Question 169 of 500
Business Continuity, DR & Incident ResponsehardMultiple SelectObjective-mapped

Quick Answer

The answer is simulation test and parallel test. A simulation test creates a controlled, isolated scenario—like a simulated power outage or ransomware attack—to evaluate team response and procedural accuracy without risking live systems, while a parallel test runs the disaster recovery site alongside the production environment to validate failover processes and data replication under real workload conditions. On the ISC2 Certified in Cybersecurity CC exam, this question tests your understanding of DR plan validation methods, often appearing as a multi-select item where you must distinguish active testing from passive reviews like checklists or tabletop exercises. A common trap is confusing a parallel test with a full-interruption test, which halts production; remember that parallel tests keep production running to verify synchronization mechanisms like asynchronous replication. For a memory tip, think “Simulate the scenario, parallel the production”—both methods prove the plan works without breaking live operations.

ISC2 CC Business Continuity, DR & Incident Response Practice Question

This CC practice question tests your understanding of business continuity, dr & incident response. Read the scenario carefully and evaluate each option against the stated constraints before committing to an answer. After answering, compare your reasoning against the explanation and wrong-answer breakdown below. Once you have made your selection, read the full explanation to reinforce the concept and understand why each distractor is designed to mislead on exam day.

Which TWO are appropriate methods to test a disaster recovery plan?

Question 1hardmulti select
Full question →

Answer choices

Why each option matters

Answer the question above first, then reveal the full breakdown to understand why each option is right or wrong.

Correct answer & explanation

Parallel test

A parallel test is appropriate because it runs the DR site in parallel with the production environment, allowing validation of failover processes and data replication without impacting live operations. This method verifies that the backup systems can handle real workloads and that synchronization mechanisms (e.g., asynchronous replication or log shipping) are functioning correctly. It provides a high-confidence check of the DR plan's effectiveness while maintaining business continuity.

Key principle: Answer the scenario, not the keyword: identify the specific constraint before choosing the most familiar-sounding option.

Answer analysis

Option-by-option breakdown

For each option: why learners choose it and why it is or isn't the right answer here.

  • Parallel test

    Why this is correct

    A common DR test method.

    Related concept

    Read the scenario before looking for a memorised answer.

  • Regression test

    Why it's wrong here

    Software testing technique.

  • Acceptance test

    Why it's wrong here

    Not a standard DR test type.

  • Simulation test

    Why this is correct

    Valid DR test method.

    Related concept

    Read the scenario before looking for a memorised answer.

  • Unit test

    Why it's wrong here

    Software testing technique.

Common exam traps

Common exam trap: answer the scenario, not the keyword

ISC2 often tests the distinction between DR testing methods (parallel, simulation, walkthrough) and software development testing types (unit, regression, acceptance), leading candidates to incorrectly select development tests as valid DR validation techniques.

Detailed technical explanation

How to think about this question

Parallel testing often involves setting up a secondary site with identical hardware and network configurations, then using tools like Oracle Data Guard or SQL Server Always On Availability Groups to replicate transactions. The test confirms that the DR site can assume production roles, including DNS changes, load balancer reconfiguration, and storage array failover (e.g., using NetApp SnapMirror or EMC RecoverPoint). A subtle behavior is that parallel tests may expose latency issues or split-brain scenarios if replication is not properly quiesced, which is why they require careful coordination and monitoring.

KKey Concepts to Remember

  • Read the scenario before looking for a memorised answer.
  • Find the constraint that changes the correct option.
  • Eliminate answers that are true in general but not in this case.

TExam Day Tips

  • Watch for words such as best, first, most likely and least administrative effort.
  • Review why wrong options are wrong, not only why the correct option is correct.

Key takeaway

Answer the scenario, not the keyword: identify the specific constraint before choosing the most familiar-sounding option.

Real-world example

How this comes up in practice

A security analyst at a medium-sized enterprise encounters this scenario during an investigation or architecture review. The correct answer reflects best practice for the specific threat or control described. Answer the scenario, not the keyword: identify the specific constraint before choosing the most familiar-sounding option. Security exam questions test whether you can match controls to threats in context — not just recall definitions.

What to study next

Got this wrong? Here's your next step.

Identify which exam domain this question belongs to, review the core concept, then practise similar questions from the same domain.

Related practice questions

Related CC practice-question pages

Use these pages to review the topic behind this question. This is how one missed question becomes focused revision.

Practice this exam

Start a free CC practice session

Short sessions build daily habit. Longer sessions build exam-day stamina. Try a timed session to simulate real conditions.

FAQ

Questions learners often ask

What does this CC question test?

Business Continuity, DR & Incident Response — This question tests Business Continuity, DR & Incident Response — Read the scenario before looking for a memorised answer..

What is the correct answer to this question?

The correct answer is: Parallel test — A parallel test is appropriate because it runs the DR site in parallel with the production environment, allowing validation of failover processes and data replication without impacting live operations. This method verifies that the backup systems can handle real workloads and that synchronization mechanisms (e.g., asynchronous replication or log shipping) are functioning correctly. It provides a high-confidence check of the DR plan's effectiveness while maintaining business continuity.

What should I do if I get this CC question wrong?

Identify which exam domain this question belongs to, review the core concept, then practise similar questions from the same domain.

What is the key concept behind this question?

Read the scenario before looking for a memorised answer.

About these practice questions

Courseiva creates original exam-style practice questions with explanations and wrong-answer analysis. It does not publish real exam questions, exam dumps, or protected exam content. Learn why practice questions differ from exam dumps →

How Courseiva writes practice questions · Editorial policy

Last reviewed: Jun 30, 2026

Question Discussion

Share a tip, memory trick, or ask about the reasoning behind this question. Do not post real exam questions, leaked content, braindumps, or copyrighted exam material. Comments are moderated and may be removed without notice.

Loading comments…

Sign in to join the discussion.

This CC practice question is part of Courseiva's free ISC2 certification practice question bank. Courseiva provides original exam-style practice questions with explanations, topic-based practice, mock exams, readiness tracking, and study analytics to help learners prepare for the CC exam.