350-401 EtherChannel • 20 Questions
20 350-401 EtherChannel practice questions with answers and explanations. Free, no signup.
A network engineer is configuring EtherChannel between two Cisco Catalyst switches. The ports are configured as access ports in VLAN 10. After configuring the port-channel interface and adding the physical ports, the engineer notices that the EtherChannel does not come up. The show etherchannel summary command shows the port-channel in a down state. What is the most likely cause?