Practise PRINCE2 Foundation PRINCE2 Practices practice questions — original exam-style scenarios with answer choices, explanations, and analysis of common mistakes.

596 questions140 easy291 medium165 hard

Focused practice

Practice PRINCE2 Practices questions

Scored sessions drawing only from this domain — pick a length below.

Start 20-question practice test →

What this domain covers

What to know about PRINCE2 Practices

PRINCE2 Practices questions test whether you can apply the concept in context, not just recognise a definition.

How the topic appears in realistic exam-style scenarios.

Which detail in the question changes the correct answer.

How to eliminate plausible but wrong options.

How to connect the question back to the wider exam objective.

Watch out for

Common PRINCE2 Practices exam traps

  • Answering from memory before reading the full scenario.
  • Missing a constraint such as cost, availability, security, scope or command context.
  • Choosing a broad answer when the question asks for the most specific fix.
  • Ignoring why the wrong options are tempting.

Question index

All PRINCE2 Practices questions (596)

Click any question to see the full explanation, or start a practice session above.

1

Which TWO statements about the PRINCE2 practice 'Organizing' are correct?

Medium
2

Which document is the key output of the Initiating a Project process?

Medium
3

What is the purpose of the Product Description in the Quality practice?

Easy
4

In PRINCE2, what is the difference between a Risk Owner and a Risk Actionee?

Hard
5

A project is using the recommended risk management procedure. After identifying a risk, what is the next step?

Hard
6

Which role is responsible for providing timely feedback on team progress to the Project Manager?

Medium
7

Which TWO roles are part of the Project Board?

Medium
8

Which THREE of the following are steps in the PRINCE2 risk management procedure?

Medium
9

Which TWO of the following are roles that are part of the Project Board?

Medium
10

Which of the following is a key output of the Initiating a Project process?

Medium
11

In PRINCE2, what is the difference between a risk owner and a risk actionee?

Hard
12

What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?

Hard
13

In risk management, what is the difference between a risk owner and a risk actionee?

Hard
14

During a quality review, who is responsible for ensuring that the review is conducted effectively?

Hard
15

A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?

Medium
16

Which THREE of the following are components of the Project Initiation Documentation (PID)?

Hard
17

What is the difference between a risk owner and a risk actionee?

Medium
18

What is the difference between a Request for Change and an Off-specification?

Hard
19

An issue is raised that a product delivered by a supplier does not include a feature that was agreed in the product description. The Project Manager determines that the product is still usable without the feature. What type of issue is this?

Hard
20

Which TWO of the following are types of issue in PRINCE2?

Medium
21

What is the purpose of the Quality Review technique?

Easy
22

What is the purpose of the Product Status Account?

Medium
23

Which THREE of the following are correct statements about the Risk Management procedure in PRINCE2?

Hard
24

During a stage, a team manager reports that a key product will be delivered two weeks late due to resource constraints. The project manager updates the stage plan and finds that the stage tolerance for time is about to be exceeded. What is the first action the project manager should take?

Hard
25

A project is using PRINCE2's product-based planning. What is the first step in this approach?

Medium
26

Which role is responsible for ensuring that the project continues to have business justification?

Easy
27

What is the difference between a Highlight Report and a Checkpoint Report?

Medium
28

During the Controlling a Stage process, the Team Manager reports that a work package is likely to be completed later than planned. The Project Manager assesses that stage tolerances will not be exceeded. What should the Project Manager do?

Hard
29

During the Controlling a Stage process, the Project Manager identifies that the stage's cost tolerance is forecast to be exceeded. According to PRINCE2, what should the Project Manager do?

Medium
30

During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?

Medium
31

During the Managing a Stage Boundary process, the Project Manager produces an Exception Plan. What triggers the creation of an Exception Plan?

Hard
32

Which role is responsible for maintaining the Business Case throughout the project?

Easy
33

Which TWO of the following are acceptable responses to a threat (negative risk)?

Medium
34

Who is responsible for maintaining the Business Case throughout the project?

Easy
35

In the Risk management procedure, what is the difference between a risk owner and a risk actionee?

Hard
36

A project is using the recommended risk management procedure. After identifying a risk, what is the next step?

Hard
37

Which TWO of the following are types of issue in PRINCE2?

Medium
38

A project is using the 'reduce' response for a threat. What does this mean?

Hard
39

What is the definition of quality in PRINCE2?

Easy
40

What is the difference between a Request for Change and an Off-specification?

Medium
41

Which THREE of the following are responsibilities of the Project Manager?

Easy
42

What is the purpose of the Managing a Stage Boundary process?

Medium
43

What is the purpose of the Quality Register?

Medium
44

During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?

Medium
45

Which level of plan in PRINCE2 is produced during the Initiating a Project process?

Medium
46

What is the purpose of the Highlight Report?

Easy
47

In PRINCE2, which document is used to record quality activities and their results?

Medium
48

During the Managing Product Delivery process, the Team Manager identifies a problem with the quality criteria for a work package. What should the Team Manager do?

Medium
49

In PRINCE2, what does 'fit for purpose' mean in the context of quality?

Easy
50

What is the purpose of the Managing a Stage Boundary process?

Medium
51

In PRINCE2, what is the difference between a risk owner and a risk actionee?

Hard
52

In PRINCE2, who is responsible for defining the change budget?

Medium
53

In the risk management procedure, which step includes evaluating risk probability and impact?

Hard
54

Who is responsible for maintaining the Business Case throughout the project?

Easy
55

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
56

In product-based planning, what does the Product Flow Diagram show?

Medium
57

Which document is the key output of the Initiating a Project process?

Medium
58

Who is responsible for producing a Checkpoint Report?

Medium
59

What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?

Hard
60

Which role is responsible for providing assurance that the project is being managed correctly from a business perspective?

Easy
61

Who is responsible for maintaining the Business Case throughout the project?

Easy
62

Which TWO statements about tolerances in PRINCE2 are correct?

Hard
63

During the Closing a Project process, which report is used to evaluate the project's performance against the approved Business Case?

Hard
64

During the Managing a Stage Boundary process, the Project Manager updates the Project Plan based on the actual results of the completed stage. What is the primary reason for updating the Project Plan?

Medium
65

Which document is used to capture the quality criteria for a product?

Easy
66

Which TWO of the following are responsibilities of the Project Board?

Medium
67

What is the definition of quality in PRINCE2?

Easy
68

A project is in the Initiating a Project process. The Project Manager is creating the Project Initiation Documentation. Which plan should be produced during this process?

Medium
69

Which PRINCE2 document provides the Project Board with a summary of the stage's progress, including achievements, issues, and forecasts, at regular intervals during a stage?

Medium
70

Which THREE of the following are components of the PRINCE2 quality management approach?

Hard
71

In PRINCE2, what is the primary purpose of the Product Breakdown Structure (PBS)?

Hard
72

Which TWO of the following are typical roles in the Project Board?

Medium
73

Who is responsible for maintaining the Business Case throughout the project?

Easy
74

What is the purpose of the Quality Review Technique?

Medium
75

Who is responsible for maintaining the Business Case throughout the project?

Easy
76

Which THREE of the following are outputs of the Initiating a Project process?

Medium
77

Who is responsible for maintaining the Business Case throughout the project?

Easy
78

In PRINCE2, what is the purpose of the Managing a Stage Boundary process?

Medium
79

When is the Business Case formally reviewed and confirmed?

Medium
80

Who is responsible for maintaining the Business Case throughout the project?

Easy
81

Which document describes the quality expectations and standards for the project?

Medium
82

Which THREE of the following are responsibilities of the Project Manager during the Managing a Stage Boundary process?

Medium
83

Which TWO statements correctly describe the difference between a Request for Change (RFC) and an Off-specification?

Hard
84

A project is forecast to exceed its cost tolerance at the project level. What should the Project Manager do?

Medium
85

Which document is the key output of the Initiating a Project process?

Medium
86

Which PRINCE2 practice describes the management of product versions and baselines?

Easy
87

Which TWO statements are true about the quality review technique in PRINCE2?

Hard
88

What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?

Medium
89

Which register is used to record all issues that are raised during the project?

Easy
90

What is the difference between a Request for Change (RFC) and an Off-specification?

Hard
91

Which document is the key output of the Initiating a Project process?

Easy
92

Who is responsible for maintaining the Business Case throughout the project?

Easy
93

Which TWO statements about PRINCE2's management by exception are correct?

Medium
94

In the PRINCE2 risk management procedure, who is responsible for implementing a risk response?

Medium
95

Which role is responsible for ensuring that the project provides value for money and is accountable for the Business Case?

Easy
96

What is the definition of quality in PRINCE2?

Easy
97

In product-based planning, what is the purpose of a Product Flow Diagram?

Hard
98

Which document is the key output of the Initiating a Project process?

Medium
99

What is the definition of quality in PRINCE2?

Medium
100

A project's Senior User requests a change to the product specification after the product baseline has been approved. What should the Project Manager do first?

Hard
101

Which TWO of the following are elements of configuration management?

Medium
102

In PRINCE2, which two roles must be separate from each other in the project management team?

Hard
103

During a stage, the Project Manager receives a Checkpoint Report from a Team Manager indicating that the team has implemented a workaround for an off-specification without prior approval. What should the Project Manager do?

Hard
104

Which process is triggered when a project is forecast to exceed its stage tolerances?

Easy
105

What is the role of the Change Authority in PRINCE2?

Medium
106

Which TWO of the following are types of issue in PRINCE2?

Medium
107

During a quality review, a reviewer identifies a major defect that would make the product unfit for purpose. What should happen?

Medium
108

Which TWO of the following are components of a Business Case?

Medium
109

Who is responsible for maintaining the Business Case throughout the project?

Easy
110

Who is responsible for maintaining the Business Case throughout the project?

Easy
111

Which TWO of the following are types of issue in PRINCE2?

Medium
112

Which role is responsible for the Project Plan?

Medium
113

In PRINCE2, what is the difference between a Highlight Report and a Checkpoint Report?

Medium
114

Which process is triggered when an Exception Plan is approved?

Hard
115

A project is in its initiation stage. The project manager needs to identify the major risks that could affect the project. Which practice should be applied to identify, assess, and control these risks?

Easy
116

During the Controlling a Stage process, the Project Manager receives a Checkpoint Report from a Team Manager. What should the Project Manager do with this report?

Medium
117

In PRINCE2, what is the difference between Project Assurance and Project Support?

Hard
118

What is the difference between a risk owner and a risk actionee?

Hard
119

Which THREE of the following are components of the Business Case?

Medium
120

Who is responsible for project assurance in PRINCE2?

Easy
121

What is the difference between a risk owner and a risk actionee?

Hard
122

What is the difference between a Request for Change and an Off-specification?

Medium
123

Which THREE of the following are typical responsibilities of the Project Board?

Hard
124

During the Managing Product Delivery process, what is the Team Manager responsible for producing?

Medium
125

What is the purpose of the Product Breakdown Structure (PBS) in product-based planning?

Easy
126

Which of the following is NOT a component of the Business Case?

Easy
127

During a stage, a team manager discovers a product cannot be delivered on time due to technical issues. The stage plan has no tolerance left for time. What should the team manager do?

Medium
128

Which TWO of the following are types of issues in PRINCE2?

Medium
129

Which TWO of the following are components of the Business Case?

Medium
130

A project is forecast to exceed its cost tolerance at stage level. What should the Project Manager do first?

Medium
131

Which TWO of the following are types of issue in PRINCE2?

Easy
132

Which of the following is NOT a component of the Business Case?

Medium
133

Which TWO of the following are components of the Business Case?

Medium
134

Which THREE of the following are true about the PRINCE2 progress control approach?

Medium
135

What is the definition of quality in PRINCE2?

Medium
136

What is the difference between a Request for Change and an Off-specification?

Hard
137

Which role is responsible for defining the project's acceptance criteria?

Easy
138

Which TWO of the following are components of the Business Case?

Medium
139

What is the purpose of product-based planning in PRINCE2?

Medium
140

In the Change practice, what is the purpose of a Product Status Account?

Hard
141

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
142

What is the purpose of a Product Status Account?

Hard
143

Which TWO of the following statements about configuration management are correct?

Hard
144

Which document is the key output of the Initiating a Project process?

Medium
145

Which register records details of all quality activities planned and performed?

Medium
146

Which THREE of the following are responsibilities of the Project Board?

Hard
147

What is the purpose of the Risk Register?

Easy
148

Which THREE of the following are components of the PRINCE2 quality management approach?

Hard
149

During a stage, the Team Manager reports progress to the Project Manager. Which report should the Team Manager use?

Medium
150

Which of the following is NOT a component of the Business Case?

Medium
151

What is the difference between a Request for Change and an Off-specification?

Hard
152

In PRINCE2, what is the definition of quality?

Medium
153

Who is responsible for identifying and managing risks at the work package level?

Medium
154

In PRINCE2, what is the definition of quality?

Medium
155

A project manager is defining the project's approach to managing changes to baselined products. Which practice provides the framework for handling such changes?

Easy
156

In PRINCE2, which role is responsible for providing independent assurance that the project is being conducted properly?

Medium
157

Which TWO of the following are components of a Business Case?

Medium
158

Which document is the key output of the Initiating a Project process?

Medium
159

Who is responsible for maintaining the Business Case throughout the project?

Easy
160

Who is responsible for approving the Project Plan?

Easy
161

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
162

Who is responsible for maintaining the Business Case throughout the project?

Easy
163

During a stage, a Team Manager reports that a work package is likely to be delayed. What should the Project Manager do?

Hard
164

Which of the following is a key difference between a Request for Change (RFC) and an Off-specification (Off-spec)?

Hard
165

Which role is responsible for providing independent assurance that the project is being managed correctly?

Medium
166

What is the purpose of the Managing a Stage Boundary process?

Medium
167

What is the purpose of the Quality Review technique?

Easy
168

Which THREE of the following are threat response types in PRINCE2?

Hard
169

Which risk response is appropriate for an opportunity with high probability and high impact?

Hard
170

Which role is accountable for the business justification of a PRINCE2 project?

Easy
171

What is the difference between a Request for Change and an Off-specification?

Hard
172

A project is using the product-based planning technique. Which document describes the hierarchy of products to be created?

Medium
173

Which THREE of the following are PRINCE2 management products that contain baselines?

Hard
174

Which TWO of the following are components of the Business Case?

Medium
175

Which document is the key output of the Initiating a Project process?

Medium
176

Which document is the key output of the Initiating a Project process?

Medium
177

Which TWO roles are members of the Project Board?

Medium
178

What is the primary purpose of the Managing a Stage Boundary process?

Medium
179

What is the first step in the recommended risk management procedure?

Medium
180

Who is responsible for appointing the Project Manager?

Easy
181

What is the difference between a Request for Change and an Off-specification?

Hard
182

The Project Manager is planning the next stage and needs to define the order in which products will be developed. Which product-based planning technique should they use?

Hard
183

In PRINCE2, which document is the key output of the Initiating a Project process?

Medium
184

Who is responsible for maintaining the Business Case throughout the project?

Easy
185

What is the difference between Quality Assurance and Quality Control in PRINCE2?

Hard
186

What is the difference between a Request for Change and an Off-specification?

Hard
187

Which document is the key output of the Initiating a Project process?

Easy
188

During the Initiating a Project process, the project manager is defining the project's approach to quality. Which practice provides the framework for quality planning and control?

Hard
189

Which register is used to record issues that may affect the project's baselines?

Medium
190

What is the purpose of the Managing a Stage Boundary process?

Medium
191

What is the definition of quality in PRINCE2?

Easy
192

Which process is triggered when a stage tolerance is forecast to be exceeded?

Medium
193

What is the purpose of the Quality Review technique?

Easy
194

Which of the following is NOT a component of the Business Case?

Easy
195

What is the purpose of the Highlight Report?

Medium
196

Who is responsible for the day-to-day management of project risks?

Easy
197

Which of the following is a risk response appropriate for an opportunity?

Hard
198

Who typically authorizes the use of the change budget?

Hard
199

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
200

Which of the following is a valid threat response in PRINCE2?

Medium
201

Which of the following correctly describes the relationship between the Change Authority and the Project Board?

Hard
202

Which document is used by the Project Board to monitor progress at the end of a stage?

Easy
203

In the context of PRINCE2 configuration management, what is the purpose of a 'baseline'?

Hard
204

In PRINCE2, what is the purpose of the 'Managing Product Delivery' process?

Easy
205

Which TWO of the following are components of the Business Case?

Medium
206

What is the purpose of the Business Case practice?

Easy
207

What is the purpose of the Managing a Stage Boundary process?

Easy
208

Which document is the key output of the Initiating a Project process?

Medium
209

Which TWO of the following are types of issue in PRINCE2?

Easy
210

Which register records all identified risks and their status?

Easy
211

Which PRINCE2 principle emphasizes that a project should have continued business justification?

Easy
212

Which TWO of the following are components of the Project Initiation Documentation (PID)?

Medium
213

Which risk response is appropriate for a threat with high probability and high impact that cannot be reduced?

Medium
214

What is the first step in the PRINCE2 recommended risk management procedure?

Medium
215

What is the PRINCE2 definition of quality?

Medium
216

Who is responsible for providing assurance that the project is being conducted properly?

Medium
217

Which THREE of the following are components of the Project Initiation Documentation (PID)?

Hard
218

During a quality review, it is discovered that the acceptance criterion 'The system shall be compatible with Windows 10 and macOS' has been classified as 'Should' (i.e., a desirable but not essential criterion). Which action should be taken?

Hard
219

Which PRINCE2 principle is applied when a Project Manager escalates a forecast tolerance deviation to the Project Board?

Medium
220

Which document describes the quality criteria and acceptance methods for a product in PRINCE2?

Medium
221

Which document describes the quality methods and tools to be used on the project?

Medium
222

What is the purpose of the Managing a Stage Boundary process?

Medium
223

Which THREE of the following are threat responses defined in PRINCE2?

Medium
224

Who is responsible for maintaining the Business Case throughout the project?

Easy
225

Which THREE of the following statements about the PRINCE2 principle 'Manage by Exception' are correct?

Hard
226

Which TWO of the following statements about the Quality Review technique are correct?

Hard
227

What is the difference between a risk owner and a risk actionee?

Hard
228

Which TWO of the following are threat responses in PRINCE2?

Medium
229

Which THREE of the following are characteristics of PRINCE2's product-based planning approach?

Hard
230

Which document describes the quality management approach for the project, including the procedures to be used for quality assurance and quality control?

Medium
231

Which THREE of the following are roles in the Project Management Team according to PRINCE2?

Hard
232

Which of the following is a key difference between a Request for Change and an Off-specification?

Hard
233

The Project Board has set a cost tolerance of +/- 10% for a stage. The Project Manager forecasts that the stage will be completed 15% under budget. What should the Project Manager do?

Medium
234

A project manager discovers that a product expected to be completed in the current stage does not meet its product description quality criteria. The project manager has already used the stage's change budget to address a similar issue. What should the project manager do?

Hard
235

Which practice describes why the project is being done and ensures continued business justification?

Easy
236

A project has identified a risk that could impact the project's schedule. The team decides to allocate extra resources to ensure the schedule is met despite the risk. Which risk response is being applied?

Hard
237

Which THREE of the following are elements of the PRINCE2 quality practice?

Hard
238

What is the difference between Project Assurance and Project Support?

Hard
239

Which TWO of the following are outputs of the Initiating a Project process?

Medium
240

What is the difference between a Request for Change and an Off-specification?

Hard
241

Which TWO statements about the Risk practice are correct?

Medium
242

What is the definition of quality in PRINCE2?

Easy
243

Which THREE of the following are roles in the project management team?

Medium
244

In PRINCE2, what is the definition of quality?

Medium
245

What is the purpose of the Risk Register?

Medium
246

During the Managing Product Delivery process, the Team Manager delivers products to the Project Manager. What document authorizes the Team Manager to deliver the work?

Medium
247

What is the purpose of the Managing a Stage Boundary process?

Easy
248

Which practice defines the project management team structure?

Easy
249

Which TWO of the following are components of a Product Description?

Medium
250

Which TWO of the following are types of tolerance that can be set in PRINCE2?

Easy
251

Which TWO of the following are components of the Business Case?

Medium
252

In PRINCE2, what is the purpose of the Managing a Stage Boundary process?

Hard
253

Which TWO of the following are types of issue in PRINCE2?

Medium
254

Which TWO of the following are opportunity responses in PRINCE2 risk management?

Medium
255

Which THREE of the following are risk responses for a threat?

Medium
256

Which TWO of the following are components of the Project Initiation Documentation (PID)?

Medium
257

In the Organising practice, which role is responsible for providing assurance that the project is being conducted correctly?

Easy
258

Which report does the Project Manager produce regularly to inform the Project Board of progress within a stage?

Medium
259

Who is responsible for maintaining the Business Case throughout the project?

Easy
260

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
261

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
262

Which practice describes the project management team structure and defines roles and responsibilities?

Easy
263

Which of the following best describes the purpose of the Directing a Project process?

Medium
264

Which document is the key output of the Initiating a Project process?

Medium
265

Which role is responsible for providing assurance that the project is being managed correctly in terms of business, user, and supplier interests?

Medium
266

Which TWO of the following are opportunity responses in PRINCE2?

Hard
267

Which TWO of the following are correct statements about tolerance in PRINCE2?

Medium
268

Who is responsible for maintaining the Business Case throughout the project?

Easy
269

In the Progress practice, what is 'management by exception'?

Medium
270

Which role is accountable for the project's success and chairs the Project Board?

Easy
271

What is the purpose of the Managing a Stage Boundary process?

Easy
272

What is the purpose of the Managing a Stage Boundary process?

Easy
273

What is the difference between a Request for Change and an Off-specification?

Medium
274

What is the purpose of the Plans practice?

Medium
275

Which TWO of the following are types of issue in PRINCE2?

Medium
276

What is the purpose of the Managing a Stage Boundary process?

Medium
277

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
278

Drag and drop the steps to create a PRINCE2 project plan into the correct order.

Medium
279

Which process authorizes a work package?

Easy
280

What is the purpose of the Quality Review technique?

Medium
281

What is the difference between a Request for Change and an Off-specification?

Hard
282

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
283

What is the difference between a Request for Change and an Off-specification?

Medium
284

In the Progress practice, who receives the Highlight Report?

Medium
285

Which THREE of the following are true about the PRINCE2 Quality Review technique?

Hard
286

Which risk response is appropriate for an opportunity that the project wants to make more likely to happen?

Medium
287

An issue is raised stating that a product has been delivered but does not meet its agreed specification. What type of issue is this?

Hard
288

What does the 'management by exception' principle in PRINCE2 mean?

Easy
289

Which document describes the quality expectations and acceptance criteria for a project's products?

Medium
290

Which PRINCE2 principle is being applied when a project uses management by exception?

Medium
291

Which TWO of the following are types of issue in PRINCE2?

Medium
292

A project is forecast to exceed its cost tolerance. What should the Project Manager do first?

Medium
293

In product-based planning, what is the purpose of a Product Flow Diagram?

Hard
294

Which of the following is an opportunity response in PRINCE2?

Medium
295

What is the purpose of the Managing a Stage Boundary process?

Medium
296

Which TWO statements correctly describe the difference between the risk owner and the risk actionee?

Hard
297

What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?

Hard
298

In the Organising practice, what is the single point of accountability for the project's business justification?

Medium
299

What is the difference between a Request for Change and an Off-specification?

Hard
300

Which TWO of the following are responsibilities of the Project Board?

Medium
301

Which of the following is NOT a component of the Business Case?

Medium
302

Who is responsible for maintaining the Business Case throughout the project?

Easy
303

During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?

Medium
304

Which of the following is NOT a component of the Business Case?

Easy
305

What is the purpose of the Highlight Report?

Easy
306

Which TWO of the following are components of the Business Case?

Medium
307

Which THREE of the following are components of the Business Case?

Medium
308

According to PRINCE2, who is responsible for maintaining the Business Case throughout the project?

Easy
309

During a project, a team manager reports that a work package is taking longer than expected. The project manager needs to assess the impact on the project schedule. Which practice should be used to evaluate the effect and determine whether to escalate?

Medium
310

What is the purpose of the Highlight Report?

Easy
311

Which document is the key output of the Initiating a Project process?

Medium
312

During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?

Medium
313

In PRINCE2, what is the difference between a Request for Change (RFC) and an Off-specification?

Hard
314

Which role is responsible for ensuring that project assurance is carried out independently of the Project Manager?

Easy
315

A project is experiencing many changes due to evolving requirements. Which document should the Project Manager use to track all requests for change?

Medium
316

What is the difference between a Request for Change and an Off-specification?

Hard
317

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
318

A project is in the Initiating a Project process. The project manager is reviewing the Business Case and notes that the expected benefits are not clearly linked to the project's objectives. Which practice should the project manager use to address this issue?

Medium
319

Who is responsible for maintaining the Business Case throughout the project?

Easy
320

What is the purpose of the Managing a Stage Boundary process?

Medium
321

What is the purpose of the Managing a Stage Boundary process?

Easy
322

Which management product defines the quality criteria and acceptance methods for a product?

Easy
323

Which document describes the quality criteria and quality methods to be applied during the project?

Medium
324

Which document is used to capture and track all identified risks throughout the project?

Easy
325

Which risk response is appropriate for a threat that the project team decides to eliminate by changing the project approach?

Easy
326

During which process are team plans typically created?

Medium
327

What is the purpose of the Managing a Stage Boundary process?

Medium
328

In PRINCE2, what is the definition of quality?

Medium
329

Who is responsible for maintaining the Business Case throughout the project?

Easy
330

What document is a key output of the Initiating a Project process?

Medium
331

Which document is the key output of the Initiating a Project process?

Medium
332

What is the difference between a Request for Change and an Off-specification?

Medium
333

What is the difference between a Request for Change and an Off-specification?

Medium
334

Who is responsible for providing assurance that the project is being conducted properly?

Medium
335

In PRINCE2, who is responsible for maintaining the Business Case throughout the project?

Easy
336

What is the definition of quality in PRINCE2?

Easy
337

What is the difference between a Request for Change and an Off-specification?

Hard
338

In PRINCE2, what is the purpose of the Quality Review Technique?

Medium
339

Which THREE of the following are responsibilities of the Project Board?

Hard
340

In the PRINCE2 risk management procedure, what is the immediate next step after assessing a risk?

Medium
341

What is the purpose of the Managing a Stage Boundary process?

Easy
342

Who is responsible for maintaining the Business Case throughout the project?

Easy
343

Which component of the Business Case describes the expected measurable improvements resulting from the project?

Medium
344

What is the purpose of the Managing a Stage Boundary process?

Medium
345

Which document describes the quality criteria for a product and is used during quality inspection?

Medium
346

During the Managing Product Delivery process, a Team Manager identifies a defect in a product that is currently being developed. The defect means the product will not meet its agreed quality criteria. What should the Team Manager do?

Medium
347

Which of the following is NOT a component of the Business Case?

Medium
348

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
349

A team manager reports that a work package is complete. What should the Project Manager do to verify this?

Medium
350

Which document is the key output of the Initiating a Project process?

Medium
351

What is the difference between a Risk Owner and a Risk Actionee?

Hard
352

What is the purpose of the Quality Register?

Easy
353

Which report is produced by the Team Manager to inform the Project Manager about progress on a Work Package?

Medium
354

The Project Manager is reviewing an issue that affects a product currently in development. The product does not meet a requirement defined in its Product Description. What type of issue is this?

Hard
355

In a project using PRINCE2, the project board is reviewing the End Stage Report. They notice that the actual costs are significantly lower than planned, but the scope is complete. What should the project board do?

Medium
356

What is the purpose of the Managing a Stage Boundary process?

Easy
357

Which document is the key output of the Initiating a Project process?

Medium
358

What is the difference between a Request for Change and an Off-specification?

Hard
359

A team member reports a problem that could impact the next stage. What should the Team Manager do?

Medium
360

Who is responsible for producing a Checkpoint Report?

Medium
361

What is the difference between a Highlight Report and a Checkpoint Report?

Hard
362

Which TWO of the following are elements of the Business Case?

Medium
363

Which document is the key output of the Initiating a Project process?

Medium
364

Who is responsible for maintaining the Business Case throughout the project?

Easy
365

During which process does the Project Board make a decision on the next stage after reviewing the End Stage Report?

Medium
366

What is the difference between a Request for Change and an Off-specification?

Hard
367

Which TWO of the following are PRINCE2 principles?

Medium
368

What is the difference between a Request for Change (RFC) and an Off-specification?

Hard
369

The Managing a Stage Boundary process includes which of the following activities?

Hard
370

In the PRINCE2 risk management procedure, which step follows 'Assess'?

Hard
371

What is the difference between a Checkpoint Report and a Highlight Report?

Easy
372

A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?

Medium
373

Which process does the Project Board use to make key decisions and commit resources?

Medium
374

Which role is responsible for providing assurance that the project is being conducted properly?

Easy
375

Which THREE elements are part of the PRINCE2 Quality practice?

Hard
376

A project to upgrade the IT infrastructure of a medium-sized company is in the Initiating a Project process. The project manager has created the Business Case, which shows a net present value (NPV) of £150,000 and an internal rate of return (IRR) of 12%. The project board's executive is concerned that the project may not deliver the expected benefits because the market demand for the new infrastructure is uncertain. The project manager is now preparing the Project Plan. What should the project manager do next?

Easy
377

In the Risk practice, who is responsible for implementing a risk response?

Medium
378

Who is responsible for maintaining the Business Case throughout the project?

Easy
379

Which THREE of the following are responsibilities of the Project Board?

Hard
380

Which TWO of the following are components of the Project Initiation Documentation (PID)?

Medium
381

Which TWO statements about the PRINCE2 Quality practice are correct?

Medium
382

Which THREE of the following are components of the defined project management team structure in PRINCE2?

Hard
383

Which document describes the quality criteria for a specific product?

Medium
384

What is the purpose of the product-based planning approach in PRINCE2?

Medium
385

In PRINCE2, what is the difference between Project Assurance and Project Support?

Hard
386

Which plan is produced during the Initiating a Project process and covers the entire project at a high level?

Easy
387

Which THREE of the following are threat response types in PRINCE2?

Medium
388

In the Organising practice, what is the principle behind separating assurance from management?

Hard
389

Who should perform Project Assurance to ensure independence from the Project Manager?

Medium
390

Who is responsible for providing assurance that the project is being managed correctly?

Medium
391

Which report is produced by the Team Manager to inform the Project Manager about progress against a Work Package?

Medium
392

Which TWO roles are permanent members of the Project Board?

Easy
393

In PRINCE2, what is the difference between a risk owner and a risk actionee?

Hard
394

In PRINCE2, who is responsible for defining the project's acceptance criteria?

Hard
395

A project manager is defining the project's products in the Product Breakdown Structure. A key stakeholder disagrees with the inclusion of a certain product, claiming it is not needed. The project manager believes the product is essential to meet the user requirements. What is the best course of action according to PRINCE2 practices?

Medium
396

What is the purpose of the Product Status Account?

Easy
397

During the Managing a Stage Boundary process, what is the Project Manager required to produce?

Medium
398

Which practice defines the project management team structure and roles?

Easy
399

Who is responsible for maintaining the Business Case throughout the project?

Easy
400

What is the key difference between a Request for Change and an Off-specification?

Hard
401

A project has identified an opportunity to reduce costs by using a new technology. The Project Manager decides to allocate additional resources to increase the likelihood of this opportunity occurring. Which risk response type is being applied?

Hard
402

What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?

Hard
403

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
404

Which TWO of the following are types of issue in PRINCE2?

Medium
405

Which THREE of the following are components of a Business Case?

Hard
406

A project manager is creating the project product description. Which practice provides the guidance for defining the project's outputs and acceptance criteria?

Hard
407

Which THREE statements about the PRINCE2 Risk practice are correct?

Hard
408

During which process does the Project Board authorize the project to proceed with the initiation stage?

Medium
409

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
410

Which role is responsible for providing independent assurance that the project is being managed correctly?

Hard
411

Which TWO of the following are components of the Project Initiation Documentation (PID)?

Medium
412

Which risk response is appropriate for a threat that the project decides to mitigate by outsourcing?

Medium
413

A project is in the Initiating a Project process. The project manager is creating the Risk Management Approach. Which of the following should be included in this approach?

Easy
414

Which THREE of the following are threat responses in PRINCE2?

Hard
415

Which TWO of the following statements about the Progress practice are correct?

Hard
416

Which THREE of the following are typical components of a Business Case?

Hard
417

Which practice defines the project management team structure and roles?

Easy
418

Who is responsible for maintaining the Business Case throughout the project?

Easy
419

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
420

What is the purpose of a Checkpoint Report?

Medium
421

A project is using the PRINCE2 risk management procedure. A risk has been identified that, if it occurs, could cause a major delay to the project. The risk owner decides to take action to reduce the probability of the risk occurring. Which risk response type is being used?

Hard
422

In PRINCE2, what is the definition of quality?

Hard
423

Which TWO of the following are opportunity responses in PRINCE2?

Medium
424

A project is in the Initiating a Project process. Which document is created to define how issues and changes will be managed?

Hard
425

Who is responsible for approving the Project Plan?

Easy
426

Which document describes the quality management approach for the project, including quality assurance and quality control activities?

Easy
427

A Project Manager receives a Checkpoint Report from a Team Manager. What should the Project Manager do with this information?

Medium
428

What is the purpose of the Directing a Project process?

Easy
429

During a stage, the Project Manager receives a Checkpoint Report from a Team Manager. What is the primary purpose of this report?

Hard
430

Which role is responsible for defining the project's acceptance criteria?

Easy
431

Which THREE of the following are purposes of the Highlight Report?

Hard
432

In the Organizing practice, what is the role of Project Assurance?

Hard
433

Which TWO are types of issue in PRINCE2?

Medium
434

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
435

Who is responsible for providing independent assurance that the project is being managed correctly?

Easy
436

Which TWO of the following are types of issue in PRINCE2?

Medium
437

What is the purpose of the Quality Review technique in PRINCE2?

Hard
438

Which document describes the quality methods and tools to be used on a project?

Easy
439

In PRINCE2, what is the difference between a risk owner and a risk actionee?

Hard
440

In PRINCE2, what is the difference between a risk owner and a risk actionee?

Hard
441

Which document is created during the Initiating a Project process and provides a baseline against which the project is managed?

Medium
442

During a stage, the Team Manager identifies a problem that affects the quality of a product. The product description specifies a quality criterion that cannot be met. What type of issue is this?

Hard
443

Which THREE of the following are types of issue in PRINCE2?

Medium
444

A project is forecast to exceed its cost tolerance. What should the Project Manager do first?

Medium
445

Which role is responsible for defining the project's acceptance criteria?

Easy
446

Which document is the key output of the Initiating a Project process?

Medium
447

In PRINCE2, who is responsible for ensuring that project assurance is independent of the Project Manager?

Medium
448

In PRINCE2, what is the difference between Project Assurance and Project Support?

Hard
449

Which product describes the quality methods and tools to be used during the project?

Medium
450

Which TWO of the following are types of issue in PRINCE2?

Medium
451

What is the purpose of the Managing a Stage Boundary process?

Medium
452

Which TWO of the following are typical responsibilities of the Project Board?

Medium
453

Which document is produced during the Initiating a Project process and provides a baseline against which the project's progress can be measured?

Medium
454

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
455

Which TWO of the following are responsibilities of the Project Board?

Medium
456

A project manager is creating the project product description. Which practice does this document belong to?

Hard
457

Which of the following is NOT an opportunity response in PRINCE2?

Hard
458

In the product-based planning approach, what is the purpose of the Product Breakdown Structure (PBS)?

Medium
459

Which PRINCE2 management product is used to capture lessons throughout the project?

Medium
460

In PRINCE2, who is responsible for the Business Case?

Easy
461

Which risk response is appropriate for a threat that the project team decides to proactively manage by reducing the probability or impact?

Medium
462

Which risk response is appropriate for a threat that can be mitigated by transferring the financial impact to a third party?

Medium
463

Which of the following describes the relationship between Project Assurance and Project Support?

Hard
464

According to PRINCE2, who is responsible for maintaining the Business Case throughout the project?

Easy
465

Who is responsible for maintaining the Business Case throughout the project?

Easy
466

What is the difference between a Request for Change (RFC) and an Off-specification?

Hard
467

Which TWO of the following are valid tolerances in PRINCE2?

Medium
468

Which report is prepared by the Team Manager and sent to the Project Manager at regular intervals?

Medium
469

Who receives Highlight Reports?

Medium
470

Which THREE of the following are components of a Product Description?

Hard
471

Which document defines the quality criteria and acceptance methods for a project's products?

Medium
472

The project's risk appetite has been defined as 'cautious'. A high-impact opportunity with low probability is identified. What is the most likely response?

Medium
473

In PRINCE2, who is responsible for providing assurance that the project is being conducted properly?

Medium
474

In the risk management procedure, what is the difference between a risk owner and a risk actionee?

Hard
475

What is the difference between a Highlight Report and a Checkpoint Report?

Medium
476

In PRINCE2, who is responsible for project assurance?

Easy
477

Which TWO of the following are components of a Business Case?

Medium
478

What is the difference between a Request for Change (RFC) and an Off-specification?

Hard
479

A risk has been identified that could cause a delay to the project. The project team decides to purchase insurance to cover the financial impact. Which risk response type is this?

Hard
480

Which TWO of the following are steps in the PRINCE2 risk management procedure?

Medium
481

A project is using the PRINCE2 product-based planning technique. Which of the following describes the correct sequence of activities?

Hard
482

During the Managing a Stage Boundary process, the Project Manager reviews the Business Case and finds that the expected benefits are no longer achievable. What should the Project Manager do?

Hard
483

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
484

Which THREE of the following are typical response strategies for a threat (negative risk) in PRINCE2?

Medium
485

During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?

Medium
486

Which THREE of the following are responsibilities of the Project Board?

Hard
487

A project manager is reviewing the business case for a new product development project. The project board has expressed concern that the benefits may not be realized as planned. Which management product should the project manager update to address this concern?

Medium
488

Which THREE of the following are types of issue defined in PRINCE2?

Hard
489

Based on the exhibit, what is the current risk exposure of risk R1?

Medium
490

Which THREE of the following are valid threat responses in PRINCE2?

Hard
491

Which TWO of the following are components of the Business Case?

Easy
492

What is the purpose of a Checkpoint Report?

Medium
493

Which TWO of the following are components of the Business Case?

Medium
494

Which PRINCE2 principle is being applied when the Project Manager escalates a tolerance deviation to the Project Board?

Medium
495

Who is responsible for performing Project Assurance?

Hard
496

Which risk response is appropriate for a threat that the project team decides to actively reduce the probability or impact of?

Medium
497

What is the difference between a Request for Change and an Off-specification?

Hard
498

Who is responsible for maintaining the Business Case throughout the project?

Easy
499

What is the difference between a Request for Change and an Off-specification?

Hard
500

Which document records the project's planned costs, timescales, and products?

Easy
501

Who is responsible for maintaining the Business Case throughout the project?

Easy
502

A project has identified a risk that the key supplier may go out of business. The Project Manager decides to source a backup supplier. Which risk response is being applied?

Medium
503

What is the purpose of the Managing a Stage Boundary process?

Medium
504

Who is responsible for maintaining the Business Case throughout the project?

Easy
505

In PRINCE2, which role is responsible for maintaining the risk register?

Hard
506

In the PRINCE2 risk management procedure, which step involves deciding whether to respond to a risk and selecting the appropriate response?

Medium
507

Which role is responsible for managing the project on a day-to-day basis?

Easy
508

What is the definition of quality in PRINCE2?

Easy
509

Which THREE of the following are risk responses for threats?

Hard
510

Which THREE of the following are typical elements of a Product Description?

Medium
511

A project is in the Managing a Stage Boundary process. The Project Manager discovers that a key team member has left the project and a replacement will cost more than planned. What should the Project Manager do?

Hard
512

Which TWO of the following are components of the Business Case?

Medium
513

Which document defines the quality criteria for a product and is used during quality control?

Medium
514

Which of the following best describes the 'risk owner'?

Medium
515

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Medium
516

During a project, a Team Manager reports that a product will be delivered two weeks later than planned. The tolerance for the Work Package is one week. What should the Team Manager do?

Hard
517

Which document describes the quality methods and responsibilities for the project?

Easy
518

Which practice is responsible for defining the project's approach to identifying, assessing, and controlling uncertainty?

Medium
519

In product-based planning, what is the purpose of a Product Flow Diagram?

Medium
520

What is the key output of the Initiating a Project process?

Easy
521

The Project Board is considering whether to authorize the next stage. The current stage has used all its cost tolerance. What should the Project Board do?

Medium
522

Which THREE of the following are responsibilities of the Executive?

Hard
523

Which THREE of the following are examples of threat responses in the Risk practice?

Hard
524

Which PRINCE2 document contains the cost and time tolerances for the project?

Easy
525

Which TWO of the following are components of the Business Case?

Medium
526

Which TWO of the following are responsibilities of the Senior User role?

Hard
527

Which document is the key output of the Initiating a Project process?

Medium
528

Which TWO of the following documents are produced by the Project Manager and reviewed by the Project Board?

Medium
529

During which process is the Benefits Review Plan first created?

Medium
530

In PRINCE2, which two responsibilities are separated to ensure independent assurance?

Hard
531

During the Controlling a Stage process, the Team Manager completes a work package and delivers the products. What report does the Team Manager provide to the Project Manager?

Medium
532

The Project Board delegates authority to approve changes that are within a certain budget to a Change Authority. The Project Manager receives a Request for Change that is within this budget but will affect a configuration item that is not under the Change Authority's scope. What should the Project Manager do?

Hard
533

During the Controlling a Stage process, a Team Manager reports that a work package is complete. What should the Project Manager do next?

Hard
534

Which TWO of the following are purposes of the Directing a Project process?

Medium
535

What is the purpose of the Quality Register in PRINCE2?

Medium
536

A project manager is preparing the Business Case for a new project. The expected benefits are $500,000, and the expected costs are $400,000. However, there is a high risk that the benefits may be only $300,000 due to market uncertainty. According to PRINCE2 practices, how should the project manager reflect this in the Business Case?

Hard
537

Who is responsible for maintaining the Business Case throughout the project?

Easy
538

Which role is responsible for implementing the risk responses?

Easy
539

Which THREE of the following are components of the Project Initiation Documentation (PID)?

Hard
540

Match each level of management in PRINCE2 to its description.

Medium
541

In PRINCE2, what is the purpose of the Risk Register?

Easy
542

In PRINCE2, who owns the risk?

Hard
543

What is the purpose of the Managing a Stage Boundary process?

Easy
544

What is the purpose of the Quality Register?

Medium
545

Which document records the quality checks to be performed on a product?

Easy
546

According to PRINCE2, what is the definition of quality?

Medium
547

Which THREE of the following are components of the Business Case?

Medium
548

What is the definition of quality in PRINCE2?

Easy
549

Which TWO of the following are required components of the Product Description?

Medium
550

During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?

Medium
551

What is the definition of quality in PRINCE2?

Easy
552

Which role is responsible for maintaining the Business Case throughout the project?

Easy
553

Which role is responsible for independent assurance of the project?

Medium
554

Which document describes the quality methods and tools to be used, and the responsibilities for quality throughout the project?

Medium
555

A project is forecast to exceed its cost tolerance for the current stage. According to PRINCE2, what should the Project Manager do?

Medium
556

What is the purpose of the Managing a Stage Boundary process?

Medium
557

Based on the exhibit, what is the purpose of including expected dis-benefits in the Business Case?

Easy
558

Which document is the key output of the Initiating a Project process?

Medium
559

What is the primary difference between a Highlight Report and a Checkpoint Report?

Hard
560

In PRINCE2, who is responsible for ensuring that project assurance is independent of the Project Manager?

Medium
561

Which role is responsible for ensuring that the project's objectives are achieved and that the project delivers the required products?

Easy
562

Who chairs the Project Board?

Easy
563

Which risk response is appropriate for an opportunity?

Medium
564

Which report is produced by the Team Manager and sent to the Project Manager on a regular basis?

Medium
565

What is the definition of quality in PRINCE2?

Easy
566

What is the purpose of the Managing a Stage Boundary process?

Medium
567

In PRINCE2, what is the definition of quality?

Medium
568

A project is forecast to exceed its cost tolerance. What should the Project Manager do?

Hard
569

What is the difference between a risk owner and a risk actionee?

Hard
570

Which TWO of the following are components of the Business Case?

Medium
571

Which THREE of the following are components of a Product Description?

Medium
572

Who is responsible for maintaining the Business Case throughout the project?

Easy
573

Which role owns the Business Case in a PRINCE2 project?

Easy
574

Who is responsible for maintaining the Business Case throughout a PRINCE2 project?

Easy
575

In PRINCE2, which role is accountable for the business justification of a project?

Easy
576

What is the difference between a Request for Change and an Off-specification?

Medium
577

Which type of report is produced by the Project Manager to provide the Project Board with a summary of progress at the end of each stage?

Medium
578

What is the purpose of the product-based planning technique in PRINCE2?

Easy
579

Which TWO statements about the Change Authority are true?

Hard
580

Which role is accountable for the business justification of a PRINCE2 project?

Easy
581

What is the purpose of the Quality Register?

Medium
582

Which TWO are examples of opportunity responses in PRINCE2?

Medium
583

Which THREE of the following are responsibilities of the Project Board?

Hard
584

What is the difference between a Request for Change and an Off-specification?

Medium
585

Which TWO of the following are purposes of the Risk Management practice?

Medium
586

In PRINCE2, what is the definition of quality?

Medium
587

What is the difference between a Request for Change and an Off-specification?

Hard
588

Which of the following best describes the difference between a risk owner and a risk actionee?

Hard
589

Which of the following best describes the purpose of the Highlight Report?

Hard
590

Which register is used to record all identified risks that may affect the project?

Easy
591

What is the purpose of the Managing a Stage Boundary process?

Medium
592

In the Organising practice, what is the role of Project Assurance?

Medium
593

Which of the following is a threat response type in PRINCE2?

Hard
594

A project has identified a risk that a supplier may go bankrupt. The Project Manager decides to purchase insurance against this possibility. Which risk response type has been applied?

Hard
595

What is the purpose of the Managing a Stage Boundary process?

Medium
596

A project's Stage Plan shows the work for the next stage. Which plan details the work for a team to produce one or more products?

Hard

Frequently asked questions

What does the PRINCE2 Practices domain cover on the PRINCE2F exam?
PRINCE2 Practices questions test whether you can apply the concept in context, not just recognise a definition.
How many questions are in this domain?
This page lists all 596 PRINCE2 Practices questions in the PRINCE2F question bank. The actual exam draws from this domain proportionally to its weighting in the official exam blueprint.
What is the best way to practise this domain?
Start with a short focused session (10 questions) to identify gaps, then work through explanations. Repeat with a longer session once the weak areas feel solid.
Can I practise only PRINCE2 Practices questions?
Yes — the session launcher on this page filters questions to this domain only. Choose any session length for inline explanations and scoring.
peoplecert-prince2-foundation PEOPLECERT-PRINCE2-FOUNDATION prince2 practices Practice Questions