Be able to map a scenario to the right ITIL 4 practice and activity, and justify why the alternatives are weaker. The single most important thing: distinguish incident, problem, change enablement, deployment and release, since exam scenarios hinge on that boundary.
Start practicing
Create, Deliver and Support — choose a session length
Free · No account required
Domain overview
This domain covers how ITIL 4 practices combine to build, deliver and support digital services: service desk, incident, problem, change enablement, service request, deployment, release and continual improvement. Questions are scenario-based, asking you to pick the correct practices, activities or roles, or to interpret a log, workflow or value stream exhibit and choose the best response.
Exam objectives
Service desk activities: logging, categorizing, prioritizing, escalating and resolving incidents and service requests across channels
Shift-left techniques such as self-service portals, knowledge articles, automation and first-line resolution
Continual improvement practice: baselining, measuring, analyzing, prioritizing and implementing improvements
Change enablement, deployment and release practices, including rollback, CI/CD pipelines and value stream mapping
Confusing incident and problem management: fixing the symptom versus finding and eliminating the underlying root cause
Assuming change enablement always requires a full change advisory board approval, ignoring standard and emergency change models
Treating deployment and release as the same practice, when deployment moves components and release makes them available to users
Click any question to see the full explanation and answer options, or start a focused practice session above.
A development team is implementing a new deployment strategy to ensure minimal downtime for a critical customer-facing application. They decide to route a small subset of traffic to the new version while monitoring performance metrics before a full rollout. Which deployment strategy is the team utilizing?
2Refer to the exhibit. The log shows an automated response to a failed deployment. Which ITIL 4 practice is primarily responsible for the execution of this 'roll back' action?
3An organization is adopting a 'Shift Left' approach to improve the quality of their service delivery. What is the primary objective of this initiative?
4Which THREE factors should be considered when choosing between a 'buy' or 'build' strategy for a new service component in an ITIL 4 context?
5A service desk team is struggling with a high volume of recurring incidents. They decide to implement a 'Swarming' approach to manage these issues. How does swarming improve the handling of complex incidents compared to traditional escalation models?
6Which concept in ITIL 4 CDS emphasizes that an organization should look at the entire flow of work from the customer's request to the delivery of value?
7An organization is looking to foster a 'culture of learning' as part of their CDS strategy. Which TWO actions best promote this culture?
8When considering the ITIL 4 CDS practice of 'Service Desk', what is the most important attribute for staff to possess in a modern, user-centric environment?
9A team uses a 'Kanban' board to manage their workflow. They notice a large number of cards sitting in the 'Testing' column. What does this indicate according to ITIL 4 CDS?
10Which THREE activities are essential for the 'Improvement' practice within the Create, Deliver and Support (CDS) context?
11A team is designing a new service. They are using 'User Stories' to define requirements. Why is this technique preferred in ITIL 4 CDS?
12When an organization uses 'Service Level Objectives' (SLOs), what is the main purpose of defining an 'Error Budget'?
13A service provider is transitioning to a 'DevOps' model. How should they adjust their approach to 'Change Enablement' compared to traditional ITIL approaches?
14A development team is implementing a new CI/CD pipeline and wants to ensure that service value is maximized during the transition. Which practice should the team prioritize to ensure that all changes are assessed for both operational readiness and value alignment?
15Refer to the exhibit. An automated deployment triggered an error. Based on CDS principles regarding 'Shift Left,' how should the team handle this failure to improve future service delivery?
16Which TWO of the following statements best describe the purpose of a 'Minimum Viable Product' (MVP) in the context of ITIL 4 Create, Deliver, and Support?
17In the context of 'Service Desk' support, which of the following best describes the 'swarming' approach to incident resolution?
18An organization is adopting a 'Shift Left' approach to improve its service delivery performance. Which of the following activities best demonstrates the application of this principle?
19Which THREE of the following are primary goals of 'Problem Management' in the context of creating, delivering, and supporting services?
20When designing a new service, which of the following is essential for ensuring 'co-creation of value' according to ITIL 4 CDS?
21Which concept in CDS focuses on the flow of work and identifying bottlenecks to improve service delivery speed?
22A team is adopting a 'DevOps' culture. What is the primary benefit of the team adopting a 'shared responsibility' model for service quality?
23Which of the following best describes the 'Feedback Loop' in the context of ITIL 4 CDS?
24Refer to the exhibit. According to ITIL 4 CDS, what change to the pipeline configuration would most effectively prevent this type of failure in the future?
25What is the primary role of 'Service Transition' planning in the Create, Deliver, and Support value chain?
26Which of the following is an example of a 'Push' strategy in service delivery?
27An organization is struggling with 'shadow IT' where teams bypass standard processes to deliver value faster. Which approach aligns with ITIL 4 CDS guidance to reconcile speed with governance?
28A service provider is transitioning to a 'Shift Left' strategy. What is the primary benefit of shifting service desk activities to the left?
29In the context of ITIL 4 CDS, what defines the 'Value Stream'?
30Which approach is most appropriate for a team aiming to improve their 'Support' activities through continuous improvement?
31Which of the following best describes the focus of the 'Create, Deliver and Support' value chain activity regarding Service Design?
32Which THREE criteria are essential for effective 'Collaboration' in ITIL 4 CDS?
33How should an organization manage 'Knowledge' to best support the 'Create, Deliver and Support' activities?
34What is the primary purpose of the 'Service Desk' in the ITIL 4 CDS model?
35Refer to the exhibit. Given the server status, which action is most aligned with ITIL 4 CDS 'Support' guidance?
36What is the primary goal of the 'Improve' activity in the ITIL 4 Service Value Chain for a CDS context?
37A software development team is adopting a shift-left approach to improve service quality. Which practice is most essential to ensuring this transition succeeds in a CDS context?
38Which TWO of the following approaches best support the 'Collaboration and Knowledge Sharing' principle in a Create, Deliver and Support environment?
39Refer to the exhibit. A team is automating their change management process for a specific service. Based on the provided policy, which change category is being utilized?
40Which activity is most closely associated with the 'Deliver and Support' value chain activity?
41Which THREE factors are essential for a successful transition from traditional project management to a product-based approach in CDS?
42Which metric provides the most insight into the effectiveness of a team’s 'Deliver and Support' efforts in a high-velocity environment?
43Refer to the exhibit. Which operational capability is being demonstrated in the log entries?
44When applying the 'Focus on value' principle in a CDS context, what is the primary consideration for a team updating an existing service?
45Which TWO actions are key to effective 'Problem Management' in a CDS-based environment?
46What is the primary role of the 'Service Desk' in a modern CDS environment?
47Which statement best describes the relationship between 'Service Level Agreements' (SLAs) and 'User Experience' in CDS?
48Which THREE practices are critical for maintaining security within a high-velocity CDS development lifecycle?
49Refer to the exhibit. Which operational benefit does the 'Blue-Green' deployment strategy provide in this CDS configuration?
50What is the primary objective of 'Swarming' as an incident management technique in a CDS context?
51An organization is designing a value stream to handle emergency security patching for cloud-hosted applications. During the flow analysis, the team notices that approval gates for urgent patches take an average of four hours due to manual compliance checks. Which action should the value stream manager take first to optimize this flow?
52A development team is implementing shift-left testing as part of their value stream improvement initiative. The primary objective is to catch defects earlier in the creation phase. However, developers are now complaining about excessive alert fatigue and increased cycle times due to unrefined automated static code analysis tools. How should the service value system address this issue?
53A development team is struggling with high levels of 'technical debt' that hinders their ability to deliver new features. Which approach best aligns with CDS guidance to balance flow and quality?
54Refer to the exhibit. Based on the provided log entry, which CDS concept should the team investigate to improve their deployment success rate?
55A service provider is transitioning to a 'Swarming' model for incident management. What is the primary benefit of this approach in a CDS context?
56In the context of CDS, what is the primary purpose of 'Prioritization' in the backlog?
57Which approach is most effective for managing 'Knowledge' within a CDS team to ensure support quality?
58Refer to the exhibit. According to this change policy, what is the mandatory requirement for a medium-risk deployment?
59A team is experiencing frequent 'bottlenecks' during the release process. Which CDS tool or technique is best suited to identify these constraints?
60In CDS, what is the main purpose of a 'User Feedback' loop during the service lifecycle?
61When considering the 'Collaborate and Promote Visibility' principle in CDS, which action best demonstrates this practice?
62Which practice is most effective in managing 'Technical Debt' in a fast-paced CDS environment?
63An organization is designing a value stream to deliver a new cloud-native application. The team notices that waiting for security approvals causes a major bottleneck in deployment frequency. According to ITIL 4, how should the team best address this constraint while maintaining control?
64During a post-implementation review of a failed major release, a team identifies that poor communication between development and operations teams contributed significantly to the outage. According to ITIL 4 guiding principles, which principle should the organization focus on to prevent future silos?
65An organization is implementing value stream mapping to analyze its software release process. Which TWO key metrics are typically captured during value stream analysis to identify bottlenecks and inefficiencies? (Choose two)
66An organization is shifting from a functional structure to a value stream-based approach to improve service delivery. Which action best supports the integration of cross-functional teams in the 'Create, Deliver and Support' value stream?
67Which TWO of the following are primary objectives of the 'Shift-Left' approach in service management?
68A team is struggling with frequent service outages and slow incident resolution. They decide to implement 'swarming' to improve their performance. How does swarming differ from traditional hierarchical escalation?
69Which THREE practices are essential for maintaining effective Knowledge Management within a high-velocity service organization?
70An IT team is adopting a 'Continuous Delivery' model. Which activity is critical for ensuring that quality remains high during frequent releases?
71A company is experiencing high 'Work in Progress' (WIP) levels, leading to long lead times for new features. Which action is the most effective way to address this issue?
72Refer to the exhibit. The CLI output shows a failed test during a deployment cycle. What is the most appropriate action based on the 'Create, Deliver and Support' guidance?
73Which concept in 'Create, Deliver and Support' emphasizes the importance of understanding the user's experience when interacting with a service?
74Which THREE factors are critical for establishing a positive and effective service culture within a team?
75An organization wants to integrate 'Continual Improvement' into their day-to-day operations. What is the most effective way to achieve this?
76Which approach is most effective for managing 'Technical Debt' in a service delivery organization?
77A cross-functional team is using a Kanban board to manage their workflow. What does the 'Done' column represent in this context?
78A development team is struggling with frequent deployment failures due to manual configuration steps in the production environment. Which practice should the team implement to improve the reliability and consistency of service releases?
79Refer to the exhibit. An IT operations team identifies this error log in the payment processing system. Which CDS concept is the team applying by using a circuit breaker pattern to prevent system-wide failure?
80An organization is adopting a 'Shift-Left' approach to improve service delivery performance. Which TWO of the following activities are primary examples of Shift-Left in a CDS context?
81Which approach best describes the 'Swarming' technique used in incident management within a CDS environment?
82Which THREE factors are essential when building a high-performing team for a cross-functional CDS value stream?
83What is the primary objective of a 'Service Desk' in the context of the Create, Deliver and Support (CDS) guidance?
84Refer to the exhibit. Which scenario best fits the application of this policy within a DevOps-driven CDS environment?
85A team wants to optimize their 'Support' activities. Which metric best captures the effectiveness of their support efforts from a value-driven perspective?
86Which TWO of the following statements correctly describe the relationship between 'Create, Deliver and Support' and the 'Service Value Chain'?
87What is the primary role of 'Configuration Management' in supporting the 'Deliver' phase of the CDS lifecycle?
88In the CDS framework, what does 'Value' primarily depend on?
89When designing a new service, why should a team focus on 'UX' (User Experience) as a core pillar of CDS?
90How does 'Continuous Improvement' contribute to the 'Create, Deliver and Support' lifecycle?
91A software development team is transitioning to a Value Stream approach. They want to ensure that 'Shift Left' practices are effectively integrated into their CI/CD pipeline. Which action best supports this objective?
92An organization is implementing a 'Work in Progress' (WIP) limit for their IT support team to improve flow. Which TWO outcomes demonstrate the effective use of these limits?
93Refer to the exhibit. The system has reached its WIP limit and is queueing requests. Based on CDS principles, what is the most appropriate action the team should take?
94A team is adopting a 'User Story' format for their requirements gathering. How does this practice contribute to the 'Create, Deliver and Support' value stream?
95A company is migrating to a 'DevOps' culture. They are struggling with the transition because development and operations remain in silos. Which CDS practice would best help bridge this gap?
96Which statement best describes the role of the 'Service Desk' within the context of the CDS value stream?
97Refer to the exhibit. A team wants to automate the deployment process. Based on the current policy, what is the most appropriate next step?
98Which concept describes the ability of a service to be restored quickly after a failure, minimizing the impact on the user?
99Which practice involves the end-to-end management of the lifecycle of all IT assets?
100When implementing a new service, which approach best aligns with the CDS principle of 'Keep it simple and practical'?
101Which CDS practice focuses on ensuring that the organization has the right skills, capabilities, and knowledge to deliver services effectively?
102A team is using 'Swarming' to resolve a major incident. What is the main benefit of this approach?
103An IT organization is struggling with 'shadow IT' and siloed knowledge across its DevOps teams. They want to implement knowledge sharing to improve support outcomes. Which TWO actions would effectively support this goal?
104Refer to the exhibit. A service desk team receives a surge of incidents regarding Service A. Based on the logs provided, what is the most appropriate next step for the support team?
105An organization is designing a new customer-facing value stream for ordering cloud services. During value stream mapping, the team identifies that approvals from the finance department take an average of three days, creating a significant delay before provisioning can begin. According to ITIL 4, how should the team address this flow efficiency bottleneck?
106A software development team is transitioning to a CI/CD pipeline. They want to ensure that code quality remains high while deployment speed increases. Which practice should the team integrate into their pipeline to best support this objective?
107A service provider is evaluating their 'Work Management' approach. Which TWO of the following statements best describe the purpose of effective work management within the context of Create, Deliver and Support?
108Refer to the exhibit. An application is failing to process user requests due to the provided error log. Which action should the IT team prioritize based on ITIL CDS principles?
109A team is struggling with frequent 'handoffs' between development and operations, causing delays in release cycles. Which strategy should they adopt to improve the efficiency of their value stream?
110Which role is most responsible for ensuring that the 'Knowledge Management' practice is effective within the CDS domain?
111Which TWO statements accurately reflect the role of 'Feedback Loops' in Create, Deliver and Support?
112Which approach best describes the 'Shift-Left' principle in service support?
113When managing a service, which THREE of the following are key indicators that the service is successfully 'Delivering' value?
114Which of the following is an example of 'Value Co-creation' in an IT service context?
115When designing the 'Customer Journey', what is the most important consideration for the service provider?
116An organization is designing a value stream to handle emergency IT infrastructure fixes. Management wants to ensure that bureaucratic approvals do not delay critical incident resolution while still maintaining adequate governance and risk management. Which approach best aligns with ITIL 4 Create, Deliver and Support guidance for structuring this value stream?
117A software development team is adopting shift-left testing as part of their value stream optimization initiative. Developers are now executing automated unit tests and static code analysis before merging any code into the main repository. What is the primary operational benefit of this practice within the context of ITIL 4 Create, Deliver and Support?
118An IT service provider is implementing the 'shift-left' approach to improve customer experience and reduce support escalation volumes. Which THREE of the following actions are best practices for achieving this objective according to ITIL 4? (Choose three.)
119An organization wants to foster a high-performing IT culture based on trust, collaboration, and continuous improvement. Which TWO of the following behaviors or practices are essential for cultivating this culture? (Choose two.)
120An IT organization is redesigning its measurement and reporting framework to focus on value rather than just internal activity metrics (vanity metrics). Which TWO of the following metrics are best aligned with ITIL 4 guidance on measuring true service value and operational effectiveness? (Choose two.)
121Refer to the exhibit. An IT team is utilizing a blue-green deployment strategy for the CustomerPortal service. The current routing directs 100% of traffic to the staging environment, and health checks have successfully passed. What should be the immediate next step in this value stream according to ITIL 4 deployment management practices?
122An organization is transitioning from a traditional siloed structure to a collaborative model. Which approach best supports the integration of development and operations teams to improve service value?
123Which activity is a primary focus of the 'Support' aspect of the Create, Deliver and Support value stream?
124How does the 'Swarming' technique differ from traditional tiered support structures?
125Which statement best describes the role of 'Feedback' within the CDS value stream?
126Refer to the exhibit. Using the 'Causal Link' analysis approach, what is the most appropriate action for the service team?
127In the context of the CDS domain, what is the purpose of a 'Minimum Viable Product' (MVP)?
128When designing a new service, which 'Key Consideration' is most critical for ensuring long-term maintainability?
129What is the primary benefit of using a 'Service Value Stream' in the CDS domain?
130Which approach is most effective for managing 'Technical Debt' in a CDS environment?
131What is the primary goal of the 'Service Desk' in the Create, Deliver and Support value stream?
132A development team is implementing a new CI/CD pipeline and wants to ensure that automated testing is integrated at the earliest possible stage. Which practice should the team prioritize to support this 'shift-left' approach?
133A service provider is transitioning to a 'Value Stream' model to improve delivery speed. Which TWO of the following activities are essential for optimizing the flow of value?
134Refer to the exhibit. A developer attempts to push code directly to the PRODUCTION environment. Based on the provided policy, what is the expected outcome and why?
135In the context of 'Create, Deliver and Support', which concept refers to the practice of providing users with the capability to request and receive services through a self-service portal?
136A team is adopting a 'Swarming' approach to incident resolution. What is the primary advantage of this method compared to traditional hierarchical escalation?
137Refer to the exhibit. Where is the primary bottleneck in this value stream, and what is the most appropriate action to improve it?
138Which practice is most focused on maintaining the 'health' of the infrastructure, including identifying and repairing hardware failures?
139Which THREE activities are critical to managing the 'Service Desk' effectively in a modern CDS environment?
140What is the primary objective of a 'Post-Implementation Review' (PIR) within the context of CDS?
141Which document is essential for providing clear, concise information about services available to customers?
142When designing a new service, which approach is most effective for ensuring the service remains 'customer-centric' throughout the CDS lifecycle?
143A software development team is transitioning to a 'Shift Left' approach. Which action best supports the objective of reducing technical debt during the development phase?
144Refer to the exhibit. Based on the logs, what is the most appropriate next action for an IT team following ITIL 4 CDS principles?
145Which concept describes the ability of a service to adapt to changing demand without manual intervention?
146Which THREE factors are essential for successfully managing a 'Swarming' approach to incident resolution?
147A team has implemented a 'CI/CD pipeline' but is experiencing a high volume of failed deployments due to environment configuration differences. Which practice should the team prioritize to address this?
148Which method best describes the 'Value Stream Mapping' approach in ITIL 4 Create, Deliver and Support?
149When designing a new service, which focus area is most important for achieving 'Customer Experience' (CX) goals?
150Which activity is a primary responsibility of the 'Service Desk' in a modern, integrated CDS environment?
151Which approach is most effective for managing 'Technical Debt' in an agile development environment?
152Which statement best describes the role of 'Observability' in the Create, Deliver and Support value chain?
153A financial services company has a critical incident where the payment gateway is down. The incident manager has assembled a team including a database administrator, a network engineer, and a payment application developer to work collaboratively on the issue. Which ITIL 4 CDS concept does this approach exemplify?
154A DevOps team is building a new microservices-based application. They want to ensure that changes can be deployed frequently and reliably. Which ITIL 4 CDS practice is most directly concerned with managing changes to the production environment?
155A company is adopting ITIL 4 CDS and wants to improve its incident resolution times. They decide to create a knowledge base of known errors and workarounds. Which practice is primarily responsible for maintaining this knowledge base?
Be able to map a scenario to the right ITIL 4 practice and activity, and justify why the alternatives are weaker. The single most important thing: distinguish incident, problem, change enablement, deployment and release, since exam scenarios hinge on that boundary.
The Courseiva ITIL4-CDS question bank contains 155 questions in the Create, Deliver and Support domain. Click any question to see the full explanation and answer breakdown.
Start with a 10-question focused session to identify your baseline accuracy in this domain. Read every explanation — even for questions you answer correctly — to understand the reasoning. Once you score consistently above 80%, move to a 20–30 question session to confirm depth before moving to the next domain.
Yes — the session launcher on this page draws questions exclusively from the Create, Deliver and Support domain. Choose 10, 20, 30, or 50 questions for a focused session, or click individual questions to review them one by one.
Save your results, see per-domain analytics, and get readiness scores — free, for every certification.
Sign Up FreeFree forever · Every certification included