A technician is implementing a change to a server's network configuration. After making the change, he verifies that connectivity works, but a critical application on another server stops functioning. According to change management best practices, what should the technician have done first?

⚠ Common exam trap

It's easy for candidates to assume verifying connectivity is sufficient proof of success, but the CompTIA A+ 220-1102 exam tests the understanding that change management requires a rollback plan to handle unforeseen impacts on dependent systems or applications.

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

✓

Created a rollback plan

Change management best practices require creating a rollback plan before implementing any change, even a seemingly simple network configuration change. The rollback plan ensures that if the change causes unexpected issues—such as a critical application on another server failing due to a misconfigured subnet, routing table, or firewall rule—the technician can quickly revert to the previous state without extended downtime. In this scenario, verifying connectivity alone does not guarantee that dependent services or applications remain unaffected, so a pre-defined rollback plan is essential.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • ✗

    Notified all users of the change

    Why it's wrong here

    While user notification is a courtesy and part of change communication, it does nothing to reduce the technical risk of the change itself. Without a defined rollback strategy, informing users beforehand only sets expectations; it does not prevent or mitigate a failed implementation. The first step in any change procedure is to establish how to restore service if the network configuration causes issues, because that determines the risk exposure.

  • ✗

    Tested the change in a lab environment

    Why it's wrong here

    Testing in a lab is a valuable validation step that can catch many issues, but it is not a substitute for a rollback plan; even a perfectly tested change can fail in production due to unanticipated variables like live traffic patterns or hardware quirks. In change management, the non-negotiable first step is defining how to revert the change, as that is the safety net that limits downtime. Lab testing may be skipped during emergency changes, but a rollback plan can never be skipped.

  • ✓

    Created a rollback plan

    Why this is correct

    A rollback plan is a documented set of steps to revert the network configuration to its previous known-good state, including backup configs, commands, or snapshots. It is the first thing because it defines the exit strategy and directly minimizes MTTR (mean time to repair) if the change adversely affects connectivity. Without it, a technician may have to reconstruct the old configuration from memory, extending downtime. Also, many change management frameworks require a rollback plan before approval.

  • ✗

    Obtained emergency change approval

    Why it's wrong here

    Emergency change approval secures authorization and aligns the change with business priorities, but it is a procedural checkpoint, not a technical safeguard. A rollback plan is the foundation that makes a change safe to authorize in the first place; without it, approval would be granting permission to take an unjustified risk. Even an emergency change requires at least a high-level rollback strategy before implementation.

Visual reference

192.168.1.0 /24 256 addresses (254 usable) 192.168.1.0 /25 Subnet A 128 addr (126 usable) 192.168.1.128 /25 Subnet B 128 addr (126 usable) Borrowing 1 bit from host portion creates 2 subnets (/25)

About these practice questions

One of 925 original 220-1102 practice questions on Courseiva, each with a full explanation and wrong-answer analysis — not exam dumps or protected exam content. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

JA

Written by Johnson Ajibi, MSc IT Security

Senior Network & Security Engineer · founder of Courseiva

This 220-1102 practice question is part of Courseiva's free CompTIA certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the 220-1102 exam.