PRINCE2F · domain
People: organizations, teams, and leadership
Practise PRINCE2 Foundation People: organizations, teams, and leadership practice questions — original exam-style scenarios with answer choices, explanations, and analysis of common mistakes.
Focused practice
Practice People: organizations, teams, and leadership questions
Scored sessions drawing only from this domain — pick a length below.
Start 20-question practice test →What this domain covers
What to know about People: organizations, teams, and leadership
People: organizations, teams, and leadership questions test whether you can apply the concept in context, not just recognise a definition.
How the topic appears in realistic exam-style scenarios.
Which detail in the question changes the correct answer.
How to eliminate plausible but wrong options.
How to connect the question back to the wider exam objective.
Watch out for
Common People: organizations, teams, and leadership exam traps
- ▸Answering from memory before reading the full scenario.
- ▸Missing a constraint such as cost, availability, security, scope or command context.
- ▸Choosing a broad answer when the question asks for the most specific fix.
- ▸Ignoring why the wrong options are tempting.
Question index
All People: organizations, teams, and leadership questions (312)
Click any question to see the full explanation, or start a practice session above.
In PRINCE2, who is responsible for day-to-day management of the project within tolerances?
Easy2Which TWO of the following are responsibilities of the Project Manager?
Medium3In PRINCE2, why is the Project Manager role separated from the Project Assurance role?
Hard4Who is responsible for providing independent assurance to the Project Board that the project is on track?
Easy5During the Managing a Stage Boundary process, the Project Manager prepares an Exception Plan. What is the trigger for this activity?
Medium6Which document is produced in the Initiating a Project process and defines how the project will be managed?
Medium7In PRINCE2, what is the difference between a Request for Change (RFC) and an Off-specification?
Hard8Who is responsible for maintaining the Business Case throughout the project?
Easy9Which TWO of the following are responsibilities of the Project Board?
Medium10Which THREE of the following are characteristics of Project Assurance?
Hard11Refer to the exhibit. According to PRINCE2, to whom should the Team Manager report the potential delay?
Hard12In PRINCE2, who is responsible for the day-to-day management of the project within the tolerances set by the Project Board?
Medium13Which document describes the detailed activities, resources, and costs for a single management stage?
Medium14During a project, the Project Board is informed that a major change to the project scope is required. Which role is best placed to assess the impact on the Business Case?
Medium15Drag and drop the steps to close a project in PRINCE2 into the correct order.
Medium16In PRINCE2, who is responsible for managing the delivery of a Work Package?
Easy17In PRINCE2, how often does the Project Board typically meet?
Easy18Who is responsible for maintaining the Business Case throughout the project?
Easy19Which role provides independent assurance to the Project Board that the project is being managed correctly?
Easy20Who is responsible for appointing the Project Manager?
Easy21Which role chairs the Project Board?
Easy22Which role is responsible for managing the delivery of a Work Package?
Medium23A project is in its Controlling a Stage process. The Team Manager reports that a Work Package is likely to be completed late. The Project Manager reviews the Stage Plan and sees that stage tolerance is not forecast to be exceeded. What should the Project Manager do?
Hard24During the Initiating a Project process, which document is created to define the project's scope, objectives, and how it will be managed?
Medium25Who chairs the Project Board in PRINCE2?
Easy26What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
Hard27Which TWO of the following are elements of a Work Package?
Medium28Which THREE of the following are responsibilities of the Senior Supplier on the Project Board?
Medium29Which THREE of the following are responsibilities of the Project Manager?
Medium30Which TWO of the following are responsibilities of the Project Board?
Medium31Which role is responsible for managing the delivery of Work Packages and reporting progress to the Project Manager?
Medium32In PRINCE2, what is the purpose of the 'Managing a Stage Boundary' process?
Hard33The Project Board consists of three roles. Which of the following is NOT a mandatory role on the Project Board?
Hard34In PRINCE2, what is the main reason for separating the Project Manager role from the Project Assurance role?
Medium35According to PRINCE2, who is responsible for authorizing the work packages to be executed by the team?
Medium36Which TWO of the following statements about the Project Board are correct?
Hard37What is the minimum frequency of Project Board meetings?
Medium38The Project Board has delegated authority for change control decisions to a separate body. What is this body called?
Medium39Which role is responsible for the day-to-day management of the project within the tolerances set by the Project Board?
Easy40In PRINCE2, what is the role of the Senior Supplier on the Project Board?
Medium41The Project Manager notes that a Work Package is at risk of being delivered late. What should the Project Manager do?
Medium42Which PRINCE2 role is optional and provides administrative support to the project?
Easy43Which of the following is an optional role in the PRINCE2 project management team?
Easy44During which process is the Project Initiation Documentation (PID) created?
Medium45Why does PRINCE2 separate the Project Manager role from Project Assurance?
Hard46A Project Manager is appointed to a project during the Starting Up a Project process. The project has a complex technical scope. The SRO wants to ensure that the Project Board receives independent assurance on technical decisions. Who should provide this assurance?
Hard47Which role is responsible for ensuring that the project is being managed correctly from the business perspective?
Medium48Which TWO of the following are true about Project Assurance?
Easy49Which TWO statements about the project board are correct? (Choose two.)
Medium50Why does PRINCE2 separate the Project Manager from Project Assurance?
Hard51In PRINCE2, what is the difference between a Request for Change (RFC) and an Off-specification?
Hard52In PRINCE2, who manages the delivery of Work Packages?
Medium53Which role delegates change control decisions to a Change Authority?
Easy54Which role is responsible for the independent assurance that the project remains on track?
Medium55Which THREE of the following are reasons why PRINCE2 recommends separating the Project Manager from Project Assurance?
Hard56Which TWO of the following are roles that are part of the Project Board?
Medium57A large IT project is implementing a new customer relationship management (CRM) system for a multinational corporation. The project is organized with a Project Board comprising the Executive (VP of Sales), Senior User (Regional Sales Director), and Senior Supplier (IT Director). The Project Manager is an experienced PMP-certified professional. The team includes several business analysts and developers from an external supplier. The project has just completed the Initiating a Project process and received authorization to proceed to the next stage. However, during the first week of the Delivery Stage, the Project Manager notices that the business analysts are not collaborating effectively with the developers, leading to misunderstandings about requirements. The Project Manager holds a meeting and discovers that the business analysts feel excluded from decision-making and the developers complain about unclear specifications. The Project Manager wants to resolve this using PRINCE2 principles and practices. Which of the following is the BEST course of action?
Medium58Who is responsible for managing the delivery of a Work Package?
Easy59Why does PRINCE2 separate the Project Manager from Project Assurance?
Hard60What is the difference between a Request for Change (RFC) and an Off-specification?
Medium61In PRINCE2, a Team Manager reports to the Project Manager. What is the primary responsibility of a Team Manager?
Medium62What is the key difference between Project Assurance and Project Support?
Hard63Which THREE of the following statements about the Project Board are correct?
Medium64What is the key difference between Project Assurance and a quality review?
Medium65Which THREE of the following are responsibilities of the Project Manager?
Medium66Which role is responsible for the day-to-day management of a Work Package?
Medium67Which TWO of the following are roles defined in PRINCE2?
Medium68In PRINCE2, what is the difference between accountability and responsibility?
Hard69Who is responsible for maintaining the Business Case throughout the project?
Easy70The Project Board is considering a Request for Change. Which role is authorized to approve changes within delegated limits?
Medium71Which role is optional in the PRINCE2 project management team?
Easy72Which TWO statements about the Project Board are true?
Medium73Which role is accountable for the project's Business Case throughout the project?
Easy74Which role is responsible for ensuring the project provides value for money and is aligned with business strategy?
Easy75Which document is the key output of the Initiating a Project process?
Easy76Which PRINCE2 principle is being applied when the Project Manager escalates a forecast tolerance deviation to the Project Board?
Hard77Which TWO of the following are roles in the PRINCE2 project management team?
Easy78Who chairs the Project Board meetings?
Easy79In PRINCE2, who is responsible for managing the delivery of a Work Package?
Medium80Which role is responsible for maintaining the Business Case throughout the project?
Easy81A project is in the Managing a Stage Boundary process. Which key document is produced during this process?
Medium82The Project Board has delegated change control decisions to a Change Authority. What is the key benefit of this delegation?
Hard83Which TWO of the following are members of the Project Board?
Medium84Which role is responsible for preparing the Highlight Report?
Easy85The Project Board has approved an Exception Plan to recover from a budget overrun. The Project Manager updates the Project Plan. What else must the Project Manager update?
Medium86Who is responsible for maintaining the Business Case throughout the project?
Easy87What is the difference between a Request for Change (RFC) and an Off-Specification (Off-Spec)?
Hard88Which role is responsible for the day-to-day management of a Work Package?
Easy89Which role is responsible for maintaining the Business Case throughout the project?
Easy90Who is responsible for the day-to-day management of a project within the tolerances set by the Project Board?
Easy91What is the difference between a Request for Change and an Off-specification?
Medium92What is the primary purpose of the Managing a Stage Boundary process?
Hard93What is the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
Hard94A project is in the Initiating a Project process. Which document is the key output of this process?
Medium95What is the key difference between Project Assurance and Project Support?
Hard96Who is responsible for providing Project Support in PRINCE2?
Easy97Which TWO of the following are benefits of separating the Project Manager and Project Assurance roles?
Medium98Who is responsible for maintaining the Business Case throughout the project?
Easy99The Team Manager receives a Work Package and proceeds with the work. A product is found to be defective. What should the Team Manager do?
Medium100Which TWO of the following are differences between the Starting Up a Project (SU) and Initiating a Project (IP) processes?
Hard101Which THREE factors should be considered when designing the project management team structure? (Choose three.)
Hard102A team manager has completed a work package and is ready to hand over the deliverables. To whom should the team manager report the completion?
Medium103What is the main reason PRINCE2 separates the role of Project Manager from Project Assurance?
Hard104Why does PRINCE2 separate the Project Manager role from Project Assurance?
Hard105During project execution, a team member raises a concern that the project's objectives are not aligned with the organization's strategic goals. Which role is primarily responsible for ensuring alignment?
Easy106What is the purpose of the Managing a Stage Boundary process?
Easy107Which TWO of the following are responsibilities of the Project Manager?
Medium108In PRINCE2, which role is responsible for the day-to-day management of the project within the tolerances set by the Project Board?
Medium109Which role is responsible for providing administrative support to the project team?
Easy110In the PRINCE2 RACI model, what does 'Accountable' mean?
Medium111A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium112What is the purpose of the Change Authority role in PRINCE2?
Medium113A project is forecast to exceed its cost tolerance. What should the Project Manager do?
Medium114Which TWO of the following are true about the Senior Responsible Owner (Executive) role?
Medium115Which THREE of the following are defined roles in PRINCE2?
Medium116Which THREE of the following are responsibilities of the Project Board in PRINCE2?
Hard117A project is being executed in a stage. The Team Manager reports that a Work Package is likely to exceed its tolerances. What should the Project Manager do first?
Medium118Why does PRINCE2 separate the Project Manager role from Project Assurance?
Medium119What is the main purpose of separating the Project Manager role from the Project Assurance role in PRINCE2?
Hard120Which TWO of the following are responsibilities of the Project Manager in PRINCE2?
Medium121Which THREE of the following are defined as PRINCE2 project management team roles?
Hard122Which role ensures that the project's products meet the needs of the users?
Easy123What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
Hard124In PRINCE2, who is accountable for the project's success and the realization of benefits?
Easy125During the Initiating a Project process, which document is created that defines how the project will be controlled and governed?
Medium126Which THREE of the following are roles on the Project Board?
Medium127In a PRINCE2 project, the Project Manager submits an Exception Report. What is the most likely trigger for this report?
Medium128Which document describes the user's needs and expectations for the project's products?
Medium129What is the key difference between Project Assurance and a quality review?
Hard130Who is responsible for maintaining the Business Case throughout the project?
Easy131What is the primary purpose of the Project Support role in PRINCE2?
Easy132Which TWO of the following are responsibilities of the Project Assurance role?
Medium133Who is responsible for maintaining the Business Case throughout the project?
Easy134Which TWO of the following are responsibilities of the Project Board?
Medium135A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium136A project is forecast to exceed its cost tolerance for the current stage. What should the Project Manager do?
Medium137In PRINCE2, the Project Board should meet at which frequency?
Medium138Which TWO of the following are responsibilities of the Senior Responsible Owner (SRO)?
Medium139During the Managing a Stage Boundary process, the Project Manager creates the Stage Plan for the next stage. Who approves this Stage Plan?
Medium140Which TWO of the following statements correctly describe the relationship between the Project Manager and Project Assurance?
Medium141What is the key output of the 'Starting Up a Project' process?
Medium142Which THREE of the following are responsibilities of the Project Manager in PRINCE2?
Medium143During the Managing a Stage Boundary process, the Project Manager produces an Exception Plan. What triggers this?
Medium144A Project Manager delegates the management of a Work Package to a Team Manager. What is the Team Manager's responsibility?
Medium145Which document is the key output of the Initiating a Project process?
Medium146In PRINCE2, what is the primary difference between Project Assurance and a quality review?
Medium147A project is in the Initiating a Project process. Which document is the key output of this process?
Medium148Which role is responsible for maintaining the Business Case throughout the project?
Easy149During the Controlling a Stage process, the Project Manager identifies that the project is forecast to exceed the agreed cost tolerance for the current stage. What should the Project Manager do?
Medium150Which TWO of the following are true about Project Assurance?
Easy151What is the difference between a Request for Change and an Off-specification?
Hard152A project manager notices that team members from different departments are unclear about their roles and responsibilities. According to PRINCE2, which management product should be used to clarify this?
Easy153A project is in the Initiating a Project process. Which key document is produced as an output of this process?
Medium154What is the key difference between Project Assurance and a quality review?
Hard155Which TWO of the following are differences between Project Assurance and a quality review?
Medium156In the RACI model used in PRINCE2, what is the difference between accountability (A) and responsibility (R)?
Hard157In PRINCE2, which role provides independent assurance to the Project Board that the project is being conducted correctly?
Medium158Which of the following is NOT a responsibility of the Project Manager?
Medium159What is the key difference between Project Assurance and a quality review?
Hard160Which THREE of the following are responsibilities of the Project Manager?
Hard161A project is in the Initiating a Project process. Which role is responsible for preparing the Project Initiation Documentation (PID)?
Medium162Which statement correctly describes the relationship between Project Assurance and quality review?
Hard163Why does PRINCE2 separate the Project Manager role from Project Assurance?
Medium164What is the purpose of the Managing a Stage Boundary process?
Easy165Who is responsible for producing the Checkpoint Report?
Medium166In PRINCE2, why is the Project Assurance role separated from the Project Manager?
Hard167A stakeholder is concerned that the project is not delivering value for money. Which role should this concern be raised with?
Medium168What is the difference between a Request for Change and an Off-specification?
Hard169Which document is produced by the Team Manager to report progress on a Work Package?
Medium170A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium171In PRINCE2, who is responsible for maintaining the Business Case throughout the project?
Easy172Which role is responsible for maintaining the Business Case throughout the project?
Easy173Which PRINCE2 principle ensures that the Project Board delegates decision-making to the Project Manager within defined tolerances?
Easy174Why does PRINCE2 recommend separating the role of Project Manager from Project Assurance?
Hard175Which TWO roles are part of the Project Board?
Medium176Which TWO of the following are characteristics of the Project Assurance role?
Medium177How often should the Project Board meet during a PRINCE2 project?
Easy178Which role is responsible for ensuring that the project's products meet specified quality criteria?
Medium179Which THREE of the following are roles on the PRINCE2 Project Board?
Medium180What is the purpose of the Managing a Stage Boundary process?
Medium181In PRINCE2, what is the key difference between the Project Assurance role and a quality review?
Hard182What is the purpose of the Managing a Stage Boundary process?
Easy183Which TWO of the following are responsibilities of the Project Manager?
Medium184A Team Manager receives a Work Package from the Project Manager. During delivery, the Team Manager identifies a potential issue that may cause a delay. What should the Team Manager do first?
Hard185Which THREE of the following are responsibilities of the Project Board?
Medium186Which role is responsible for managing the delivery of a Work Package?
Easy187Which THREE of the following are true about Project Assurance in PRINCE2?
Hard188Which report is produced by the Team Manager and used by the Project Manager to update the Project Board?
Medium189In a PRINCE2 project, the Project Manager has also been assigned the Project Assurance role. Which PRINCE2 principle is being violated?
Hard190Match each PRINCE2 role to its responsibility.
Medium191A Senior Supplier is concerned that a proposed change will impact the project's technical feasibility. What should the Senior Supplier do?
Medium192In PRINCE2, why is the Project Manager not allowed to also perform Project Assurance?
Hard193Which role is responsible for project assurance activities in a PRINCE2 project?
Easy194In a PRINCE2 project, the project board is concerned that the project manager is not effectively communicating with key stakeholders. The project manager recently presented a detailed risk report to the board, but several board members were unaware of the critical risks identified. Which communication management activity should the project manager have performed to ensure the board was properly informed?
Hard195Which THREE of the following are responsibilities of the Senior Supplier role on the Project Board?
Hard196Which role can delegate change control decisions to a Change Authority?
Hard197Which role manages the day-to-day execution of a Work Package?
Easy198A Team Manager receives a Work Package from the Project Manager. To whom should the Team Manager report progress?
Medium199Which TWO of the following statements about the Change Authority role are correct?
Hard200In PRINCE2, what is the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
Hard201Who is responsible for managing the delivery of a Work Package?
Easy202Which of the following is NOT a role in the PRINCE2 project management team?
Medium203What is the difference between Project Assurance and a quality review?
Hard204A project is forecast to exceed its cost tolerance. What should the Project Manager do?
Medium205Which role is responsible for providing independent assurance to the Project Board that the project is on track?
Medium206Which role is accountable for the project's Business Case throughout the project?
Easy207Which TWO of the following statements about the Change Authority role are correct?
Medium208Which document is the key output of the Initiating a Project process?
Medium209Which of the following best describes the relationship between the Senior Responsible Owner (SRO) and the Project Sponsor in PRINCE2?
Hard210Who chairs the Project Board?
Easy211Who is responsible for ensuring that the project remains viable in terms of Business Case?
Easy212Why does PRINCE2 separate the Project Manager role from the Project Assurance role?
Hard213A project is in the Managing a Stage Boundary process. Which action should the Project Manager take?
Medium214What is the purpose of the Managing a Stage Boundary process?
Medium215Who is responsible for maintaining the Business Case throughout the project?
Easy216What is the purpose of the Directing a Project process?
Medium217Who chairs the Project Board meetings?
Easy218Which TWO of the following are responsibilities of the Senior Responsible Owner (SRO/Executive) on the Project Board?
Medium219What is the difference between a Request for Change and an Off-specification?
Hard220Which TWO of the following describe the role of Project Assurance?
Medium221Which TWO of the following are responsibilities of the Project Board?
Medium222Who is responsible for ensuring that Project Assurance is performed?
Medium223A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium224The project board decides to use majority voting for all decisions. What is a potential issue with this decision-making process?
Hard225Who chairs the Project Board?
Easy226Who is responsible for managing the project's day-to-day activities within the tolerances set by the Project Board?
Medium227Which role is ultimately accountable for the project's Business Case throughout the project?
Easy228Which document is used by the Project Manager to capture lessons learned during a stage?
Easy229Which TWO of the following are responsibilities of the Project Manager?
Medium230Which THREE of the following are typical responsibilities of the Project Support role?
Hard231Which role is responsible for ensuring that the project's products meet their specified quality criteria?
Easy232What is the difference between Project Assurance and a quality review?
Hard233According to PRINCE2, when should the Project Board meet?
Medium234A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium235What is the difference between a Request for Change (RFC) and an Off-Specification (Off-Spec)?
Easy236What is the difference between a Request for Change and an Off-specification?
Hard237The Project Board is meeting to make decisions when the project is not meeting its tolerances. What type of meeting is this?
Medium238Which TWO of the following are responsibilities of the Project Manager?
Medium239In which process does the Project Board authorize the next stage of a project?
Medium240The Project Board is reviewing an Exception Report that recommends a change to the project's scope. Who on the Project Board is primarily responsible for deciding whether the change is justified?
Medium241Why does PRINCE2 separate the Project Manager from Project Assurance?
Hard242In a large program, the project manager is struggling to get timely decisions from the project board due to conflicting priorities. What is the best PRINCE2 approach to address this?
Medium243What is the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
Hard244Which TWO of the following statements correctly describe the relationship between accountability and responsibility in PRINCE2?
Hard245According to PRINCE2, which role is responsible for defining the project's tolerances?
Medium246In PRINCE2, who is responsible for preparing and updating the Highlight Report?
Medium247Which TWO roles are optional in the PRINCE2 project management team?
Medium248A project is forecast to exceed its cost tolerance. What should the Project Manager do?
Medium249A Project Manager receives a forecast that a Work Package will exceed its tolerance. What should the PM do?
Medium250What is the key difference between Project Assurance and quality review?
Hard251During the Initiating a Project process, which document is created that defines how the project will be controlled?
Medium252The Project Board is meeting to authorize the start of a new stage. According to PRINCE2, how frequently should the Project Board meet?
Medium253Which TWO of the following are types of roles defined in a PRINCE2 project management team?
Easy254Who is accountable for the success of the project in PRINCE2?
Easy255In PRINCE2, what is the difference between a Senior Responsible Owner (SRO) and a Project Sponsor?
Hard256The Project Manager has issued a Work Package to a Team Manager. The Team Manager realizes that the work cannot be completed within the agreed tolerances. What should the Team Manager do first?
Medium257Which TWO of the following are responsibilities of the Project Manager in PRINCE2?
Easy258Which PRINCE2 role is responsible for preparing the Project Plan?
Medium259What is the purpose of the Managing a Stage Boundary process?
Easy260Which TWO of the following are purposes of the Starting Up a Project process?
Easy261What is the key difference between Project Assurance and a quality review?
Hard262Which document is the key output of the Initiating a Project process?
Easy263Which role is ultimately accountable for the project's Business Case and its continued viability?
Easy264Which document is the key output of the Initiating a Project process?
Easy265During the Controlling a Stage process, the Project Manager receives a Checkpoint Report from a Team Manager indicating a delay in delivering a Work Package. What should the Project Manager do first?
Medium266What is the role of Project Assurance?
Easy267What is the difference between a Request for Change and an Off-specification?
Hard268A project team is distributed across three time zones, causing communication delays. The project manager wants to apply the 'manage by stages' principle effectively. What should the project manager do first?
Hard269A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium270A project is running over time by 5% against the stage tolerance of 10%. The Project Manager expects this trend to continue. What should the Project Manager do?
Medium271What is the difference between Project Assurance and a quality review?
Hard272Which role is accountable for the project's success in PRINCE2?
Easy273A project has a strong matrix structure. The project manager finds that team members are more loyal to their functional managers than to the project. What is the best PRINCE2 practice to improve team commitment?
Medium274Which TWO statements correctly describe the role of the Senior User in PRINCE2?
Medium275When should the Project Board meet?
Easy276What is the purpose of the Starting up a Project process?
Easy277Who is responsible for maintaining the Business Case throughout the project?
Easy278Who is responsible for maintaining the Business Case throughout the project?
Easy279Which TWO of the following are responsibilities of the Project Manager?
Medium280What is the key difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
Hard281In PRINCE2, what is the difference between a risk owner and a risk actionee?
Hard282Which THREE of the following are purposes of the Directing a Project process?
Hard283During the Controlling a Stage process, a Work Package is authorized by the Project Manager. Who is responsible for delivering the Work Package?
Medium284A project manager notices that team members are frequently bypassing the project's defined escalation paths and going directly to senior stakeholders with issues. This is causing confusion and undermining the project's governance. Which PRINCE2 principle is being violated?
Medium285Which of the following statements best describes the difference between a Request for Change (RFC) and an Off-Specification (Off-spec)?
Hard286In PRINCE2, what is the purpose of Project Support?
Easy287Which document is the key output of the Initiating a Project process?
Medium288In PRINCE2, what is the role of the Senior User?
Medium289Which THREE of the following are true regarding Project Assurance?
Hard290Which role is responsible for producing the Highlight Report?
Medium291A project is in the Managing a Stage Boundary process. The Project Manager discovers that the stage is likely to overrun its time tolerance. The Project Board has not yet approved the next Stage Plan. What should the Project Manager do?
Hard292Which THREE of the following are responsibilities of the Project Board?
Hard293Which TWO of the following are optional roles in the PRINCE2 project management team?
Medium294A project is forecast to exceed its stage cost tolerance. What should the Project Manager do?
Medium295Who chairs the Project Board meetings in PRINCE2?
Medium296Which THREE of the following are elements of the PRINCE2 project management team?
Medium297Why does PRINCE2 separate the role of Project Manager from Project Assurance?
Hard298What is the difference between Project Assurance and a quality review?
Hard299The Project Board has not met for several months. According to PRINCE2, when should the Project Board meet?
Medium300A project is forecast to exceed its cost tolerance. What should the Project Manager do?
Hard301Which THREE statements about the Project Board's responsibilities in PRINCE2 are correct?
Hard302Which THREE of the following are true about the role of the Change Authority?
Hard303In PRINCE2, what is the recommended leadership style for a Project Manager when dealing with a team that has high competence and low commitment?
Hard304Which THREE of the following are responsibilities of the Project Support role?
Hard305What is the difference between a Request for Change (RFC) and an Off-specification?
Hard306What is the difference between a Request for Change (RFC) and an Off-specification (Off-spec)?
Medium307What is the difference between a Request for Change and an Off-specification?
Medium308Which PRINCE2 role is responsible for ensuring that the project's products meet the required quality criteria?
Medium309Which role is responsible for maintaining the Business Case throughout the project?
Easy310In PRINCE2, which role is responsible for ensuring that the business case is maintained and that the project remains viable?
Easy311What is the difference between the Senior Responsible Owner (SRO/Executive) and a Project Sponsor?
Hard312In PRINCE2, what is the key difference between Project Assurance and a quality review?
HardOther domains
All PRINCE2F exam domains
Frequently asked questions
- What does the People: organizations, teams, and leadership domain cover on the PRINCE2F exam?
- People: organizations, teams, and leadership questions test whether you can apply the concept in context, not just recognise a definition.
- How many questions are in this domain?
- This page lists all 312 People: organizations, teams, and leadership questions in the PRINCE2F question bank. The actual exam draws from this domain proportionally to its weighting in the official exam blueprint.
- What is the best way to practise this domain?
- Start with a short focused session (10 questions) to identify gaps, then work through explanations. Repeat with a longer session once the weak areas feel solid.
- Can I practise only People: organizations, teams, and leadership questions?
- Yes — the session launcher on this page filters questions to this domain only. Choose any session length for inline explanations and scoring.