An organization's BIA determines that the payroll system has a Maximum Tolerable Downtime (MTD) of 4 hours. The current recovery plan has an RTO of 2 hours and an RPO of 1 hour. What is the maximum Work Recovery Time (WRT) allowed to meet the MTD?

⚠ Common exam trap

The trap is confusing RTO and WRT, or forgetting that MTD includes both, leading to selecting RTO or MTD directly.

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

✓

2 hours

The Maximum Tolerable Downtime (MTD) is the total time a business process can be unavailable. It is composed of the Recovery Time Objective (RTO) plus the Work Recovery Time (WRT). Given MTD = 4 hours and RTO = 2 hours, WRT = MTD - RTO = 2 hours.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • ✓

    2 hours

    Why this is correct

    MTD equals RTO plus WRT. With an MTD of 4 hours and an RTO of 2 hours, the remaining allowance for work recovery is 2 hours. RPO governs data loss, not this calculation, so it does not affect the result.

  • ✗

    3 hours

    Why it's wrong here

    Three hours subtracts only the RPO from the MTD, treating data-loss tolerance as recovery time. That arithmetic is tempting because all three values appear in the stem, but WRT is MTD minus RTO, so the RPO is irrelevant to this calculation.

  • ✗

    4 hours

    Why it's wrong here

    WRT equals MTD minus RTO, so 4 hours ignores the 2-hour recovery time entirely. Stating the full MTD is tempting because it is the headline figure in the BIA, but WRT is the residual time available after systems are restored, not the total tolerable outage.

  • ✗

    1 hour

    Why it's wrong here

    One hour equals the RPO, not the residual time after recovery. Confusing RPO with WRT is tempting because both are one-hour figures in the stem, but WRT is derived from MTD minus RTO, giving 2 hours, and RPO governs data loss tolerance instead.

About these practice questions

This CC question is part of Courseiva's 989-question bank — original exam-style content with full explanations and wrong-answer analysis, never real exam questions or exam dumps. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

JA

Written and reviewed by Johnson Ajibi, MSc IT Security

Senior Network & Security Engineer · founder of Courseiva

Last reviewed September 2026 · checked against the official ISC2 exam blueprint

This CC practice question is part of Courseiva's free ISC2 certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the CC exam.