CCNA Switching and Network Access • Set 28
CCNA Switching and Network Access Practice Test 28 — 15 questions with explanations. Free, no signup.
Users report that their PCs take over 30 seconds to obtain IP addresses and reach the network after being powered on. A network technician checks a switch port connected to a PC and observes that the port transitions through blocking, listening, learning, and then forwarding states, taking about 30 seconds to complete. The switch is running standard 802.1D STP. The technician confirms the port is an access port and only connects to a PC. What should the technician do next?
Choose an answer to begin — your selection is scored in the full session.
15 questions · instant feedback and full explanations after every question.