A company uses IP SLA to track a route to a remote network via a DMVPN tunnel. Router R1 (hub) has:
ip sla 5icmp-echo 172.16.0.1 source-ip 10.0.0.1 frequency 10
ip sla schedule 5 life forever start-time now
track 5 ip sla 5 reachability
ip route 192.168.1.0 255.255.255.0 Tunnel0 track 5Tunnel0 is a DMVPN tunnel to spoke R2. The tunnel is up, but the route is intermittently removed. Show output on R1:
show ip route 192.168.1.0 % Subnet not in table
show track 5
Track 5
IP SLA 5 reachabilityReachability is Down 2 changes, last change 00:00:05
What is the root cause?