ANS-C01 Network Design • Set 2
ANS-C01 Network Design Practice Test 2 — 15 questions with explanations. Free, no signup.
A company has a Direct Connect connection with a private VIF attached to a virtual private gateway. The VPC has multiple subnets in two Availability Zones. The on-premises network advertises a default route (0.0.0.0/0) via BGP. The company wants all internet-bound traffic from the VPC to go through the on-premises network. Which THREE actions are required to achieve this?