

B

Distractor review

Begin the patch installation immediately to ensure it completes within the window.

Beginning early violates the approved change window and may disrupt users without notice.

C

Distractor review

Send a reminder to the CAB that the change is about to be implemented.

The CAB has already approved the change; further notification to them is not required at this point.

D

Distractor review

Prepare a detailed backout plan in case the patch fails.

A backout plan should be prepared and reviewed as part of the change planning phase, not left until just before implementation.

Common exam trap

Common exam trap: NAT rules depend on direction and matching traffic

NAT is not only about the public address. The inside/outside interface roles and the ACL or rule that matches traffic are just as important.

Technical deep dive

How to think about this question

NAT questions usually test address translation, overload/PAT behaviour, static mappings and whether the right traffic is being translated. Read the interface direction and address terms carefully.

KKey Concepts to Remember

  • Static NAT maps one inside address to one outside address.
  • PAT allows many inside hosts to share one public address using ports.
  • Inside local and inside global describe the private and translated addresses.
  • NAT ACLs identify traffic for translation, not always security filtering.

TExam Day Tips

  • Identify inside and outside interfaces first.
  • Check whether the scenario needs static NAT, dynamic NAT or PAT.
  • Do not confuse NAT matching ACLs with normal packet-filtering intent.

Related practice questions

Related 220-1101 practice-question pages

Use these pages to review the topic behind this question. This is how one missed question becomes focused revision.

More questions from this exam

Keep practising from the same exam bank, or move into a focused topic page if this question exposed a weak area.

Question 1

A user reports intermittent network connectivity on a desktop computer. The technician observes that the Ethernet link light on the NIC turns off for a few seconds and then turns back on. The cable passes a wiremap test, the switch port is verified good with another device, and the NIC driver is updated. The issue occurs more frequently when the computer's case fan runs at high speed. Which of the following is the MOST likely cause?

Question 2

A workstation is unable to connect to the internet. The technician runs the 'ipconfig' command and sees the IPv4 address is 169.254.15.200 with a subnet mask of 255.255.0.0. The workstation can ping other devices on the local subnet but cannot ping the default gateway or any external addresses. Which TWO actions should the technician take to resolve this issue? (Select two.)

Question 3

A workstation is connected to a managed switch. It obtains a valid IP address (192.168.10.50) from the DHCP server, but it cannot ping the default gateway (192.168.10.1). The link light on both the workstation NIC and the switch port are solid green. Other workstations on the same switch CAN ping the default gateway successfully. The technician accesses the switch management interface and finds that the workstation's port is configured as an access port on VLAN 10. The default gateway is located on VLAN 20. An inter-VLAN router is configured but not explicitly allowing VLAN 10 access to VLAN 20. Which of the following is the MOST likely cause of the problem?

Question 4

A company develops a web application that relies on a custom library available only for a specific Linux distribution. They want to deploy the application in the cloud with minimal administrative overhead, but they need full control over the software stack, including the ability to install the custom library and configure the web server. Which cloud service model BEST meets these requirements?

Question 5

A company has a legacy virtual machine running on a deprecated hypervisor (Hyper-V). They want to migrate this VM to a new hypervisor (VMware vSphere) hosted in a private cloud while preserving the VM's configuration, installed applications, and data. The migration must be performed with minimal downtime. Which of the following methods is MOST appropriate?

Question 6

A company hosts a critical database on a virtual machine in a public cloud. The database requires persistent storage that must be retained even if the VM is terminated. The storage must also be accessible from multiple VMs simultaneously for a future high-availability configuration. Which type of cloud storage BEST meets these requirements?

FAQ

Questions learners often ask

What does this 220-1101 question test?

Static NAT maps one inside address to one outside address.

What is the correct answer to this question?

The correct answer is: Notify all users that the server will be unavailable. — Although the change is approved, communication is a crucial step before implementation. Users likely depend on the server and must be notified of the impending downtime. This notification should occur well before the change window begins. Starting the patch early would violate the approved window. Contacting the CAB again is unnecessary since approval has already been granted. A backout plan should have been prepared during the planning phase, not delayed until just before implementation.

What should I do if I get this 220-1101 question wrong?

Then try more questions from the same exam bank and focus on understanding why the wrong options are tempting.

Discussion

Loading comments…

Sign in to join the discussion.