CCNA Network Infrastructure and Connectivity • Set 16
CCNA Network Infrastructure and Connectivity Practice Test 16 — 15 questions with explanations. Free, no signup.
A network engineer is troubleshooting a link between two Cisco switches that are connected via a 1000BASE-LX SFP transceiver. Hosts on VLAN 10 on Switch A cannot ping the default gateway on Switch B. The interface on Switch A is up, but the engineer notices CRC errors incrementing. What should the engineer do to resolve this issue?
Choose an answer to begin — your selection is scored in the full session.
15 questions · instant feedback and full explanations after every question.