Supporting ART Events →mediumMultiple Choice

SSM Supporting ART Events Practice Question

A team is preparing for the System Demo, but their code isn't fully integrated into the staging environment due to a pipeline failure. How should the Scrum Master guide the team?

⚠ Common exam trap

Candidates often suggest canceling the demo or presenting a slide deck instead, forgetting the SAFe requirement for demonstrating integrated, working software.

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

✓

Collaborate with the System Team and other Scrum Masters to resolve the pipeline issue before the demo.

The System Demo is the primary mechanism for evaluating the current state of the Solution and gathering feedback from stakeholders. The Scrum Master must ensure the team understands the importance of demonstrating integrated software. If technical hurdles like pipeline failures occur, the focus shifts to immediate collaboration with the System Team to ensure the ART-level integration is successful.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • ✗

    Cancel the team's portion of the System Demo to avoid showing incomplete work.

    Why it's wrong here

    Canceling the demo prevents the team from receiving critical feedback and violates the principle of transparency within the Agile Release Train. While the software might not be perfect, the goal of the event is to show progress and learn from the current state of the integrated system and its features.

  • ✗

    Demonstrate the functionality from the local development environment to prove progress.

    Why it's wrong here

    Demonstrating from a local environment is a team-level practice, not a System Demo practice, and it hides integration issues. SAFe emphasizes demonstrating on a staging environment that mimics production to ensure that the work from all teams actually functions together as a cohesive and deployable solution for users.

  • ✓

    Collaborate with the System Team and other Scrum Masters to resolve the pipeline issue before the demo.

    Why this is correct

    Collaborating with the System Team is the most effective way to address the root cause of the demo failure. This action aligns with the Scrum Master's role in removing impediments and fostering the cross-team cooperation required to maintain a continuous delivery pipeline and support the regular cadence of the ART.

  • ✗

    Use the time to explain the technical debt that caused the failure instead of showing software.

    Why it's wrong here

    Explaining technical debt is a retrospective activity and does not fulfill the requirement of the System Demo to show working software. Stakeholders attend this event to see tangible progress on Features, and substituting a technical discussion for a live demonstration fails to provide the objective evidence of progress needed.

About these practice questions

One of 385 original SSM practice questions on Courseiva, each with a full explanation and wrong-answer analysis — not exam dumps or protected exam content. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

JA

Written and reviewed by Johnson Ajibi, MSc IT Security

Senior Network & Security Engineer · founder of Courseiva

Last reviewed September 2026 · checked against the official Scaled Agile exam blueprint

This SSM practice question is part of Courseiva's free Scaled Agile certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the SSM exam.